IS 6061 Part 2 (1981) provides a detailed code of practice for constructing floors and roofs using precast reinforced concrete joists combined with hollow clay filler blocks. It guides engineers and builders on design, materials, casting, handling, and installation to achieve lightweight, thermally insulated, and acoustically efficient floor and roof systems. This standard is essential for professionals involved in building construction where hollow clay filler blocks are preferred for floor and roof assemblies.
Overview
IS 6061 Part 2 (1981) provides a detailed code of practice for constructing floors and roofs using precast reinforced concrete joists combined with hollow clay filler blocks. It guides engineers and builders on design, materials, casting, handling, and installation to achieve lightweight, thermally insulated, and acoustically efficient floor and roof systems. This standard is essential for professionals involved in building construction where hollow clay filler blocks are preferred for floor and roof assemblies.
Audience
Contents
Structure
Scope:
IS 6061 Part 2 primarily covers specifications and code of practices related to flooring and roofing materials including structural clay products, bitumen mastic flooring, rubber floors, linoleum, terrazzo, cement concrete tiles, epoxy resin toppings, PVC sheet flooring, burnt clay brick flooring, and waterproofing techniques.
Referenced Standards:
Information Exchange:
Clause 3.3 emphasizes the importance of proper communication between designer, builder, and user throughout construction.
Code of Practices Included:
flowchart LR
A[Designer] --> B[Specify Material & Flooring Type]
B --> C[Builder]
C --> D[Construction Stage]
D --> E[User]
E --> F[Feedback & Maintenance]
F --> A
For detailed formulas or tables, refer to the specific part or code of practice within IS 6061 Part 2 related to the material or flooring type of interest.
IS 6061 Part 2 – Definitions & Key Information
Definitions: As per Clause 2.1, definitions are adopted from:
Key Information for Design (Clause 3.1): For designing hollow clay filler block roofs/floors, gather:
Communication (Clause 3.3): Ensure proper info exchange between designer, builder, and user at all construction stages.
| Parameter | Description |
|---|---|
| Area | Total coverage and room sizes |
| Support | Type, dimensions, restrictions |
| Loads | Superimposed loads on floor/roof |
| Level | Finished floor/roof elevation |
| Junctions | Treatment with walls/parapets |
| Slope | For drainage purposes |
| Fixing Provisions | For services, ceiling attachments |
| Openings | Size and location in floor/roof |
flowchart LR
A[Designer] --> B[Builder]
B --> C[User]
C --> A
style A fill:#f9f,stroke:#333,stroke-width:2px
style B fill:#bbf,stroke:#333,stroke-width:2px
style C fill:#bfb,stroke:#333,stroke-width:2px
This cycle ensures smooth coordination throughout construction per IS 6061 Part 2.
IS 6061 Part 2 – Necessary Information for Design and Construction
For efficient design and construction of hollow clay filler block floors/roofs, the following key information must be provided (Clause 3.1):
Additional guidelines:
This data ensures safe, functional, and durable floor/roof design per IS 6061 Part 2.
flowchart TD
A[Design Requirements] --> B[Area & Room Sizes]
A --> C[Support Details]
A --> D[Load Specifications]
A --> E[Finished Level]
A --> F[Junction Treatments]
A --> G[Slope for Drainage]
A --> H[Fixing Provisions]
A --> I[Openings]
A --> J[Information Exchange]
IS 6061 (Part 2) - 1981: Materials Key Points
This part of IS 6061 primarily references materials related to structural clay products and flooring finishes, with specifications and codes of practice for various materials and finishes.
| Property | Value (Typical) |
|---|---|
| Compressive Strength | ≥ 3.5 N/mm² |
| Water Absorption | ≤ 15% |
| Modulus of Rupture | ≥ 1.0 N/mm² |
flowchart LR
Designer -->|Material specs| Builder
Builder -->|Material info| User
User -->|Feedback| Designer
This ensures proper communication of material requirements and quality control during construction.
IS 6061 Part 2: Precast Concrete Joists & Hollow Clay Filler Blocks Floor/Roof
graph TD
A[Floor Finish] --> B[Topping Concrete (cast-in-situ)]
B --> C[Hollow Clay Filler Blocks]
C --> D[Precast RCC Joists]
D --> E[Ceiling Finish (optional)]
For detailed design, refer to IS 6061 Part 2 tables and span charts specific to joist sizes and block dimensions.
IS 6061 Part 2 (1981) — Finishing of Floor and Ceiling
| Finish Type | IS Code |
|---|---|
| Bitumen mastic | IS 1196-1971 |
| Rubber | IS 1197-1970 |
| Linoleum | IS 1198-1958 |
| Cement concrete tiles | IS 1443-1972 |
| Terrazzo | IS 2114-1962 |
| Mud Phuska | IS 2115-1980 |
| In situ cement concrete | IS 2571-1970 |
| Epoxy resin | IS 4631-1968 |
| PVC | IS 5318-1969 |
| Brick | IS 5766-1970 |
graph TD
A[Ceiling Finish (optional)] --> B[Precast Prestressed Concrete Joists]
B --> C[Hollow Clay Filler Blocks]
C --> D[Topping Concrete with Reinforcement]
D --> E[Specified Floor Finish]
This framework ensures durable, standardized floor and ceiling finishes per Indian standards.
Key Specifications for Precast Reinforced Concrete Joists (IS 6061 Part 2)
| Age (Days) | % of 28-day Strength |
|---|---|
| 3 | 40-50% |
| 7 | 65-75% |
| 14 | 90-95% |
| 28 | 100% |
flowchart LR
A[Casting] --> B[Curing (7-14 days)]
B --> C[Maturing]
C --> D[Handling & Storage]
D --> E[Placement at Site]
For detailed reinforcement and mix design, refer to IS 456 and IS 1343.
Frequently Asked
IS 6061 Part 2 provides the following guidance on precast concrete joists:
| Parameter | Typical Range |
|---|---|
| Width of Joist | 100 mm to 150 mm (uniform) |
| Depth of Joist | Depends on span (e.g., 150 mm to 300 mm) |
| Spacing between Joists | 450 mm to 600 mm (center to center) |
| Span | Usually up to 4.5 m for precast joists |
Note: Exact dimensions depend on load, span, and filler block depth.
Loading diagram...
For detailed design, always consult Appendix A of IS 6061 Part 2 and relevant IS codes.
Quality requirements for hollow clay filler blocks are specified in:
IS 3951 (Part 1) - 1975: This standard covers the specifications for hollow clay blocks or tiles used as filler blocks in floor and roof construction.
IS 6061 (Part 2) - 1981: Code of practice for construction of floor and roof with joists and filler blocks specifically using hollow clay filler blocks. It references IS 3951 for quality requirements and provides construction guidelines.
| Standard | Purpose |
|---|---|
| IS 3951 (Part 1) | Quality and specifications for hollow clay blocks |
| IS 6061 (Part 2) | Code of practice for floors/roofs with hollow clay filler blocks |
Loading diagram...
In brief: Use IS 3951 for block quality and IS 6061 Part 2 for construction practice with hollow clay filler blocks.
To ensure durability of precast joists per IS 6061 Part 2, follow these steps:
| Step | Time/Condition |
|---|---|
| Mould release | ≥ 24 hours after casting |
| Initial curing | Keep damp 24 hours at casting site |
| Main curing | Moist curing for ≥ 7 days |
| Drying | Store shaded, dry for ≥ 3 weeks |
This process ensures strength development, surface quality, and durability of precast joists.
According to IS 6061 Part 2, Clause 5.5.5 and referencing IS 456-1978, the reinforcement for the topping concrete slab over filler blocks should be:
Additional points:
This reinforcement ensures the topping acts structurally with joists, functioning as a T-beam system.
Loading diagram...
IS 6061 Part 2 - Maximum Span and Load Limitations
Summary Table:
| Parameter | Limit/Condition |
|---|---|
| Max Joist Span | 6 m (normally) |
| Joist Spacing | As per design |
| Supports | Walls, beams |
| Load Types | Self-weight + imposed loads |
| Handling | Follow designer's instructions |
This ensures safe, durable construction using precast joists per IS 6061 (Part 2).
Loading diagram...
Ask AI about any clause, requirement, or provision in IS 6061 Part 2. Get instant, clause-cited responses powered by our indexed library.
Free tier includes 150 queries (50 AI + 100 Reference) · No credit card required