IS 5612 Part 2 (1977) specifies the requirements for hose-bandages used in fire brigade operations, focusing on materials, dimensions, workmanship, testing, and packaging. This standard ensures hose-bandages provide effective sealing and durability when used with fire hoses under pressure. It is essential for manufacturers, quality controllers, and fire safety engineers involved in producing or selecting hose-bandages for firefighting applications in India.
Overview
IS 5612 Part 2 (1977) specifies the requirements for hose-bandages used in fire brigade operations, focusing on materials, dimensions, workmanship, testing, and packaging. This standard ensures hose-bandages provide effective sealing and durability when used with fire hoses under pressure. It is essential for manufacturers, quality controllers, and fire safety engineers involved in producing or selecting hose-bandages for firefighting applications in India.
Audience
Contents
Structure
IS 5612 Part 2 (1977) - Scope: Sampling and Conformity
| Lot Size (units) | Sample Size | Permissible Defective |
|---|---|---|
| Up to 8 | All | 0 |
| 9 to 15 | 8 | 0 |
| 16 to 25 | 13 | 0 |
| 26 to 50 | 20 | 1 |
[ \text{Accept Lot if } D \leq D_{perm} ]
Where:
flowchart TD
A[Start: Lot Received] --> B{Lot Size?}
B -->|≤ 8| C[Sample All Units]
B -->|9-15| D[Sample 8 Units]
B -->|16-25| E[Sample 13 Units]
B -->|26-50| F[Sample 20 Units]
C --> G[Check Defectives ≤ 0?]
D --> G
E --> G
F --> H[Check Defectives ≤ 1?]
G -->|Yes| I[Accept Lot]
G -->|No| J[Reject Lot]
H -->|Yes| I
H -->|No| J
This ensures quality control per IS 5612 Part 2 standards.
Scope: Specification for Hose-Bandages used in Fire Brigade.
| Lot Size (N) | Sample Size (n) | Permissible Defective (d) |
|---|---|---|
| Up to 8 | All | 0 |
| 9 to 15 | 8 | 0 |
| 16 to 25 | 13 | 0 |
| 26 to 50 | 20 | 1 |
flowchart TD
A[Lot of Hose-Bandages] --> B[Select Sample Size (Table 1)]
B --> C[Test Sample]
C --> D{Number of Defectives ≤ Permissible?}
D -->|Yes| E[Lot Conforms]
D -->|No| F[Lot Rejected]
This ensures quality control through statistically valid sampling and clear acceptance criteria.
IS 5612 (Part 2) - Materials & Sampling Key Points
| Lot Size | Sample Size | Permissible Number of Defectives |
|---|---|---|
| Up to 8 | All | 0 |
| 9 to 15 | 8 | 0 |
| 16 to 25 | 13 | 0 |
| 26 to 50 | 20 | 1 |
flowchart TD
A[Start: Select Lot Size] --> B{Lot Size?}
B -->|≤8| C[Sample All, Accept if 0 defectives]
B -->|9-15| D[Sample 8, Accept if 0 defectives]
B -->|16-25| E[Sample 13, Accept if 0 defectives]
B -->|26-50| F[Sample 20, Accept if ≤1 defective]
For detailed testing and material specs, refer to IS 4228 for nylon tape and IS 5612 Part II for hose-bandage requirements.
IS 5612 Part 2 (1977) - Shape and Dimensions of Hose-Bandages
Nylon Binding:
Shape & Dimensions (Clause 4.1):
Sampling & Quality Control (Table 1):
| Lot Size | Sample Size | Permissible Defective |
|---|---|---|
| Up to 8 | All | 0 |
| 9 to 15 | 8 | 0 |
| 16 to 25 | 13 | 0 |
| 26 to 50 | 20 | 1 |
Summary:
Hose-bandages are made from 25 mm wide nylon tape, stitched, conforming to aeronautical tape specs, and dimensions per Fig.1. Sampling for quality follows Table 1 for defect limits.
flowchart LR
A[Nylon Tape 25mm] --> B[Stitched Edges]
B --> C[Hose-Bandage Shape (Fig.1)]
C --> D[Quality Sampling per Table 1]
For exact dimensions, refer to Fig. 1 in IS 5612 Part 2.
IS 5612 Part 2: Workmanship and Finish - Key Points
| Lot Size | Sample Size | Permissible Number of Defective |
|---|---|---|
| Up to 8 | All | 0 |
| 9 to 15 | 8 | 0 |
| 16 to 25 | 13 | 0 |
| 26 to 50 | 20 | 1 |
flowchart TD
A[Lot Size] --> B[Sample Size]
B --> C{Defective Items}
C -->|≤ Permissible| D[Lot Accepted]
C -->|> Permissible| E[Lot Rejected]
This ensures quality control and safety compliance in production per IS 5612 Part 2.
IS 5612 Part 2: Test for Leakage – Key Points
| Lot Size | Sample Size | Permissible Defective |
|---|---|---|
| Up to 8 | All | 0 |
| 9 to 15 | 8 | 0 |
| 16 to 25 | 13 | 0 |
| 26 to 50 | 20 | 1 |
Visually inspect hose-bandages for:
Any defect in these aspects means the piece is defective.
flowchart TD
A[Select Lot] --> B[Determine Sample Size (Table 1)]
B --> C[Random Sampling]
C --> D[Visual Inspection]
D --> E{Defects?}
E -- Yes --> F[Reject Lot or Defective Pieces]
E -- No --> G[Accept Lot]
IS 5612 Part 2: Marking - Key Points & Specifications
Clause 7.1.1:
Products may be marked with the Standard Mark indicating conformity.
Clause 7.1.2:
Use of the Standard Mark is regulated by the Bureau of Indian Standards Act, 1986. Licensing conditions must be obtained from BIS.
Sampling for Marking Conformity (Clause 1.2 & Table 1):
For lot conformity, sample sizes and permissible defective counts are:
| Lot Size | Sample Size | Permissible Defective |
|---|---|---|
| Up to 8 | All | 0 |
| 9 to 15 | 8 | 0 |
| 16 to 25 | 13 | 0 |
| 26 to 50 | 20 | 1 |
Additional Specs:
flowchart TD
A[Lot Received] --> B{Lot Size}
B -->|≤8| C[Inspect All Items]
B -->|9-15| D[Sample 8 Items]
B -->|16-25| E[Sample 13 Items]
B -->|26-50| F[Sample 20 Items]
C --> G{Defective?}
D --> G
E --> G
F --> G
G -->|Permissible Defects ≤ allowed| H[Mark with Standard Mark]
G -->|Exceeds Permissible Defects| I[Reject Lot]
Note: For detailed marking dimensions and exact shape, refer to Clause 4 of IS 5612 Part 2.
IS 5612 Part 2 – Packing of Hose-Bandages
| Lot Size (Nos) | Sample Size | Permissible Defective |
|---|---|---|
| Up to 8 | All | 0 |
| 9 to 15 | 8 | 0 |
| 16 to 25 | 13 | 0 |
| 26 to 50 | 20 | 1 |
flowchart TD
A[Hose-bandage] --> B[Roll neatly]
B --> C[Wrap in cellophane shroud]
C --> D[Pack 6 in corrugated carton]
D --> E[Sampling as per Table 1]
E --> F{Defective?}
F -->|No| G[Accept lot]
F -->|Yes| H[Reject lot]
Sampling and Criteria for Conformity as per IS 5612 Part 2
| Lot Size | Sample Size | Permissible Number of Defective |
|---|---|---|
| Up to 8 | All | 0 |
| 9 to 15 | 8 | 0 |
| 16 to 25 | 13 | 0 |
| 26 to 50 | 20 | 1 |
flowchart TD
A[Select Lot] --> B[Determine Lot Size]
B --> C{Lot Size?}
C -->|Up to 8| D[Sample = All]
C -->|9 to 15| E[Sample = 8]
C -->|16 to 25| F[Sample = 13]
C -->|26 to 50| G[Sample = 20]
D --> H[Count Defectives]
E --> H
F --> H
G --> H
H --> I{Defectives ≤ Permissible?}
I -->|Yes| J[Accept Lot]
I -->|No| K[Reject Lot]
Key points:
IS 5612 Part 2 (1977) - Sampling & Criteria for Conformity
| Lot Size | Sample Size | Permissible Number of Defective |
|---|---|---|
| Up to 8 | All | 0 |
| 9 to 15 | 8 | 0 |
| 16 to 25 | 13 | 0 |
| 26 to 50 | 20 | 1 |
flowchart TD
A[Lot Received] --> B[Random Sampling as per Table]
B --> C{Number of Defective in Sample}
C -->|<= Permissible| D[Lot Accepted]
C -->|> Permissible| E[Lot Rejected]
Frequently Asked
Under IS 5612 Part 2 (1977), the materials specified for hose-bandages for fire hoses are:
This ensures durability, ease of use, and reliable performance in fire brigade applications.
According to IS 5612 Part 2, hose-bandages are tested for leakage as follows:
This test ensures the bandage's sealing performance under pressure without compromising integrity.
Loading diagram...
Dimensional and Shape Requirements for Hose-Bandages (IS 5612 Part 2):
Shape & Dimensions:
Hose-bandages must conform to the shape and dimensions shown in Fig. 1 of the code, which specifies a bandage with a 25 mm wide nylon binding, stitched securely.
Material:
The bandage consists of the bandage fabric with nylon binding and a nylon string for securing.
Inspection:
Visual inspection for shape, dimensions, workmanship, finish, and leakage is mandatory. Defective pieces are rejected.
Leakage Test:
When wrapped around a delivery hose pressurized at 70 N/cm² (7 kgf/cm²) over a 3 mm hole and tied with nylon string, the bandage must not loosen or leak for 5 minutes (minor side seepage allowed).
| Parameter | Requirement |
|---|---|
| Nylon Binding Width | 25 mm |
| Pressure for Test | 70 N/cm² (7 kgf/cm²) |
| Leak Test Duration | 5 minutes |
| Hose Hole Diameter | 3 mm |
| Material | Bandage + Nylon binding + Nylon string |
Loading diagram...
This ensures the bandage fits correctly and performs reliably under operating pressure.
Lot Conformity Determination and Sampling (IS 5612 Part 2)
Lot Definition (A-1.1): A lot consists of hose-bandages produced under similar conditions, grouped in lots of ≤ 50 units.
Sampling Method (A-1.3): Samples are selected randomly from each lot using random number tables to avoid bias.
Sample Size & Acceptance Criteria (Table 1 & Clause 1.2):
| Lot Size | Sample Size | Permissible Defective Units |
|---|---|---|
| Up to 8 | All | 0 |
| 9 to 15 | 8 | 0 |
| 16 to 25 | 13 | 0 |
| 26 to 50 | 20 | 1 |
Loading diagram...
This ensures quality control by statistically validating each lot against strict defect limits.
According to IS 5612 Part 2, manufacturers must follow these marking and packaging requirements:
Each hose-bandage shall be clearly and permanently marked with:
Additionally:
This ensures product traceability and protection during transport/storage.
Ask AI about any clause, requirement, or provision in IS 5612 Part 2. Get instant, clause-cited responses powered by our indexed library.
Free tier includes 150 queries (50 AI + 100 Reference) · No credit card required