Byelaws for the construction of cinema buildings

IS 4878:1986 provides comprehensive byelaws for the design, construction, and maintenance of cinema buildings in India. It addresses safety, fire protection, structural requirements, ventilation, electrical installations, and sanitary provisions to ensure safe and orderly development of cinema theatres. This standard is essential for architects, engineers, and authorities involved in cinema construction and licensing.

14Sections
552Clauses Indexed
AI Search Ready
1986Edition
Planning Housing and pre-fabricated constructionCategory
Alternative search terms: IS 4878 PDF, IS 4878 pdf free download, IS 4878 free download pdf, IS4878 PDF, IS-4878 PDF, IS 4878 1986 PDF, IS 4878:1986 PDF, IS 4878-1986 PDF, IS 4878 (1986) PDF, IS 4878 1986 edition PDF, IS 4878 edition 1986 PDF

What This Standard Covers

IS 4878:1986 provides comprehensive byelaws for the design, construction, and maintenance of cinema buildings in India. It addresses safety, fire protection, structural requirements, ventilation, electrical installations, and sanitary provisions to ensure safe and orderly development of cinema theatres. This standard is essential for architects, engineers, and authorities involved in cinema construction and licensing.

Who Uses This Standard

  • Architects specializing in cinema and public assembly buildings
  • Structural and civil engineers
  • Fire safety and protection engineers
  • Building inspectors and municipal authorities
  • Cinema theatre owners and operators
  • Mechanical and electrical engineers
  • Urban planners and regulatory bodies

Key Topics Covered

Building permits and administrative procedures
Structural design and height limitations
Fire protection systems including sprinklers and fire escapes
Projection room and equipment safety requirements
Ventilation and air-conditioning standards
Exit and access design including staircases and ramps
Sanitary installations and water supply
Electrical installations and safety
Maintenance and cleanliness protocols
Open space and parking requirements
Seating arrangements and visibility
Requirements for semi-permanent cinema buildings

Table of Contents

1Scope

IS 4878 - Scope: Key Specifications & Tables

Scope (Clause 1):
IS 4878 covers design, construction, and safety requirements for cinema buildings, including permanent and semi-permanent structures.


Key Specifications from the Code:

  • Materials & Specifications (Clause 3.7.2.5):

    • Detailed specifications with type and grade of materials must accompany the notice, signed by licensed architect/engineer (see Appendix D).
  • Plans & Data Submission (Clause 13.2.2):

    • All plans/specifications for HVAC systems must be submitted to the Authority when required.
  • Drawing Sheet Sizes & Colour Coding (Clause 3.7.2.1):

DesignationTrimmed Size (mm)Untrimmed Size (mm)
A0841 × 1189880 × 1230
A1594 × 841625 × 880
A2420 × 594450 × 625
A3297 × 420330 × 450
A4210 × 297240 × 330
A5148 × 210165 × 240

Summary:

  • IS 4878 mandates comprehensive documentation including material specs, drawings, and HVAC details.
  • Drawing sheets must conform to sizes in Table 1.
  • Signed specifications ensure accountability and compliance.
  • Refer to Appendix D for application forms and detailed submission requirements.
flowchart LR
    A[Start: Cinema Building Design] --> B[Prepare Plans & Specifications]
    B --> C{Include Material Specs?}
    C -->|Yes| D[Signed by Licensed Architect/Engineer]
    D --> E[Submit Notice with Docs]
    C -->|No| F[Revise Specs]
    E --> G[Submit HVAC Plans if Required]
    G --> H[Authority Review & Approval]
    H --> I[Proceed with Construction]

For detailed design and safety clauses, consult respective sections (4-16).

2Definitions

IS 4878: Definitions & Specifications Summary

  • Clause 2.0 (Terminology): Defines key terms related to air-conditioning and heating systems for clarity and uniformity in design and construction.

  • Clause 3.7.2.5 (Specifications):

    • All specifications (general & detailed) must specify type and grade of materials.
    • Specifications must be signed by a licensed architect or engineer.
    • Specifications accompany the notice as per Appendix D.
  • Clause 13.2.2:

    • All plans, specifications, and data for HVAC systems must be submitted to the relevant authority when requested.

Key Points for Specifications:

ParameterRequirement
Material Type & GradeClearly specified in documents
ApprovalSigned by licensed architect/engineer
SubmissionTo authority on demand

Practical Tip:

Always refer to Appendix D for detailed format and content of specifications to ensure compliance.

flowchart LR
    A[Design Phase] --> B[Prepare Specifications]
    B --> C{Include Type & Grade of Materials?}
    C -- Yes --> D[Sign by Licensed Architect/Engineer]
    D --> E[Submit with Notice]
    E --> F[Authority Review]

This ensures clarity, accountability, and regulatory compliance in HVAC system design.

3Administrative Procedures and Permits

IS 4878 – Administrative Procedures and Permits: Key Points

1. Administration (Clause 3)

  • Governed by local licensing authorities (e.g., Executive Engineer, Licensing Authority Delhi).
  • Compliance with zoning regulations (Clause 2.56) is mandatory.
  • Specifications of materials and design, signed by licensed architect/engineer, must accompany the construction notice (Clause 3.7.2.5).

2. Permits and Documentation (Appendices)

AppendixPurposePage
ANotice for Construction of Cinema Building63
BNotification for Grant of No Objection Certificate64
CNo Objection Certificate (NOC)65
DApplication for Cinema Building Permit/License66
EForm for Supervision67
FGuide for Qualifications of Licensed Engineers/Architects68
GForm for Sanction or Refusal of Building Permit69
HForm for Notice of Commencement70
JForm for Completion Certificate71
KForm for Occupancy Certificate72
LOff-Street Parking Spaces73

3. Key Specifications (Clause 3.7.2.5)

  • Detailed material type and grade must be submitted.
  • Signed by licensed professionals.
  • Ensures safety and compliance with code.

Summary Flow of Administrative Procedure

flowchart TD
    A[Submit Notice for Construction (Appx A)] --> B[Submit Specifications (Clause 3.7.2.5)]
    B --> C[Application for Permit/License (Appx D)]
    C --> D[Grant or Refusal of Permit (Appx G)]
    D -->|If Granted| E[Start Construction (Notice of Commencement - Appx H)]
    E --> F[Supervision & Compliance (Appx E)]
    F --> G[Completion Certificate (Appx J)]
    G --> H[Occupancy Certificate (Appx K)]

Note: Always refer to the local licensing authority for specific procedural requirements and timelines.

6Open Spaces and Parking

IS 4878: Off-Street Parking Spaces (Appendix L & Clause 8.1)

Key Points:

  • Off-street parking must comply with Appendix L and local Development Control Rules.
  • Parking space includes the parking area + driveway for easy vehicle ingress/egress (Clause 2.42).

Typical Specifications for Parking Spaces (as per IS 4878 Appendix L):

Vehicle TypeParking Space Size (m)Remarks
Car (4-wheeler)2.5 m x 5.0 mStandard parking bay size
Two-wheeler1.0 m x 2.0 mFor motorcycles/scooters
Driveway WidthMinimum 3.0 mFor two-way movement
  • Driveway should allow smooth ingress/egress without reversing onto the street.
  • Parking layout must ensure clear maneuvering space.

Formula for Parking Area Estimation:

[ \text{Total Parking Area} = N \times (L \times W) + \text{Driveway Area} ] Where:

  • (N) = Number of vehicles
  • (L, W) = Length and width of parking space

flowchart LR
    A[Entrance/Exit] --> B[Driveway (≥3m wide)]
    B --> C[Parking Bays]
    C --> D[Vehicle Parked]

Summary: Follow Appendix L dimensions, ensure driveways for easy vehicle movement, and check local Development Control Rules for compliance.

7Height Limitations

IS 4878: Height Limitations Summary

  • Clause 7.2 governs height/number of storeys based on:
    • FAR (Floor Area Ratio) limits
    • Open spaces (see Clause 5)
    • Width of street fronting the plot

Key Specifications:

Street Width (m)Max Height to Lowest Member (m)Notes
< 5Refer local bylawsMore restrictive controls
5 to < 6.7Up to 6.7 mModerate height allowed
≥ 6.76.7 m or moreHigher structures permitted

Important Points:

  • Additions/Extensions (6.3.2): Allowed only if open space requirements (Clause 6.1) are maintained post-extension.
  • Height restrictions ensure adequate light, ventilation, and safety.
  • Street width controls help prevent overcrowding and fire hazards.

Formula for FAR:

[ \text{FAR} = \frac{\text{Total covered area on all floors}}{\text{Plot area}} ]

Height and storeys are limited to keep FAR within permissible limits.


flowchart TD
    A[Plot with Street Width] --> B{Street Width}
    B -->|<5 m| C[Low Height Limit]
    B -->|5 to <6.7 m| D[Medium Height Limit (up to 6.7 m)]
    B -->|≥6.7 m| E[Higher Height Limit (≥6.7 m)]
    E --> F[Check FAR & Open Spaces]
    F --> G[Approve Building Height]

In essence: Check street width → Apply height limit → Verify FAR & open space → Approve construction.

9Building Components and Facilities

IS 4878: Building Components and Facilities - Key Specifications

Functional Requirements (Clause 13.2.2 & 13.2.3)

  • All HVAC (Heating, Ventilation, and Air Conditioning) plans and specifications must be submitted for approval.
  • Plans should include:
    • Building identification (name, type, location)
    • Owner details
    • Orientation (North point)
    • Room dimensions, height, and intended use
    • Construction details of walls, roofs, floors, windows, and doors (including insulation and finishes)
    • HVAC equipment layout: cooling towers, ducts, air distribution, refrigeration, heating plants
    • Details of dampers in air supply systems
    • Chimney/gas vent dimensions and height
    • Internal equipment loads (people, motors, heaters, lighting)
    • Fire separation locations and grades

Constructional Practices (Clause 12.1)

  • Follow SP:7-1983 for construction safety, material handling, and demolition.

Summary Table: HVAC Plan Requirements

ItemDetails Required
Building & Owner InfoName, type, location, owner name
OrientationNorth point on plans
Room DetailsDimensions, height, intended use
Wall, Roof, Floor, WindowConstruction, insulation, finish
HVAC LayoutCooling tower, ducts, air distribution system
Equipment DetailsRefrigeration, heating plant, air handling units
DampersType and location
Chimney/VentSize, shape, height
Internal LoadsPeople, motors, heaters, lighting
Fire SeparationsLocation and grade

flowchart TD
    A[Building Info] --> B[Room Dimensions & Use]
    B --> C[Wall, Roof, Floor Details]
    C --> D[HVAC Equipment Layout]
    D --> E[Air Distribution & Dampers]
    E --> F[Internal Loads & Fire Separations]
    F --> G[Submission to Authority]

This ensures compliance with IS 4878 for building facilities and HVAC systems.

10Means of Access and Exits

IS 4878: Means of Access and Exits - Key Points

1. Means of Access (Clause 4.1.1, Table 4)

  • Minimum width of means of access depends on the length:
Length of Means of Access (m)Minimum Width (m)
Up to 20012.0
Up to 40015.0
Up to 60018.0
Above 60024.0
  • Width of means of access shall not be less than internal accessways.

2. Capacity of Exits (Clause 10.3.2)

  • Exit capacity must be adequate for safe evacuation.
  • Capacity depends on occupant load and exit width.
  • Typically, exit width is calculated based on the number of persons and a unit width per person (e.g., 0.5 m per 60 persons).

3. Arrangement of Exits (Clause 10.3.3)

  • Exits should be arranged to provide safe, unobstructed egress.
  • Multiple exits required for large occupant loads.
  • Exits must be distributed to avoid congestion and ensure rapid evacuation.

4. Types of Exits (Clause 10.1)

  • Doors, staircases, ramps, and other approved means.
  • Must comply with fire safety and accessibility norms.

flowchart LR
    A[Occupant Load] --> B[Calculate Exit Width]
    B --> C{Means of Access Length}
    C -->|<=200m| D[Width = 12m]
    C -->|<=400m| E[Width = 15m]
    C -->|<=600m| F[Width = 18m]
    C -->|>600m| G[Width = 24m]
    D & E & F & G --> H[Check Internal Access Width]
    H --> I[Final Means of Access Width]

Summary:

  • Use Table 4 for means of access width based on length.
  • Ensure exit capacity matches occupant load with adequate width.
  • Arrange multiple exits for safety and compliance.
13Seating Requirements and Lifts

IS 4878: Seating Requirements and Lifts

Seating Requirements (Clause 13.5)

  • Seat Width:
    • Average width ≥ 50 cm
    • Minimum width ≥ 45 cm (Clause 13.5.2)
  • Intervening Space (Legroom):
    • Minimum 30.5 cm between back of one seat and front of the next (measured perpendicularly) (Clause 13.5.4)

Provisions for Lifts (Clause 13.6)

  • The code mandates appropriate provisions for lifts in buildings, ensuring accessibility and safety.
  • While IS 4878 does not give detailed formulas, typical design considerations include:
    • Lift capacity based on occupant load.
    • Minimum car dimensions to accommodate users and wheelchairs.
    • Compliance with relevant accessibility standards (e.g., IS 14665 for lifts).

Summary Table: Seating Dimensions

ParameterMinimum Value
Seat Width (min)45 cm
Seat Width (average)50 cm
Intervening Space (legroom)30.5 cm

flowchart TD
    A[Seating Arrangement] --> B[Seat Width ≥ 45 cm]
    A --> C[Average Seat Width ≥ 50 cm]
    A --> D[Legroom ≥ 30.5 cm]
    E[Lift Provision] --> F[Capacity based on occupant load]
    E --> G[Minimum car dimensions]
    E --> H[Accessibility compliance]

For detailed lift design, refer to IS 14665 and relevant elevator codes.

14Electrical Installations

IS 4878 – Electrical Installations: Key Points

Design Considerations (Clause 14.2.1.1)

When planning electrical wiring installations, consider:

  • Supply type, occupancy, load & earthing arrangement
  • Atmospheric conditions: temperature, moisture, corrosive environment
  • Presence of inflammable/explosive materials
  • Electrical & mechanical protection level
  • Continuity of service & standby supply needs
  • Future modification/extension possibilities
  • Operation & maintenance costs
  • Cost comparison of alternative methods
  • Radio/telecommunication interference suppression
  • Ease of maintenance
  • Safety aspects
  • Energy conservation

Reference Standards

  • For detailed layout & equipment location (sub-stations, switchboards, etc.), refer to SP:7-1983, Part VIII, Section 2.
  • For lift electrical planning, refer to SP:7-1983, Part VIII, Section 5.

Summary Table of Planning Factors

FactorConsideration
Supply & LoadType, earthing, occupancy
EnvironmentTemperature, moisture, explosive presence
ProtectionElectrical & mechanical
ContinuityStandby supply, critical loads
Future-proofingModification, extension
CostOperation, maintenance, alternative methods
InterferenceRadio/telecom suppression
MaintenanceAccessibility, ease
SafetyCompliance with safety norms
EnergyConservation methods

For detailed electrical design formulas (like load calculations, cable sizing), consult SP:7-1983 and relevant IS codes such as IS 732 (Wiring), IS 3043 (Earthing).

flowchart LR
    A[Start: Electrical Installation Design]
    A --> B[Assess Supply & Load]
    B --> C[Check Environmental Conditions]
    C --> D[Determine Protection Level]
    D --> E[Plan for Continuity & Standby]
    E --> F[Consider Future Extensions]
    F --> G[Evaluate Costs & Interference]
    G --> H[Ensure Safety & Energy Conservation]
    H --> I[Refer SP:7-1983 for Details]
    I --> J[Finalize Design]
15Fire Protection

IS 4878: Fire Protection Key Points

1. Fire Resistance Ratings (Clause 15.1.2)

  • Refer to Table 3 for fire resistance ratings of structural and non-structural members.
  • Ratings depend on material type and construction method.
  • Typical ratings range from 1 hour to 4 hours for load-bearing elements.

2. Fixed Fire Fighting Installations (Clause 15.10)

  • Installations must comply with relevant national standards (e.g., IS 3844, IS 15105).
  • Includes sprinkler systems, hydrants, and fire extinguishers.
  • Ensure adequate water supply, pressure, and coverage per building size.

3. Audio-Visual Fire Alarm Systems (Clause 14.6)

  • Amplifying and sound distribution systems must follow SP:30-1984 guidelines.
  • Ensure clear, audible alarms for evacuation.

Typical Fire Resistance Table (Excerpt from IS 4878 Table 3):

Member TypeFire Resistance Rating (hours)
Load-bearing RCC2 to 4
Load-bearing Brick1 to 2
Non-load-bearing walls1
Steel members (protected)2 to 3

flowchart LR
    A[Fire Protection] --> B[Fire Resistance Ratings]
    A --> C[Fixed Fire Fighting Installations]
    A --> D[Audio-Visual Alarm Systems]
    B --> E[Structural Members]
    B --> F[Non-structural Members]
    C --> G[Sprinklers]
    C --> H[Hydrants]
    C --> I[Extinguishers]
    D --> J[Sound Systems per SP:30-1984]

For detailed design, refer to IS 4878 Table 3 and relevant fire safety codes like IS 3844.

16Water Supply and Drainage

IS 4878: Water Supply & Drainage - Key References

  • Clause 16.3 mandates design & maintenance per SP:7-1983, Part IX Plumbing Services:
    • Section 1: Water Supply
    • Section 2: Drainage & Sanitation

Key Aspects from SP:7-1983 (Plumbing Services)

ParameterTypical Values / Notes
Water DemandDomestic: 135-150 lpcd (liters per capita per day)
Pipe Slope for Drainage1:40 to 1:60 (depending on pipe diameter)
Minimum Pipe DiameterWater supply: 15 mm; Drainage: 100 mm (for soil pipes)
Trap Seal DepthMinimum 75 mm to prevent sewer gases
Vent Pipe DiameterMinimum 50 mm

Basic Formulas

  • Water Demand (Q): [ Q = \text{Population} \times \text{Demand per capita} ]

  • Flow Velocity in Drain Pipes: [ V = \frac{4Q}{\pi d^2} ] where (d) = pipe diameter, (Q) = flow rate

  • Slope (S) for self-cleansing velocity: [ S = \frac{V^2}{2gR} ] where (R) = hydraulic radius, (g) = acceleration due to gravity


Summary Diagram

flowchart TD
    A[Water Supply] --> B[Demand Calculation]
    B --> C[Pipe Sizing]
    C --> D[Distribution Network]
    A --> E[Storage]
    F[Drainage & Sanitation] --> G[Trap & Vent Design]
    G --> H[Pipe Slope & Diameter]
    H --> I[Disposal System]

For detailed design, always refer to SP:7-1983, Part IX sections 1 & 2 as per IS 4878 Clause 16.3.

17Maintenance and Cleanliness

IS 4878 - Maintenance and Cleanliness (Clause 17.5)

Key specifications for maintenance and cleanliness of cinema buildings:

  • Ventilation: All windows and ventilation means must be kept in good order.
  • Sanitation: Entire building to be maintained in proper sanitary conditions.
  • Walls: Hot lime washing at least once every 2 years or as directed.
  • Cleaning Frequency: Premises and refuse removal at least every 24 hours or more frequently if required.
  • Electrical Equipment: Fans, glass, shades to be cleaned periodically and kept presentable.
  • Mechanical Equipment: Exhaust fans, AC plants, lifts to be cleaned and inspected regularly.
  • Fire Fighting Installations: Periodic inspection to ensure operability.
  • Storage Tanks: Regular inspection and periodic cleaning.

Air Conditioning Fresh Air Requirements (Clause 13.2.6)

Air Requirements (m³/min per occupant)Smoking AreaNon-Smoking Area
0.42Some0.28
0.21None0.14
  • Minimum outside fresh air must be related to occupant number and enclosure volume.

flowchart TD
    A[Maintenance] --> B[Ventilation: Windows & Vents]
    A --> C[Sanitation: Cleanliness & Refuse Removal]
    A --> D[Wall Treatment: Hot Lime Washing]
    A --> E[Electrical Equipment Cleaning]
    A --> F[Mechanical Equipment Inspection]
    A --> G[Fire Fighting Installations Inspection]
    A --> H[Storage Tank Cleaning]

Summary: Maintain cleanliness by scheduled cleaning, inspections, and sanitation; ensure adequate ventilation and fresh air per occupant as per IS 4878.

18Semi-Permanent Cinema Buildings

IS 4878: Semi-Permanent Cinema Buildings – Key Points

Definition (Clause 2.48)

  • Constructed with non-inflammable materials.
  • Side walls: 1.0 m high plastered walls.
  • Above walls: covered with durable black canvas, tarpaulin curtains, or similar to block light and rain.

Planning Requirements (Clause 19.1)

  • Must address:
    • Traffic load and parking spaces.
    • Fire fighting provisions.
    • Building service installations (electrical, ventilation).
    • Water supply and drainage.
    • Safety requirements equivalent to permanent cinema buildings.

Specifications Summary:

FeatureSpecification
Side walls height1.0 m plastered
Wall coveringBlack canvas/tarpaulin curtains
MaterialNon-inflammable
Safety & servicesAs per permanent cinema standards

Important Notes:

  • No explicit load formulas are given in IS 4878 for semi-permanent structures.
  • Use load calculations and fire safety norms from permanent cinema building clauses or relevant IS codes (e.g., IS 875 for loads, IS 1641 for fire safety).
  • Ensure adequate drainage and ventilation to prevent moisture and heat buildup.
flowchart TD
    A[Semi-Permanent Cinema Building] --> B[1.0 m Plastered Walls]
    A --> C[Black Canvas/Tarpaulin Curtain]
    A --> D[Non-Inflammable Materials]
    A --> E[Safety & Services as Permanent]
    E --> F[Traffic Load & Parking]
    E --> G[Fire Fighting]
    E --> H[Water Supply & Drainage]

For detailed structural design, refer to IS 875 for loadings and IS 1641 for fire safety standards.

Appendix KForm for Occupancy Certificate

IS 4878: Form for Occupancy Certificate (Appendix K)

The Occupancy Certificate certifies that the cinema building is fit for occupation, meeting all safety and byelaw requirements.

Key Specifications from Appendix K:

  • Building Details: Plot no., location (street/road, colony/bazar).
  • Supervision: Completed under licensed architect/engineer supervision (include license no.).
  • Inspection: Authority inspects and certifies conformity to:
    • Structural safety
    • Fire safety
    • Hygienic and sanitary conditions (inside & surroundings)
  • Declaration: Building is fit for occupation as per byelaws.

Format Summary:

I hereby certify that the erection/material alteration in/of cinema building situated on/in plot No. ___, street/road ___, colony/bazar ___, completed under supervision of licensed architect/engineer License No. ___, has been inspected by me and conforms to all byelaws regarding structural safety, fire safety, hygiene, and sanitation, and is fit for occupation.

Signature of Authority

Related Forms:

  • Appendix J: Completion Certificate (confirms construction per sanctioned plans).
  • Appendix F: Qualifications of licensed architects/engineers.

This certificate is issued by the Licensing/Local Authority after satisfactory inspection.


flowchart TD
    A[Construction Completed] --> B[Supervision by Licensed Architect/Engineer]
    B --> C[Completion Certificate (Appendix J)]
    C --> D[Inspection by Licensing Authority]
    D --> E[Occupancy Certificate Issued (Appendix K)]
    E --> F[Building Fit for Occupation]

Popular Questions About IS 4878

?What are the fire protection requirements for projection rooms under IS 4878?

Under IS 4878, fire protection requirements for projection rooms are as follows:

  • Enclosure: Projection apparatus must be inside a fire-resisting fixed enclosure called the "Projection Room" (Clause 15.14.8).

  • Access:

    • No direct access or communication with the auditorium.
    • The room is self-contained, housing only the cinematograph apparatus, fire appliances, and necessary control equipment (15.14.8.1).
  • Entrances/Exits:

    • One entrance and one alternative exit directly to open air.
    • Doors must be self-closing, made of fire-resisting material, open outwards, and prevent smoke escape into the auditorium (15.14.8.2).
  • Openings/Shutters:

    • Front openings fitted with non-combustible shutters that:
      • Can be closed from near the projectors and outside the projection/rewinding room.
      • May be closed simultaneously if required.
      • Fit closely when closed to prevent fire/smoke spread (15.14.8.5).
    • Shutters and closing mechanisms must be tested daily before public admission.

This ensures containment of fire and smoke, protecting occupants and the auditorium.

?How does the standard regulate exit widths and travel distances for safe evacuation?

IS 4878 regulates exit widths and travel distances for safe evacuation as follows:

  • Unit Exit Width: 50 cm (Clause 10.3.2.1). Widths less than 25 cm are not counted; 25 cm counts as half a unit.
  • Occupant Capacity per Unit Width (Clause 10.3.2.2):
    • Stairways: 40 persons/50 cm
    • Ramps: 50 persons/50 cm
    • Doors/Corridors: 60 persons/50 cm
  • Exit Corridors (Clause 10.6.1): Must be at least as wide as the total required width of exit doorways leading to the exterior, ensuring smooth flow.

Summary Table:

Exit TypeCapacity (persons/50 cm width)
Stairways40
Ramps50
Doors/Corridors60

This ensures that exit widths are proportional to occupant load for timely evacuation, and corridors accommodate combined exit widths without bottlenecks.

?What materials and construction methods are recommended for internal staircases?

IS 4878 - Internal Staircases (Clause 10.7)

  • Materials:

    • Use non-combustible materials throughout for interior stairs (10.7.1).
    • This ensures fire safety and durability.
  • Construction Method:

    • Staircase must be a self-contained unit, fully enclosed.
    • One side must be an external wall (10.7.2).
    • This enclosure helps prevent fire/smoke spread.
  • Lift Shaft Proximity:

    • Stairs cannot be arranged around a lift shaft unless the shaft is fully enclosed with materials having a fire-resistance rating equal to the building type (10.7.3).
    • This prevents fire transmission between stair and lift areas.

Summary Table

AspectRequirement
MaterialNon-combustible
EnclosureFully enclosed, one side external
Lift Shaft RelationNo stairs around lift unless shaft fully fire-rated

This ensures safe evacuation routes and fire containment in buildings.

?What are the ventilation and air-conditioning requirements for large cinema halls?

For large cinema halls, IS 4878 and NBC 1983 specify the following ventilation and air-conditioning requirements:

Ventilation (Non-Air-Conditioned Auditoriums)

  • Use natural ventilation combined with power-driven exhaust fans.
  • Fans must be adequately sized and suitably located to ensure effective air movement (Clause 13.1.4).
  • Recommended air changes: 6 to 9 air changes per hour for non-smoking cinemas (Clause 13.1.3).

Air-Conditioned Auditoriums

  • Minimum fresh air supply depends on occupancy and smoking status (Clause 13.2.6):
ConditionFresh Air Supply (m³/min per person)
Non-smoking0.21
Some smoking0.42
  • Minimum fresh air supply to the entire hall must consider number of occupants and cubic volume.

Summary

  • Ensure adequate fresh air to maintain comfort and air quality.
  • Design ventilation systems to meet these air change rates and fresh air supply norms.
Loading diagram...

This ensures occupant comfort and compliance with IS 4878 and NBC ventilation guidelines.

?How are semi-permanent cinema buildings addressed differently in this standard?

IS 4878: Treatment of Semi-Permanent Cinema Buildings

  • Definition (Clause 2.48):
    Semi-permanent cinema buildings use non-inflammable materials with side walls about 1.0 m high plastered, topped with durable black canvas or tarpaulin curtains for light and rain protection.

  • Applicability (Clause 19.2):
    Most provisions for permanent buildings (Clauses 3,4,5 except 5.2,6,8,9 except 9.2,9.5,9.8,10 except 10.8,10.9,11,12,13 except 13.6,14,15,17) apply mutatis mutandis (with necessary modifications) to semi-permanent buildings.

  • Relaxations:
    Administrative requirements (e.g., building plan details in Clause 3) may be relaxed by authorities provided safety is not compromised.


Summary

AspectPermanent Cinema BuildingSemi-Permanent Cinema Building
Construction MaterialPermanent materialsNon-inflammable + plastered walls + canvas/tarpaulin
Side Wall HeightAs per design~1.0 m plastered walls
Code Clauses ApplicableAll relevant clausesMost clauses except specified exceptions
Administrative RequirementsStrictMay be relaxed by authority
Loading diagram...

This approach ensures safety while accommodating the flexible nature of semi-permanent structures.