IS 2395 PART 21994AI Search Enabled✦ AI Generated

Code of practice for painting concrete, masonry and plaster surfaces, Part 2: Schedules
1994 Edition

The 1994 edition of IS 2395 Part 2 delineates comprehensive painting schedules tailored for concrete, masonry, and plaster surfaces, addressing both indoor and outdoor applications. It supplements Part 1 by detailing the primer, undercoat, and finishing coat requirements for various paint types including distemper, emulsion, enamel, cement, and bituminous paints. This code is indispensable for engineers, architects, and contractors ensuring durable and visually appropriate coatings on calcareous substrates.

11Sections
30Clauses Indexed
AI Search Ready
1994Edition
Building Construction Practices including Painting Varnishing and Allied FinishingCategory
Alternative search terms: painting-schedules-for-concrete-masonry-and-plaster-surfaces-1994 PDF, painting-schedules-for-concrete-masonry-and-plaster-surfaces-1994 pdf free download, painting-schedules-for-concrete-masonry-and-plaster-surfaces-1994 free download pdf, painting-schedules-for-concrete-masonry-and-plaster-surfaces-1994 PDF, painting-schedules-for-concrete-masonry-and-plaster-surfaces-1994 PDF, painting-schedules-for-concrete-masonry-and-plaster-surfaces-1994 1994 PDF, painting-schedules-for-concrete-masonry-and-plaster-surfaces-1994:1994 PDF, painting-schedules-for-concrete-masonry-and-plaster-surfaces-1994-1994 PDF, painting-schedules-for-concrete-masonry-and-plaster-surfaces-1994 (1994) PDF, painting-schedules-for-concrete-masonry-and-plaster-surfaces-1994 1994 edition PDF, painting-schedules-for-concrete-masonry-and-plaster-surfaces-1994 edition 1994 PDF

What This Standard Covers

The 1994 edition of IS 2395 Part 2 delineates comprehensive painting schedules tailored for concrete, masonry, and plaster surfaces, addressing both indoor and outdoor applications. It supplements Part 1 by detailing the primer, undercoat, and finishing coat requirements for various paint types including distemper, emulsion, enamel, cement, and bituminous paints. This code is indispensable for engineers, architects, and contractors ensuring durable and visually appropriate coatings on calcareous substrates.

Who Uses This Standard

  • Structural engineers
  • Design architects
  • Professional painting contractors
  • Facility maintenance experts
  • Construction site managers
  • Quality assurance inspectors
  • Paint material suppliers

Key Topics Covered

Painting schedules for fresh calcareous substrates
Specifications for primers, undercoats, and topcoats
Guidelines for interior and exterior painting
Paint classifications: distemper, emulsion, enamel, cement, bituminous
Surface preparation techniques
Maintenance painting procedures
Treatment for algae, mould, and efflorescence affected surfaces
Alignment with related Indian Standards
Recommendations for paint thinning
Management of defects such as blistering, chalking, cracking, and flaking
Painting protocols for asbestos cement materials
Adaptation of international practices to Indian conditions

Table of Contents

1Scope and Fundamental Specifications
2Referenced Indian Standards and Their Roles
3Terminology and Definitions
4Essential Information for Painting Calcareous Surfaces
5Painting Schedules for Calcareous Surfaces
5.2Interior Painting Schedules for New Calcareous Surfaces
5.2.1Application of Coats and Surface Pretreatments
5.2.2Surface Preparation and Filling Requirements
5.3Maintenance Painting Guidelines
Annex ACompilation of Referenced Indian Standards
Annex BDetails of Committee Composition

Popular Questions About IS 2395 PART 2

?What primer and finishing coats are recommended for indoor painting of new concrete surfaces?

According to IS 2395 Part 2:1994, indoor painting of fresh concrete surfaces requires specific primer and finishing coats depending on the desired finish: white wash and colour wash use one coat of respective wash followed by two finishing coats; dry distemper requires a clear primer or sizing, filler if needed, then two coats; oil-bound distemper mandates an alkali-resistant primer with filler as necessary before two finishing coats; emulsion paints and other finishes follow similar patterns with one coat primer, optional filler or undercoat, and two finishing coats. Surfaces should be dry and free from contaminants to ensure proper adhesion and durability.

?How should surfaces contaminated with efflorescence or algae be prepared prior to painting?

Surfaces affected by algae or mould should be thoroughly cleaned using fungicidal solutions and allowed to dry completely before painting, as outlined in IS 2395 Part 1 clauses 5.6.2 and 5.6.3. For efflorescence, painting must be postponed until the efflorescence stops. The salts must be removed by dry brushing or washing, moisture sources corrected, and surfaces fully dried. Cracks and defects should be filled and feathered to ensure uniformity. These steps guarantee long-lasting paint adhesion and prevent premature paint failure.

?Which paint types does IS 2395 Part 2 specify for exterior masonry surfaces?

IS 2395 Part 2 (1994) includes schedules for exterior masonry painting covering white wash, colour wash, emulsion paints, flat and semigloss paints, gloss paints, chemical resistant paints, cement paints, and bituminous paints. Each type requires specific primer, undercoat, and finishing coats, often referencing other IS standards such as IS 5411 for emulsions, IS 168 and IS 1232 for flat paints, IS 133 and IS 2932/2933 for gloss paints, and IS 9862 for bituminous paints. Proper surface dryness and use of alkali-resistant primers are emphasized to enhance durability.

?What maintenance painting procedures does the standard recommend for surfaces showing blistering or cracking?

For surfaces exhibiting blistering or cracking, IS 2395 Part 2 advises complete removal of loose and damaged paint, thorough cleaning of biological growth following Part 1 guidelines, and addressing any efflorescence by delaying painting or undertaking remedial measures. Cracks and blisters must be filled with appropriate fillers or caulking materials before priming. After priming, inspect and refill any newly exposed defects, ensuring the substrate is dry and compatible paints are used. This method ensures restoration of surface integrity and prolongs paint life.

?How does IS 2395 Part 2 integrate with other Indian Standards related to painting and surface preparation?

IS 2395 Part 2 coordinates closely with numerous Indian Standards to provide comprehensive painting guidance. It references IS 2395 Part 1 for workmanship and operations, IS 3140 for asbestos cement products, and various paint-specific standards such as IS 133 for enamel paints, IS 427 and IS 428 for distempers, IS 5410 and IS 5411 for cement and emulsion paints, and IS 9862 for bituminous paints. This integration ensures primer, undercoat, and finishing applications are consistent with established norms, surface preparation is thorough, and maintenance protocols adhere to recognized quality standards.

Need Detailed Clause Answers?

Ask AI about any clause, requirement, or provision in IS 2395 PART 2. Get instant, clause-cited responses powered by our indexed library.

Free tier includes 150 queries (50 AI + 100 Reference) · No credit card required