IS 4551989AI Search Enabled✦ AI Generated

Portland Slag Cement – Specification

IS 455:1989 specifies the requirements for Portland Slag Cement (PSC), a hydraulic cement produced by blending Portland cement clinker, gypsum, and granulated slag. This standard details the chemical, physical, and performance criteria PSC must meet, including strength, setting time, and composition limits. It is essential for manufacturers, quality controllers, and engineers involved in construction projects requiring durable cement with improved resistance to sulfate attack and reduced heat of hydration.

15Sections
83Clauses Indexed
AI Search Ready
1989Edition
Cement Concrete Aggregates and RCCCategory
Alternative search terms: IS 455 PDF, IS 455 pdf free download, IS 455 free download pdf, IS455 PDF, IS-455 PDF, IS 455 1989 PDF, IS 455:1989 PDF, IS 455-1989 PDF, IS 455 (1989) PDF, IS 455 1989 edition PDF, IS 455 edition 1989 PDF

What This Standard Covers

IS 455:1989 specifies the requirements for Portland Slag Cement (PSC), a hydraulic cement produced by blending Portland cement clinker, gypsum, and granulated slag. This standard details the chemical, physical, and performance criteria PSC must meet, including strength, setting time, and composition limits. It is essential for manufacturers, quality controllers, and engineers involved in construction projects requiring durable cement with improved resistance to sulfate attack and reduced heat of hydration.

Who Uses This Standard

  • Civil Engineers
  • Construction Material Manufacturers
  • Quality Control Engineers
  • Structural Engineers
  • Concrete Technologists
  • Procurement Specialists
  • Laboratory Technicians

Key Topics Covered

Manufacturing process of Portland slag cement
Chemical composition limits including MgO, SO3, and chloride content
Physical properties such as compressive strength and setting time
Sampling and testing procedures
Packaging and mass tolerance requirements
Use of granulated slag conforming to IS 12089
Resistance to sulfate and acidic environments
Storage and identification of cement
Certification and compliance requirements
Standard consistency and water content determination
False set and soundness testing
Marking and labeling for export
Quality assurance and manufacturer’s responsibilities

Table of Contents

1Scope

IS 455: Scope and Related Specifications

  • Scope (Clause 2.1):
    IS 455 covers specifications for Ordinary Portland Cement (OPC) 33 grade, including its physical and chemical properties, testing methods, and packaging.

  • Key Adjunct Indian Standards (Annex A):
    These standards complement IS 455 for cement quality, sampling, testing, and packaging:

IS No.Title
269 : 1989Specification for 33 grade Ordinary Portland Cement
650 : 1966Standard sand for testing cement
3535 : 1986Sampling methods for hydraulic cements
4032 : 1985Chemical analysis of hydraulic cement
4845 : 1968Definitions and terminology for hydraulic cement
11652 : 1986HDPE sacks for packing cement
11653 : 1986Polypropylene sacks for packing cement
11761 : 1986Multi-wall paper sacks for cement
  • Definitions:
    Use IS 4845:1968 for cement-related terminology.

Summary Table: Cement Grade & Packaging

ParameterSpecification
Cement GradeOrdinary Portland Cement (33 grade)
SamplingIS 3535:1986
Chemical AnalysisIS 4032:1985
PackagingHDPE, PP, jute, or paper sacks as per IS 11652, 11653, 11761

This scope ensures uniformity in cement quality, testing, and packaging, critical for structural safety and durability.

2Referenced Indian Standards

IS 455 - Referenced Indian Standards (Clause 2.1)

IS 455 refers to various Indian Standards essential for cement specification, testing, packing, and terminology. Key referenced IS codes include:

IS No.Title
269:1989Ordinary Portland Cement (33 Grade) Specification
650:1966Standard Sand for Cement Testing
2580:1982Jute Sacking Bags for Cement Packing
3535:1986Methods of Sampling Hydraulic Cement
4032:1985Chemical Analysis of Hydraulic Cement
4845:1968Definitions & Terminology for Hydraulic Cement
4905:1968Methods for Random Sampling of Hydraulic Cement
11652:1986HDPE Woven Sacks for Cement Packing
11653:1986Polypropylene Woven Sacks for Cement Packing
11761:1986Multi-wall Paper Sacks for Cement

Additional Notes:

  • IS 12089, 12154, 12174 (1987) cover granulated slag for Portland cement manufacture.
  • IS 4031 (Parts 1-13) detail physical testing methods for hydraulic cement.

These standards ensure uniformity in cement quality, sampling, packaging, and testing procedures, forming a comprehensive framework for cement manufacturing and usage under IS 455.

3Definitions

IS 455: Definitions - Key Points

  • Clause 3.1 refers to IS 4845:1968 for definitions and terminology related to hydraulic cement.
  • IS 4845 provides standardized terms such as:
    • Hydraulic Cement: Cement that sets and hardens by chemical reaction with water.
    • Ordinary Portland Cement (OPC): Cement conforming to IS 269.
    • Grade: Strength classification, e.g., 33, 43, 53 grade OPC.
  • IS 455 relies on these definitions for consistency in specifications and testing.

Important Related Standards (Clause 2.1):

IS No.Title
269:1989Specification for 33 grade OPC
4845:1968Definitions and terminology relating to hydraulic cement
4032:1985Method of chemical analysis of hydraulic cement

Summary:

  • Use IS 4845:1968 for all cement-related definitions.
  • IS 455 specifies grades and properties based on these definitions.
  • Refer to IS 269 for cement grade specifications.
graph LR
A[IS 455] --> B[Definitions per IS 4845]
B --> C[Hydraulic Cement]
B --> D[Ordinary Portland Cement]
B --> E[Grades of Cement (33, 43, 53)]
A --> F[Specifications per IS 269]

This ensures uniform terminology and clarity in cement standards.

4Manufacture

IS 455: Manufacture of Ordinary Portland Cement (OPC) – Key Points

1. Manufacture Specifications

  • Cement manufacture must comply with IS 269:1989 for 33 grade OPC.
  • Packing materials (HDPE, PP, jute, multi-wall paper sacks) follow IS 11652, 11653, 2580, 11761 respectively.
  • Sampling and testing methods per IS 3535, 4032, 4905 ensure quality control.

2. Packing and Sampling (Clause 9.2 & 9.2.2.3)

  • Packing material is agreed upon between manufacturer and purchaser.
  • Average net mass per bag: ≥ 50 kg.
  • Sample size depends on batch size:
Batch Size (bags)Sample Size (bags)
100 – 15020
151 – 28032
281 – 50050
501 – 1,20080
1,201 – 3,200125
> 3,200200
  • Bags are randomly selected as per IS 4905:1968.

3. Quality Control

  • Chemical and physical tests per IS 4032 and IS 4031 (Parts 1-13).
  • Tolerances and definitions as per IS 4845.

Summary Diagram: Manufacture & Packing Process

flowchart TD
    A[Raw Materials] --> B[Manufacturing Plant]
    B --> C[Quality Testing (IS 4031, 4032)]
    C --> D[Packing (HDPE/PP/Jute/ Paper bags)]
    D --> E[Sampling (IS 4905) based on Batch Size]
    E --> F[Dispatch to Purchaser]

Note: For detailed chemical composition, physical properties, and testing procedures, refer to IS 269 and IS 4031 series.

5Chemical Requirements

IS 455 - Chemical Requirements for Portland Slag Cement (Clause 5.2)

ComponentMaximum Percent (%)
Magnesium oxide (MgO)8.0
Sulphur trioxide (SO3)3.0
Sulphide sulphur (S)1.5
Loss on ignition5.0
Insoluble residue4.0

Additional Specifications:

  • Total chloride content:
    • ≤ 0.05% by mass for prestressed and long-span reinforced concrete.
    • For other concrete types, limits are subject to mutual agreement.
  • Manufacturing:
    • Cement made by intergrinding Portland cement clinker, granulated slag (25%-65%), gypsum (natural or chemical).
    • Only gypsum, water, and ≤1% air-entraining agents allowed as additives.
  • Testing Standards:
    • Chemical tests as per IS 4032:1985.
    • Chloride content test as per IS 12423:1988.
    • Granulated slag as per IS 12089:1987.

This ensures durability and performance in concrete structures by controlling harmful chemical constituents.

6Physical Requirements

IS 455 - Physical Requirements Summary

1. Testing Temperature (Clause 11.2)

  • Physical tests should be conducted at 27 ± 2°C.
  • Actual temperature during testing must be recorded.

2. Chemical Limits for Portland Slag Cement (Clause 5.2, Table 5)

ComponentMax % by Mass
Magnesium oxide (MgO)8.0
Sulphur trioxide (SO3)3.0
Sulphide sulphur (S)1.5
Loss on ignition5.0
Insoluble residue4.0
  • Chloride content: Max 0.05% for prestressed/long span RC structures (IS 12423:1988).

3. Packaging Tolerances (Annex B, Clause 9.2)

  • Average net mass per bag ≥ 50 kg.
  • Sample sizes based on batch size (e.g., 100–150 bags → 20 sample bags).
Batch Size (bags)Sample Size (bags)
100 to 15020
151 to 28032
281 to 50050
501 to 1,20080
1,201 to 3,200125
3,201 and over200

This ensures cement quality and consistency for structural safety.

7Storage and Identification

IS 455: Storage and Identification of Cement — Key Points

  • Storage (Clause 7.1):

    • Cement must be stored in a weather-tight building to prevent moisture ingress.
    • Storage should allow easy access for inspection and identification.
    • Avoid direct contact with the ground; use pallets or platforms.
    • Maintain proper ventilation to minimize deterioration.
  • Sample Storage (Clause 10.1.2):

    • If testing cannot be done within 1 week, samples must be stored in airtight containers to preserve quality.
  • Sampling & Identification (Clause 10.3):

    • Manufacturer/supplier must provide facilities, labor, and materials for sampling, packing, and identification of cement batches.

Summary Table: Cement Storage Requirements

AspectSpecification
Storage EnvironmentWeather-tight, dry, ventilated
Storage DurationUse within 3 months recommended
Sample StorageAirtight containers if >1 week delay
Sampling FacilitiesProvided by manufacturer/supplier

flowchart TD
    A[Receive Cement] --> B[Store in Weather-tight Building]
    B --> C[Easy Access for Inspection]
    B --> D[Protect from Dampness]
    C --> E[Sampling by Manufacturer]
    E --> F[Pack Samples in Airtight Containers if Delay > 1 Week]
    F --> G[Testing]

Note: Proper storage and identification ensure cement quality and compliance with IS 455.

8Manufacturer's Certification

IS 455 Manufacturer's Certification: Key Points

  • Clause 8.1:
    The manufacturer must ensure the cement meets IS 455 requirements and, if requested, provide a certificate of conformity to the purchaser within 10 days of dispatch.

  • Clause 8.2:
    The manufacturer must also provide a certificate indicating the total chloride content (% by mass) within 10 days of dispatch.


Important Specifications:

ParameterRequirement
Certification timelineWithin 10 days of cement dispatch
Content to certifyCompliance to IS 455 & chloride %
Chloride content limitAs per IS 455 limits (typically ≤ 0.1% by mass)

Summary Diagram:

flowchart TD
    A[Cement Manufacturing] --> B[Quality Checks]
    B --> C{Meets IS 455?}
    C -->|Yes| D[Prepare Certification]
    D --> E[Send Certificate to Purchaser<br>within 10 days]
    C -->|No| F[Reject/Rectify Cement]

Note: Certification ensures traceability and quality assurance as per IS 455 standards.

9Packing and Marking

IS 455 - Packing and Marking of Cement: Key Points

  • Packing Material:
    As per Clause 9.2.2.3, the packing material must be mutually agreed upon by the manufacturer and purchaser. No fixed material is prescribed in the code.

  • Packing for Export:
    According to Clause 9.2.2, when cement is for export, packing can be in:

    • Bags or
    • Drums
      The average net mass per bag/drum is also to be agreed upon between the purchaser and manufacturer.
  • Typical Packing Mass:
    While IS 455 does not specify exact weights, common practice includes:

    • 50 kg bags (standard)
    • Drums vary, often 25 kg to 50 kg depending on export requirements.
  • Marking:
    Marking details (manufacturer, grade, weight, batch no.) should be clearly visible on each bag or drum as per purchaser's requirements.

Summary Table (Typical Practice)

Packing TypeAverage Net MassMaterial (Agreed)
Bag50 kgJute/Polypropylene (agreed)
Drum25-50 kgMetal/Plastic (agreed)
flowchart LR
    A[Manufacturer] -->|Agrees on packing material & mass| B[Purchaser]
    B --> C{Packing Type}
    C --> D[Bags (e.g., 50 kg)]
    C --> E[Drums (e.g., 25-50 kg)]
    D --> F[Marking as per agreement]
    E --> F

Note: Always confirm packing and marking details contractually to avoid disputes.

10Sampling

IS 455 Sampling Key Points

  • Sampling Method:
    Sampling must follow IS 3535:1986 procedures (Clause 10.2).

  • Who Can Sample:
    Samples can be taken by the purchaser, their representative, or the superintendent’s representative (Clause 10.1).

  • Sample Size for Cement Bags:
    Sampling size depends on batch size (Annex B, Clause 9.2):

Batch Size (bags)Sample Size (bags)
100 to 15020
151 to 28032
281 to 50050
501 to 1,20080
1,201 to 3,200125
3,201 and over200
  • Mass Requirement:
    Average net mass per bag in the sample should be ≥ 50 kg.

  • Random Selection:
    Bags must be selected randomly as per IS 4905:1968.

  • Manufacturer’s Role:
    Must provide facilities, labor, materials for sampling, packing, and identification (Clause 10.3).


flowchart TD
    A[Batch of Cement Bags] --> B[Random Selection per IS 4905]
    B --> C[Sample Size per Batch Size Table]
    C --> D[Sampling & Packing per IS 3535]
    D --> E[Testing & Identification]

This ensures representative sampling for reliable quality control.

11Testing

IS 455: Key Testing Specifications & Formulas

1. Testing Temperature (Clause 11.2)

  • Physical tests on cement should be performed at 27 ± 2°C.
  • Actual temperature during testing must be recorded.

2. Independent Testing (Clause 11.4)

  • Testing should be conducted independently to ensure unbiased results.

3. Sampling & Tolerance for Cement Bags (Annex B, Clause 9.2)

Batch Size (bags)Sample Size (bags)
100 to 15020
151 to 28032
281 to 50050
501 to 1,20080
1,201 to 3,200125
3,201 and over200
  • Samples must be randomly selected (refer IS 4905:1968).

4. Referenced Standards for Testing

  • IS 269: Ordinary Portland Cement specification
  • IS 650: Standard sand for testing cement
  • IS 4031 (Parts 1-13): Methods of physical tests for hydraulic cement
  • IS 4032: Chemical analysis of hydraulic cement
  • IS 4905: Random sampling methods

Summary Diagram: Testing Process Flow

flowchart TD
    A[Sample Collection] --> B[Temperature Control (27 ± 2°C)]
    B --> C[Physical & Chemical Tests]
    C --> D[Independent Testing]
    D --> E[Result Recording & Reporting]

Note: For detailed test methods and formulas (e.g., fineness, consistency, setting time), refer to IS 4031 series.

12Rejection Criteria

IS 455: Rejection Criteria for Cement

Key Points:

  • Clause 12.1: Cement is rejected if it fails any specified requirement in the standard (strength, fineness, soundness, etc.).

  • Sampling (Clause 10.2 & 11.4):

    • Sampling must follow IS 3535:1986.
    • Independent testing is recommended to verify compliance.
  • Mass Tolerance for Cement Bags (Annex B, Clause 9.2):

Batch Size (bags)Sample Size (bags)
100 to 15020
151 to 28032
281 to 50050
501 to 1,20080
1,201 to 3,200125
3,201 and over200
  • Average net mass of sampled bags must be ≥ 50 kg.

Summary:

  • Cement failing any test (strength, setting time, fineness, soundness) is rejected.
  • Use random sampling per IS 4905:1968.
  • Check mass tolerance with sample sizes above.
  • Follow IS 3535:1986 for sampling procedures.
flowchart TD
    A[Cement Batch] --> B[Sampling per IS 3535]
    B --> C{Tests per IS 455}
    C -->|Pass| D[Accept Cement]
    C -->|Fail| E[Reject Cement]
    B --> F[Mass Tolerance Check (Annex B)]
    F -->|Pass| C
    F -->|Fail| E

This ensures quality control and compliance with IS 455 standards.

Annex AList of Referenced Standards

IS 455: List of Referenced Standards (Clause 2.1)

IS 455 references several Indian Standards essential for cement and concrete specifications:

IS No.Title
269 : 1989Specification for 33 grade Ordinary Portland Cement
650 : 1966Specification for Standard Sand for Testing Cement
2580 : 1982Specification for Jute Sacking Bags for Packing Cement
3535 : 1986Methods of Sampling Hydraulic Cements
4032 : 1985Method of Chemical Analysis of Hydraulic Cement
4845 : 1968Definitions and Terminology Relating to Hydraulic Cement
4905 : 1968Methods for Random Sampling of Hydraulic Cement
11652 : 1986Specification for HDPE Woven Sacks for Packing Cement
11653 : 1986Specification for Polypropylene Woven Sacks for Packing Cement
11761 : 1986Specification for Multi-wall Paper Sacks for Cement
12089, 12154, 12174 : 1987Specification for Granulated Slag for Portland Cement Manufacture

Key Notes:

  • These standards cover cement grading, sampling, testing, packing, and terminology.
  • Definitions in IS 4845:1968 apply to IS 455.
  • Sampling and testing methods ensure quality control.
  • Packaging standards ensure proper handling and storage.

This list is crucial for compliance and quality assurance in cement and concrete production.

Annex BTolerance Requirements for Mass of Cement Packed in Bags

Tolerance Requirements for Mass of Cement Packed in Bags (IS 455:1989)

  • Average Net Mass: For 50 kg bags, the average net mass in a sample must be ≥ 50 kg.
  • Sample Size Based on Batch Size:
Batch Size (bags)Sample Size (bags)
100 to 15020
151 to 28032
281 to 50050
501 to 1,20080
1,201 to 3,200125
> 3,200200
  • Tolerance Limits: As per clause 9.2.1.1 (not fully provided here), tolerances apply to individual bag masses around the nominal weight.
  • Smaller Bags: For 25 kg bags, average net mass must be ≥ 25 kg with similar tolerances.
  • Sampling: Bags must be randomly selected per IS 4905:1968.

Summary:

  • The average net mass of cement bags in a sample must not be less than the nominal weight (25 or 50 kg).
  • The sample size depends on the batch size.
  • Individual bag weights must lie within specified tolerances (refer IS 455 clause 9.2.1.1).

This ensures quality control and uniformity in cement packaging.

Annex CComposition of Technical Committee

Composition of Technical Committee (Annex C, IS 455)

The Technical Committee for IS 455 (Portland Slag Cement) formulation includes experts from diverse organizations:

RoleRepresentative Organization
ChairmanDr. H. C. Visvesvaraya, National Council for Cement and Building Materials, New Delhi
MembersLarsen and Toubro Ltd, National Test House, Bhakra Beas Management Board, CPWD, Irrigation Dept. Punjab, CSIR Labs (SERC, CBRI, CRRI), Cement Industries (India Cements, Dalmia, ACC), Ministry of Railways, Ministry of Transport, Geological Survey of India, Army Headquarters, BIS, and others
  • Includes chief engineers, directors, research officers, and industry experts.
  • Alternates are nominated for most members.
  • Represents government, research institutions, cement manufacturers, and infrastructure bodies.

This diverse composition ensures comprehensive technical inputs for cement standards.


For detailed names and affiliations, see Annex C of IS 455.

Popular Questions About IS 455

?What are the chemical composition limits specified for Portland slag cement under IS 455?

Chemical Composition Limits for Portland Slag Cement (IS 455:1989, Clause 5.2)

ComponentMaximum Percent (%)
Magnesium oxide (MgO)10.0
Sulphur trioxide (SO₃)3.0
Sulphide sulphur (S)1.5
Loss on ignition5.0
Insoluble residue4.0

Additional Notes:

  • Chloride content:

    • Max 0.05% for prestressed concrete and long-span reinforced concrete.
    • Max 0.1% for other structures (subject to purchaser agreement).
    • Test as per IS 12423:1988.
  • Granulated slag: Must conform to IS 12089:1987.

  • Slag content: Between 25% and 65% by mass in the cement.

This ensures durability and performance as per IS standards.

?How is the compressive strength of Portland slag cement tested according to this standard?

According to IS 455, the compressive strength of Portland slag cement is tested following these key points:

  • Test Method: Compressive strength tests are conducted on mortar cubes as per IS 4031 (Part 6).
  • Strength Requirements: Cement must show a progressive increase in strength beyond 72 hours (Clause 6.6).
  • Typical Strength Values: IS 455 refers to strength requirements similar to ordinary Portland cement, generally tested at 3, 7, and 28 days.
  • Sample Preparation: Mortar cubes (usually 70.6 mm size) are prepared with standard sand and water-cement ratio.
  • Testing Procedure: Cubes are cured under standard conditions and tested in compression using a calibrated compression testing machine.

Summary Table (Typical Compressive Strength for PSC):

Age (Days)Minimum Compressive Strength (MPa)
3~16-18
7~22-25
28~33-40

Note: Exact values depend on cement grade and manufacturer specifications.

Loading diagram...

This ensures Portland slag cement meets durability and strength standards per IS 455.

?What are the permissible proportions of granulated slag in Portland slag cement?

According to IS 455, Clause 4.1, the permissible proportion of granulated slag in Portland slag cement is:

  • Minimum: 25%
  • Maximum: 65%

This means the granulated slag content must be between 25% and 65% by weight of the total cementitious material.

Additional key points:

  • The cement must be manufactured by either:
    • Intimate intergrinding of Portland cement clinker, granulated slag, and gypsum, or
    • Uniform blending of Portland cement and finely ground granulated slag.
  • Only gypsum (natural or chemical), water, and up to 1% air-entraining agents are allowed as additives.
  • Sulfur trioxide (SO3) content must not exceed 3.0% (Clause 5.2).

Summary table:

ParameterRequirement
Granulated slag content25% to 65%
Sulfur trioxide (SO3)≤ 3.0%
MgO≤ 8.0%
Sulphide sulphur (S)≤ 1.5%
Loss on ignition≤ 5.0%
Insoluble residue≤ 4.0%

This ensures the cement meets both chemical and physical standards for durability and performance.

?What packaging and mass tolerance requirements must be met for cement bags?

Packaging and Mass Tolerance Requirements for Cement Bags as per IS 455

  • Net Mass per Bag: Typically 50 kg, but can also be 25 kg if agreed upon.
  • Tolerance Limits (Clause 9.2.1.1):
    • Maximum 5% of bags in a sample can have a minus error greater than 2% of the specified net mass.
    • No bag should have a minus error exceeding 4% of the specified net mass.
    • The average net mass of cement in the sample must be equal to or more than the specified quantity (50 kg or 25 kg).
  • Packaging: Bags must be suitable as agreed between purchaser and manufacturer.
  • Reference: These tolerances align with the Standards of Weights and Measures (Packaged Commodities) Rules, 1977.

Summary Table

ParameterValue
Specified Net Mass50 kg (or 25 kg agreed)
Max bags with > 2% minus error≤ 5% of sample
Max minus error per bag4% of specified net mass
Average net mass in sample≥ specified net mass

This ensures quality control and fair trade in cement packaging.

?How does IS 455 address the resistance of Portland slag cement to sulfate and acidic environments?

IS 455 (1989) addresses the resistance of Portland Slag Cement (PSC) to sulfate and acidic environments primarily through its chemical and physical requirements:

  • Chemical limits (Clause 5.2) ensure low levels of:
    • Magnesium oxide (MgO) ≤ 8.0%
    • Sulphur trioxide (SO3) ≤ 3.0%
    • Sulphide sulphur (S) ≤ 1.5%
    • Loss on ignition ≤ 5.0%
    • Insoluble residue ≤ 4.0%

These limits reduce the risk of deleterious reactions (e.g., sulfate attack) by limiting reactive compounds.

  • Physical stability (Clause 6.2.1) is controlled by expansion tests:
    • Le-Chatelier expansion ≤ 10 mm
    • Autoclave expansion ≤ 0.8%

Low expansion indicates good resistance to chemical attack and durability in aggressive environments.

Summary: IS 455 ensures PSC's sulfate and acid resistance by controlling chemical composition and limiting expansion, making it suitable for harsh environments.

Loading diagram...

Need Detailed Clause Answers?

Ask AI about any clause, requirement, or provision in IS 455. Get instant, clause-cited responses powered by our indexed library.

Free tier includes 150 queries (50 AI + 100 Reference) · No credit card required