Code of practice for laying damp-proofing treatment using bitumen felts

IS 1609:1991 provides a comprehensive code of practice for laying damp-proofing treatments using bitumen felts in building construction. It covers the materials, preparation, and methods required to apply bitumen felt layers effectively to prevent moisture penetration in foundations, walls, basements, and floors. This standard is essential for engineers, contractors, and designers involved in waterproofing and damp-proofing works to ensure durable and reliable moisture barriers in structures.

9Sections
31Clauses Indexed
AI Search Ready
1991Edition
Waterproofing and Damp-ProofingCategory
Alternative search terms: IS 1609 PDF, IS 1609 pdf free download, IS 1609 free download pdf, IS1609 PDF, IS-1609 PDF, IS 1609 1991 PDF, IS 1609:1991 PDF, IS 1609-1991 PDF, IS 1609 (1991) PDF, IS 1609 1991 edition PDF, IS 1609 edition 1991 PDF

What This Standard Covers

IS 1609:1991 provides a comprehensive code of practice for laying damp-proofing treatments using bitumen felts in building construction. It covers the materials, preparation, and methods required to apply bitumen felt layers effectively to prevent moisture penetration in foundations, walls, basements, and floors. This standard is essential for engineers, contractors, and designers involved in waterproofing and damp-proofing works to ensure durable and reliable moisture barriers in structures.

Who Uses This Standard

  • Civil Engineers
  • Structural Engineers
  • Construction Contractors
  • Waterproofing Specialists
  • Architects
  • Building Inspectors
  • Quality Control Engineers

Key Topics Covered

Types and grades of bitumen felts
Surface preparation for damp-proofing
Bitumen primer and bonding materials
Layering methods for damp-proofing felts
Damp-proofing treatment for basements and below ground structures
Damp-proofing treatment for above ground walls and floors
Overlap and joint sealing techniques
Material specifications and standards referenced
Site preparation and water control during application
Thickness and application rates of bitumen layers
Heavy and extra heavy damp-proofing treatments
Compatibility with related IS codes

Table of Contents

1Scope

IS 1609: Scope Summary & Key Specifications

Scope (Clause 2.1)

  • Covers execution of damp-proofing using bitumen felts for foundations, walls, and basements.
  • Focuses on application procedures, not material specifications (covered under IS 1322, IS 7193).
  • Complements other standards listed in Annex A (e.g., IS 3067 for design, IS 1346 for roofing).

Key Specifications for Felt Laying (Clause 7.3)

StepDescription
b)Surface prep → cement rendering & corner fillets set → primer coat applied → felt rolled up
c)Start laying on floor → complete before wall treatment
d)Pour hot bonding material on floor → unroll felt with pressure to squeeze excess bitumen
e)After floor, lay felt on walls similarly, unrolling upward with hot bitumen
f)Minimum overlap at joints: 100 mm
g)Subsequent felt layers must break joints midway between joints of underlying layer

Relevant IS Codes in Annex A (Clause 2.1)

IS No.Title
1322:1982Bitumen felts for waterproofing and damp-proofing
1346:1991Waterproofing of roofs with bitumen felts
3067:1988Design details for damp-proofing & waterproofing
7193:1974Glass fibre base coal tar pitch and bitumen felts

Summary Diagram: Felt Laying Process

flowchart TD
    A[Surface Preparation] --> B[Cement Rendering & Corner Fillets Set]
    B --> C[Primer Coat Applied]
    C --> D[Felt Rolled Up]
    D --> E[Start Laying on Floor]
    E --> F[Pour Hot Bonding Material]
    F --> G[Unroll Felt with Pressure]
    G --> H[Cover Entire Floor]
    H --> I[Overlap Joints ≥ 100mm]
    I --> J[Laying Felt on Walls]
    J --> K[Unroll Felt Upward with Hot Bitumen]
    K --> L[Break Joints in Subsequent Layers]

Note: This code prioritizes

2Referenced Standards

IS 1609: Referenced Standards Summary

Clause 2.1 & Annex A specify that IS 1609 relies on several key Indian Standards (IS) as adjuncts for materials and practices related to bitumen felt damp-proofing:

IS No.Title
269:1989Ordinary Portland Cement
702:1988Industrial Bitumen
1322:1982Bitumen Felts for Waterproofing and Damp-proofing
1346:1991Waterproofing of Roofs with Bitumen Felts
2116:1980Sand for Masonry Mortars
3067:1988General Design Details and Preparatory Work for Damp-proofing
3384:1986Bitumen Primer for Waterproofing and Damp-proofing
4911:1986Glossary of Terms related to Bituminous Waterproofing
7193:1974Glass Fibre Base Coal Tar Pitch and Bitumen Felts

Key Notes on Application (Clause 7.3)

  • Felt is laid on a prepared surface with primer and cement rendering.
  • Hot bitumen is poured in front of the unrolled felt to bond it.
  • Overlapping joints must be minimum 100 mm.
  • Subsequent felt layers' joints should break midway between joints of the layer beneath.

Practical Tips

  • Follow IS 1346:1991 for roofing details.
  • Use IS 1322:1982 and IS 7193:1974 for selecting bitumen felt materials.
  • Primer application per IS 3384:1986 is critical for bonding.
  • IS 3067:1988 guides design and preparatory work.

flowchart TD
    A[Surface Preparation] --> B[Primer Application]
    B --> C[Roll Felt Placement]
    C --> D[Pour Hot Bitumen]
    D --> E[Unroll Felt with Pressure]
    E --> F[Seal Overlaps ≥ 100mm]
    F --> G[Apply Subsequent Layers with Staggered Joints]

This framework ensures compliance with IS 1609 and related standards for durable damp-proofing using bitumen felts.

3Definitions

IS 1609: Definitions & Key Specifications for Bitumen Felt Damp-Proofing

  • Bitumen Felt: A waterproofing material made of bitumen impregnated felt, used for damp-proofing foundations, walls, and basements (Ref: IS 1322:1982, IS 7193:1974).

  • Primer: A bitumen primer applied on prepared surfaces to enhance adhesion (Ref: IS 3384:1986).

  • Laying Method (Clause 7.3):

    • Surface must be prepared, cement rendering and fillets set, and primer applied.
    • Felt is rolled out on the floor with hot bitumen bonding poured ahead.
    • Overlaps must be minimum 100 mm.
    • Subsequent felt layers should have joints staggered (break joint).
  • Related Standards (Annex A):

    IS No.Title
    1322:1982Bitumen felts for waterproofing and damp-proofing
    3384:1986Bitumen primer for waterproofing and damp-proofing
    3067:1988Design details for damp-proofing and waterproofing
    1346:1991Waterproofing of roofs with bitumen felts

Summary Table: Overlapping Joints

ParameterValue
Minimum overlap width100 mm
Joint staggeringRequired in subsequent layers

This ensures continuity and effectiveness of damp-proofing layers.

flowchart LR
    A[Surface Preparation] --> B[Cement Rendering & Fillets Set]
    B --> C[Apply Bitumen Primer]
    C --> D[Roll out Felt on Floor]
    D --> E[Pour Hot Bitumen Bonding]
    E --> F[Unroll Felt with Pressure]
    F --> G[Seal Overlapping Joints (≥100mm)]
    G --> H[Lay Felt on Wall Verticals]
    H --> I[Stagger Joints in Next Layers]

This concise framework from IS 1609 guides proper execution of bitumen felt damp-proofing.

4Necessary Information

IS 1609: Necessary Information Summary

1. Reference Standards (Annex A, Clause 2.1)

IS 1609 refers to several essential IS codes for materials and procedures:

IS No.Title
269:1989Ordinary Portland Cement
702:1988Industrial Bitumen
1322:1982Bitumen Felts for Waterproofing
1346:1991Waterproofing of Roofs with Bitumen Felts
3384:1986Bitumen Primer for Waterproofing
3067:1988Design details for Damp-Proofing & Waterproofing
2116:1980Sand for Masonry Mortars
4911:1986Glossary for Bituminous Waterproofing
7193:1974Glass Fibre Base Coal Tar Pitch Felts

2. Laying of Felt (Clause 7.3 Key Points)

  • Felt laid after surface preparation, cement rendering, corner fillets set, and primer applied.
  • Start laying on floor, complete before wall treatment.
  • Hot bitumen poured ahead of felt roll, unrolled with pressure to squeeze excess bitumen.
  • Overlaps minimum 100 mm at sides and ends.
  • Subsequent layers stagger joints to break alignment.

3. Designer's Responsibility (Clause 4)

  • Designer must ensure all necessary info as per IS 3067:1988 is available before specifying damp-proofing.

Quick Checklist for Designers:

  • Confirm material specs from referenced IS codes.
  • Ensure surface preparation and primer application.
  • Follow felt laying sequence with hot bitumen bonding.
  • Maintain minimum 100 mm overlaps.
  • Stagger joints in multi-layer systems.
  • Refer IS 3067 for design details and preparatory work.

flowchart TD
    A[Surface Preparation] --> B[Cement Rendering & Corner Fillets Set]
    B --> C[Primer Coat Applied]
    C --> D[Felt Roll Prepared & Rolled Up]
    D --> E[Start Laying on Floor]
    E --> F[Pour Hot Bitumen Ahead]
    F --> G[Unroll Felt with Pressure]
    G --> H[Seal Overlaps ≥ 100 mm]
    H --> I[Lay Felt on Walls Similarly]
    I --> J[Subsequent
5Materials

IS 1609: Key Materials Specifications for Damp-Proofing

1. Bitumen Bonding Material (Clause 5.4)

  • Use blown bitumen conforming to IS 702:1988.
  • Recommended grades: 85/25 or 90/15 (penetration grades indicating hardness).

2. Bitumen Felt (Clause 6.1)

  • Types and grades as per:
    • IS 1322:1982 (Bitumen felts for waterproofing and damp-proofing)
    • IS 7193:1974 (Glass fibre base coal tar pitch and bitumen felts)

3. Laying of Bitumen Felt (Clause 7.3)

  • Surface preparation: clean, cement rendered, primer applied.
  • Felt rolled up, laid on floor first.
  • Hot bitumen poured ahead of felt roll; felt unrolled with pressure to squeeze excess bitumen.
  • Overlaps: minimum 100 mm on sides and ends.
  • Subsequent layers staggered to break joints.

4. Referenced Indian Standards (Annex A)

IS No.Title
702 : 1988Industrial bitumen
1322 : 1982Bitumen felts for waterproofing
7193 : 1974Glass fibre base bitumen felts
3067 : 1988Design details for damp-proofing
1346 : 1991Waterproofing roofs with bitumen felts

Summary Table: Bitumen Grades

GradePenetration (0.1 mm)Use
85/2585 (at 25°C)General bonding
90/1590 (at 15°C)Slightly softer, better adhesion

flowchart LR
  A[Surface Preparation] --> B[Apply Primer]
  B --> C[Roll up Bitumen Felt]
  C --> D[Pour Hot Bitumen on Floor]
  D --> E[Unroll Felt with Pressure]
  E --> F[Overlap Joints ≥ 100mm]
  F --> G[Lay Felt on Walls similarly]

This ensures proper bonding and waterproofing per IS 1609 guidelines.

6Damp-Proofing Treatment

IS 1609: Damp-Proofing Treatment Key Points


1. Materials (Clause 5.1)

  • Surface preparation: Cement-sand mortar (1:4)
  • Cement: IS 269:1989
  • Sand: IS 2116:1980, free from deleterious matter

2. Damp-Proofing Above Ground Level (Clause 6.2)

  • Bituminous primer: 0.2 to 0.4 l/m², brushed and dried before treatment
  • Ensure continuous, overlap joints properly made (Clause 7.1)

3. Damp-Proofing Below Ground Level - Basements (Clause 6.3)

Normal Treatment (Two Layers of Felt):

StepDescriptionQuantity/Type
1Primer (vertical faces only)0.27 l/m²
2Hot applied blown bitumen1.5 kg/m²
3Hessian base self-finished felt Type 3, Grade 2 or glass fibre base felt Type 2, Grade IIFelt layer 1
4Hot applied blown bitumen1.5 kg/m²
5Hessian base self-finished felt Type 3, Grade 2 or glass fibre base felt Type 2, Grade IIFelt layer 2
  • Note: Fibre-based self-finished felt is not recommended for basements.

Summary Diagram

flowchart TD
    A[Surface Preparation: Cement-Sand Mortar (1:4)] --> B[Bituminous Primer (0.2-0.4 l/m²)]
    B --> C[Damp-Proofing Treatment Above Ground]
    B --> D[Basement Treatment]
    D --> E[Primer (0.27 l/m²)]
    E --> F[Hot Bitumen (1.5 kg/m²)]
    F --> G[Felt Layer 1 (Hessian/Glass Fibre)]
    G --> H[Hot Bitumen (1.5 kg/m²)]
    H --> I[Felt Layer 2 (Hessian/Glass Fibre)]

This ensures an effective continuous barrier against water penetration as per IS 160

7Method of Laying Damp-Proofing Treatment

IS 1609: Method of Laying Damp-Proofing Treatment


Key Specifications & Rates

Treatment TypeLayers of FeltPrimer (Vertical Faces)Hot Blown Bitumen (kg/m²)Felt Type (Hessian or Glass Fibre)
Normal20.27 l/m²1.5 per layerHessian Type 3, Grade 2 or Glass Fibre Type 2, Grade II
Heavy30.27 l/m²1.5 per layer (4 layers)Same as Normal
Extra Heavy40.27 l/m²1.5 per layer (5 layers)Same as Normal

Method Summary

  • Surface Preparation: Cement-sand mortar (1:4) as per IS 269 & IS 2116.
  • Primer: Applied on vertical faces only, 0.27 l/m², allowed to dry.
  • Bitumen Application: Hot applied blown bitumen at 1.5 kg/m² per layer.
  • Felt Layers: Alternate layers of felt and bitumen, starting and ending with bitumen.
  • Basement Note: Fibre-based felt not recommended below ground.

Layer Sequence Example (Heavy Treatment)

graph TD
    A[Primer (Vertical Faces) - 0.27 l/m²] --> B[Bitumen - 1.5 kg/m²]
    B --> C[Felt Layer 1]
    C --> D[Bitumen - 1.5 kg/m²]
    D --> E[Felt Layer 2]
    E --> F[Bitumen - 1.5 kg/m²]
    F --> G[Felt Layer 3]
    G --> H[Bitumen - 1.5 kg/m²]

Note: Always ensure proper drying time for primer and uniform heating of bitumen for effective bonding.

8Site Preparation

IS 1609 - Site Preparation for Damp-Proofing Treatment

Key Points from Clause 7.2 (Site Preparation)

  • Keep site free of water by continuous pumping until work and structural protection for damp-proofing are complete.
  • Dry surface is crucial for good adhesion of bitumen; use suitable drying methods.
  • If surface remains damp, the first hot bitumen coat may not stick, but adhesion is ensured by the first felt layer.
  • Walls should be kept dry to ensure bitumen and felt adhere properly.

Bitumen Specifications (Clause 5.4)

  • Use blown bitumen as per IS 702:1988.
  • Recommended grades: 85/25 or 90/15.

Damp-Proofing Treatment (Clause 6)

Treatment TypeLayers of FeltBitumen Application Rate (kg/m²)Primer Rate (l/m²)Felt Type
Light11.5-Hessian base Type 3 Grade 2 or Glass fibre Type 2 Grade II
Heavy31.5 per layer0.27 (vertical only)Same as above
Extra Heavy41.5 per layer0.27 (vertical only)Same as above
  • Primer is applied only on vertical faces.
  • Bitumen is applied hot at 1.5 kg/m² per layer.
  • Felt layers alternate with bitumen layers.

Method Summary for Damp-Proofing (Clause 6.2)

  • Apply bituminous primer (0.2 to 0.4 l/m²) and allow to dry before bitumen layers.
  • Ensure overlapping joints are well stuck for watertightness.

flowchart TD
    A[Site Preparation] --> B[Keep site dry by pumping]
    B --> C{Surface condition}
    C -->|Dry| D[Apply bitumen primer & layers]
    C -->|Damp| E[First bitumen may not stick]
    E --> F[Ensure felt adheres to bitumen]
    D --> G[Apply felt layers alternated with bitumen
Annex AList of Referred Indian Standards

IS 1609: List of Referred Indian Standards for Damp-Proofing Using Bitumen Felts

IS No.TitleIS No.Title
269:198933 Grade Ordinary Portland Cement (4th revision)3067:1988Code of Practice for Design & Preparatory Work for Damp-proofing & Waterproofing (1st rev)
702:1988Industrial Bitumen (2nd revision)3384:1986Bitumen Primer for Waterproofing & Damp-proofing (1st revision)
1322:1982Bitumen Felts for Waterproofing and Damp-proofing (3rd revision)4911:1986Glossary of Terms Related to Bituminous Waterproofing and Damp-proofing (1st revision)
1346:1991Code of Practice for Waterproofing Roofs with Bitumen Felts (3rd revision)7193:1974Glass Fibre Base Coal Tar Pitch and Bitumen Felts
2116:1980Sand for Masonry Mortars (1st revision)

Key Notes:

  • IS 1322 & IS 7193 specify types and grades of bitumen felts.
  • IS 1346 guides waterproofing of roofs using bitumen felts.
  • IS 3067 covers general design details and preparatory work for damp-proofing and waterproofing.
  • These standards ensure harmonization with international practices and address material specifications, surface preparation, application, and quality control.

Summary Diagram of Reference Flow

graph LR
A[IS 1609 - Execution of Bitumen Felt] --> B(IS 1322 & IS 7193 - Material Specs)
A --> C(IS 3067 - Design & Prep)
A --> D(IS 1346 - Roof Waterproofing)
A --> E(IS 269 - Cement)
A --> F(IS 702 - Bitumen)
A --> G(IS 2116 - Sand for Mortars)
A --> H(IS 3384 - Bitumen Primer)
A --> I(IS 4911 - Glossary)
A --> J(IS 7193 - Glass Fibre Felts)

Popular Questions About IS 1609

?What types and grades of bitumen felts are recommended for damp-proofing?

Recommended Types and Grades of Bitumen Felts for Damp-Proofing (IS 1609):

  • Types:

    • Hessian base self-finished felt Type 3, Grade 2
    • Glass fibre base felt Type 2, Grade II
  • Application Rates:

    • Hot applied blown bitumen at 1.5 kg/m² between layers
  • Layering Based on Building Life:

    • 1 layer of felt for building life up to 10 years
    • 2 layers of felt for building life over 10 years

Treatments:

Treatment TypeLayers of FeltNotes
Normal2 layersPrimer (vertical faces only) + bitumen + felt + bitumen + felt
Heavy3 layersPrimer + alternating layers of bitumen and felt (3 felts, 4 bitumen applications)
Extra Heavy4 layersPrimer + alternating layers of bitumen and felt (4 felts, 5 bitumen applications)

Important Notes:

  • For basements, fibre-based self-finished felts are not recommended.
  • All felts must be laid with overlapping joints and bonded with hot bitumen.
  • Refer to IS 3067:1988 for additional design information.

Loading diagram...

This ensures durable damp-proofing tailored to building life and exposure conditions.

?How should the site be prepared before applying bitumen felt damp-proofing?

Site Preparation Before Applying Bitumen Felt Damp-Proofing (IS 1609 - Clause 7.2):

  • Keep the site dry: Continuous pumping is essential to remove water until damp-proofing and structural protection are complete.
  • Dry the surface: Use suitable drying methods to ensure good adhesion between the structural surface and bitumen.
  • If surface remains damp: The first hot bitumen coat may not stick well, but if the felt adheres to the bitumen and overlaps are well stuck, the treatment is effective.
  • Walls should be dry: To ensure the first bitumen course adheres properly, walls must be kept dry.

Additional Tips:

  • Apply a bituminous primer on vertical surfaces at 0.27 l/m² before bitumen application.
  • Use hot applied blown bitumen at 1.5 kg/m² between felt layers.
  • Choose felt layers based on building life:
    • 1 layer for ≤10 years
    • 2 layers for >10 years
Loading diagram...

This ensures durable adhesion and effective damp-proofing per IS 1609.

?What are the recommended layering methods for different levels of damp-proofing treatment?

Recommended Layering Methods for Damp-Proofing (IS 1609 - Clause 6.3)

For basements and below-ground structures, use multiple layers of bitumen felt as per one of these methods:

a) Normal Treatment (Two Layers of Felt)

  1. Primer (vertical faces only):
    • Rate: 0.27 l/m²
  2. Hot applied blown bitumen:
    • Rate: 1.5 kg/m²
  3. First layer of felt:
    • Hessian base self-finished felt Type 3, Grade 2 OR glass fibre base felt Type 2, Grade II
  4. Second layer of hot applied blown bitumen:
    • Rate: 1.5 kg/m²
  5. Second layer of felt:
    • Same as first layer

Key Points:

  • Overlap joints must be continuous and properly bonded to ensure a complete waterproof barrier (Clause 7.1).
  • Fibre-based self-finished felt is not recommended for basements.
  • Primer application is only for vertical surfaces.
  • For above-ground damp-proofing, primer rates differ (0.2 to 0.4 l/m²).

Loading diagram...

This layering ensures a robust barrier against water ingress in underground structures.

?Which materials and primers conform to IS 1609 for effective adhesion?

According to IS 1609, the materials and primers for effective adhesion in damp-proofing are:

  • Bitumen Primer: Must conform to IS 3384:1986.
  • Bitumen Bonding Material: Use blown bitumen conforming to IS 702:1988, preferably grades 85/25 or 90/15.
  • Surface Preparation Mortar: Cement-sand mortar (1:4) with cement per IS 269:1989 and sand per IS 2116:1980 (free from deleterious matter).

Summary Table:

MaterialIS Code ReferenceSpecification Details
Bitumen PrimerIS 3384:1986Primer for waterproofing/damp-proofing
Bitumen Bonding MaterialIS 702:1988Blown bitumen, grades 85/25 or 90/15
Cement for MortarIS 269:1989Ordinary Portland Cement
Sand for MortarIS 2116:1980Masonry sand, clean and free of impurities

Use these materials in the sequence of surface preparation, primer application, and bonding to ensure proper adhesion of bituminous felts.

Loading diagram...

This ensures effective adhesion and durability of damp-proofing treatment per IS 1609.

?How are overlap joints in bitumen felts to be sealed to ensure continuity?

Sealing Overlap Joints in Bitumen Felts (IS 1609)

To ensure continuity and an effective barrier against water penetration, overlap joints in bitumen felts must be:

  • Correctly made with sufficient overlap (typically 75–100 mm) to prevent water ingress.
  • Bonded with hot applied blown bitumen at the rate of 1.5 kg/m² between layers and at overlaps.
  • For multiple layers (2, 3, or 4 layers), each felt layer is bonded with hot bitumen, ensuring the overlaps are sealed continuously.
  • Use Hessian base self-finished felt Type 3, Grade 2 or Glass fibre base felt Type 2, Grade II as specified.
  • For vertical surfaces, apply a primer (0.27 l/m²) before bitumen application.

This layered bonding with hot bitumen at overlaps ensures a continuous, water-tight damp-proofing membrane.

Loading diagram...

Summary: Overlap joints are sealed by hot bitumen bonding between felt layers, ensuring a continuous damp-proof barrier per IS 1609 Clause 7.1 and 3.1.

Need Detailed Clause Answers?

Ask AI about any clause, requirement, or provision in IS 1609. Get instant, clause-cited responses powered by our indexed library.

Free tier includes 150 queries (50 AI + 100 Reference) · No credit card required