IS 15193:2002 provides a comprehensive code of practice for laying pitch-mastic flooring specifically designed for industries handling heavy hydrocarbon products such as kerosene, diesel, and furnace oil. It outlines the preparation of the base, handling and application of molten pitch-mastic, layering techniques, and maintenance requirements to ensure durable, impervious, and jointless flooring suitable for heavy industrial use. This standard is essential for engineers and contractors involved in flooring solutions within hydrocarbon processing and storage facilities.
Overview
IS 15193:2002 provides a comprehensive code of practice for laying pitch-mastic flooring specifically designed for industries handling heavy hydrocarbon products such as kerosene, diesel, and furnace oil. It outlines the preparation of the base, handling and application of molten pitch-mastic, layering techniques, and maintenance requirements to ensure durable, impervious, and jointless flooring suitable for heavy industrial use. This standard is essential for engineers and contractors involved in flooring solutions within hydrocarbon processing and storage facilities.
Audience
Contents
Structure
IS 15193: Scope Summary
Scope Definition: IS 15193 primarily deals with energy efficiency in buildings (lighting systems), specifying methods to calculate and verify energy saving.
Rounding Off:
As per IS 2:1960, all calculated or observed values must be rounded to the same number of significant digits as the specified values in the standard.
Referenced Standards:
| Aspect | Description |
|---|---|
| Applicability | Energy performance of lighting in buildings |
| Objective | To promote energy-efficient lighting design |
| Compliance | Based on measured or calculated energy savings |
| Rounding Rule | Follow IS 2:1960 for numerical rounding |
If you need formulas or tables related to energy savings or lighting power density, please specify!
IS 15193 References - Key Points
| Value to Round | Rounded Result |
|---|---|
| 2.345 (3 sig. digits) | 2.35 |
| 0.00456 (3 sig. digits) | 0.00456 |
| 123.456 (2 sig. digits) | 1.2 × 10² |
If you need formulas or tables on mastic flooring properties or application, please specify.
IS 15193 - Design Considerations Summary
The code's Clause 3 (Design Consideration) emphasizes:
| Aspect | Specification |
|---|---|
| Rounding off values | Follow IS 2:1960 rules |
| Significant figures | Maintain same significant figures as specified values |
| Referenced standards | Check latest editions for referenced IS codes (ICS 91.040.20, 91.100.50) |
This ensures uniformity and accuracy in design calculations and test results.
Material Handling & Specifications:
Opening to Traffic (Clause 7.3.2.4):
Maintenance:
| Aspect | Specification |
|---|---|
| Cooling before traffic | Must reach ambient temperature |
| Repair method | Rectangular cut to full depth; blow lamp removal preferred |
| Cleaning | Lukewarm water + detergent; immediate grease removal |
For detailed material properties and mix design, consult IS 13026:1991.
IS 15193 primarily deals with Energy Efficiency of Electrical Equipment and does not provide direct formulas or tables specifically titled "Equipment" within the given context.
Rounding off values:
Follow IS 2:1960 for rounding test or analysis results.
Referenced Standards:
| Parameter | Typical Specification |
|---|---|
| Rated Voltage | As per equipment design |
| Efficiency (%) | Minimum values specified |
| Load Factor | Used in energy calculations |
| Power Factor | For electrical equipment sizing |
If you need formulas or tables for energy efficiency calculations or equipment sizing, please specify!
IS 15193: Preparation of the Base for Pitch-Mastic Surfacing
| Step | Specification |
|---|---|
| Surface dryness | Completely dry before laying |
| Surface roughening | Stiff broom/wire/coir brush |
| Surface evenness | No ridges or hollows |
| Stability | Must sustain load without movement |
| Drainage slope | As required, typically 1-2% |
flowchart TD
A[Stable Base] --> B[Dry Surface]
B --> C[Roughened Surface]
C --> D[Even Surface (No Ridges/Hollows)]
D --> E[Provide Drainage Slope]
E --> F[Ready for Pitch-Mastic Laying]
This ensures a durable, well-bonded pitch-mastic surface as per IS 15193.
IS 15193: Laying of Pitch-Mastic Flooring - Key Points
| Tool | Purpose |
|---|---|
| Formwork | Define bay and thickness |
| Gauges | Thickness verification |
| Straight Edge | Leveling surface |
| Band Level | Uniform slope control |
flowchart LR
A[Prepare Substrate] --> B[Set Formwork & Gauges]
B --> C[Heat & Mix Pitch-Mastic]
C --> D[Spread Pitch-Mastic in Bays]
D --> E[Level & Compact using Tools]
E --> F[Cure & Inspect Thickness]
Summary: Use proper formwork and tools to maintain uniform thickness; ensure jointless, impervious floor suitable for heavy hydrocarbon exposure per IS 13026.
IS 15193: Base Stability Requirements for Pitch-Mastic Flooring
| Parameter | Recommended Value/Formula |
|---|---|
| Base compressive strength | ≥ 5 MPa (typical for concrete base) |
| Surface slope | 0.5% to 1% (1:100 to 1:200) |
| Surface roughness | Roughened by broom/wire brush for bonding |
| Load bearing capacity | As per design load + safety factor (1.5) |
flowchart TD
A[Stable Base] --> B[Even & Dry Surface]
B --> C[Roughened Surface]
C --> D[Proper Drainage Slope]
D --> E[Supports Anticipated Load]
E --> F[Good Bond with Pitch-Mastic]
References:
IS 15193 - Base Surface Preparation for Pitch-Mastic Flooring
Base Stability (7.1):
The base must be stable and capable of bearing the anticipated loads without deformation.
Surface Condition (7.2):
Protection (7.3.2.3):
| Parameter | Requirement |
|---|---|
| Surface Evenness | No ridges or hollows |
| Surface Dryness | Completely dry |
| Surface Roughness | Achieved by brushing (wire/coir) |
| Slope for Drainage | Provided as per site drainage needs |
| Load Bearing Capacity | Must sustain anticipated loads |
flowchart TD
A[Base Stability] --> B[Even & Dry Surface]
B --> C[Roughened Surface]
C --> D[Slope for Drainage]
D --> E[Protection from Heavy Loads & Oils]
Ensure the base is prepared strictly as above to achieve durable, oil-resistant pitch-mastic flooring per IS 15193.
IS 15193: Application Procedures for Pitch-Mastic Flooring
Opening to Traffic (Clause 7.3.2.4):
Maintenance:
Rounding Off (General Clause):
General Procedure:
| Condition | Requirement |
|---|---|
| Cooling | Must reach ambient temperature |
| Damaged Area Treatment | Cut rectangular, full depth, replace with new mastic |
| Removal Technique | Prefer blow lamp method |
flowchart TD
A[Apply Pitch-Mastic Flooring] --> B[Allow Cooling to Ambient Temp]
B --> C{Damaged Area?}
C -- Yes --> D[Cut Rectangular Full Depth]
D --> E[Remove Damaged Portion (Blow Lamp)]
E --> F[Replace with New Mastic]
C -- No --> G[Open to Traffic]
F --> G
This concise overview aligns with IS 15193 application procedures for safe and durable pitch-mastic flooring installation.
IS 15193 - Transport of Molten Material: Key Points
| Parameter | Specification |
|---|---|
| Container Type | Flat mortar pans |
| Surface Coating | Limestone dust |
| Prohibited Coating | Grease or oil |
| Delivery State | Molten |
| Equipment | Pitch boiler, mechanically agitated cooker |
| Location of Equipment | Near site to avoid cooling |
flowchart LR
A[Pitch Boiler] --> B[Molten Pitch-Mastic]
B --> C[Flat Mortar Pan with Limestone Dust]
C --> D[Transport to Site]
D --> E[Immediate Laying]
This ensures efficient transport and quality laying of molten pitch-mastic flooring.
IS 15193 - Spreading and Layering of Pitch-Mastic
Base Preparation (Clause 7.2):
Transport of Molten Material (Clause 7.3.1):
Spreading (Clause 7.3.2):
Layering (Clause 7.3.2.2):
| Aspect | Specification |
|---|---|
| Thickness Control | Use gauges or straight edges |
| Surface Roughness | Roughen base for bonding |
| Joint Arrangement | Stagger joints in layers |
| Slope for Drainage | Provide slope as required |
flowchart TD
A[Base Preparation] --> B[Surface Roughened & Dry]
B --> C[Pitch-Mastic Transport]
C --> D[Molten Mastic in Limestone-dusted Pans]
D --> E[Spreading in Bays]
E --> F[Maintain Thickness with Tools]
F --> G{Single or Multi-layer?}
G -->|Single| H[Complete Layer]
G -->|Multi| I[Stagger Joints in Layers]
I --> H
This ensures durable, well-bonded pitch-mastic layers per IS 15193.
Key Specifications:
Clause 7.3.2.1:
Clause 7.3.2.4 (Opening to Traffic):
| Step | Action | Condition |
|---|---|---|
| Bubble detection | Identify bubbles during laying | While mastic is hot/plastic |
| Bubble removal | Puncture bubbles | Immediately on detection |
| Surface rectification | Fill depressions caused by puncturing | While mastic remains hot |
| Cooling | Allow mastic to cool before traffic | Ambient temperature reached |
| Repair | Cut and replace damaged mastic | Rectangular cut, full depth |
flowchart TD
A[Lay Mastic] --> B{Bubble Detected?}
B -- Yes --> C[Puncture Bubble]
C --> D[Rectify Depression]
D --> E[Allow Cooling]
B -- No --> E
E --> F{Ambient Temperature Reached?}
F -- Yes --> G[Open to Traffic]
F -- No --> E
This ensures durability and smooth finish in mastic flooring by preventing trapped air defects.
IS 15193 - Surface Protection Key Points
| Aspect | Specification |
|---|---|
| Damage Prevention | Avoid heavy load movement, oil spills |
| Mixing | No use of pitch-mastic surface in concrete/mortar |
| Opening to Traffic | Only after cooling to ambient temperature |
| Repair Method | Rectangular cut, replace full depth, use blow lamp |
| Cleaning | Lukewarm water + detergent; immediate oil spill removal |
flowchart TD
A[Laid Surface] --> B{Protection}
B --> C[Prevent heavy load damage]
B --> D[Prevent oil/fat/grease spillage]
A --> E{Opening to Traffic}
E --> F[Wait for cooling to ambient temperature]
A --> G{Maintenance}
G --> H[Periodic cleaning with lukewarm water + detergent]
G --> I[Immediate removal of oils, fats, grease]
A --> J{Repair}
J --> K[Cut damaged area rectangularly]
J --> L[Replace with new mastic]
J --> M[Use blow lamp technique preferred]
For detailed technical design or formulation, refer to IS 15193 and related codes like IS 13026 (Pitch-mastic flooring specifications).
IS 15193: Opening to Traffic & Curing for Pitch-Mastic Flooring
| Aspect | Specification |
|---|---|
| Opening to Traffic | After cooling to ambient temperature |
| Damaged Area Repair | Rectangular cut full depth, replace |
| Cleaning | Lukewarm water + detergent |
| Spill Management | Immediate removal of oils/fats/grease |
| Surface Protection | Avoid heavy loads, oil, cement mixing |
flowchart TD
A[Molten Mastic Laid] --> B[Cool to Ambient Temp]
B --> C{Surface Undamaged?}
C -- Yes --> D[Open to Traffic]
C -- No --> E[Cut Rectangular Damaged Area]
E --> F[Remove Damaged Portion (Blow Lamp)]
F --> G[Replace with New Mastic]
G --> B
Note: Proper curing is implicit by ensuring cooling before traffic and avoiding contamination.
Frequently Asked
As per IS 15193, the pitch-mastic used for flooring in hydrocarbon industries must:
Loading diagram...
For detailed physical and chemical properties, refer directly to IS 13026.
Base Surface Preparation for Pitch-Mastic Flooring (IS 15193)
This preparation ensures a durable, jointless, and moisture-impervious flooring system suitable for hydrocarbon service conditions (refer IS 13026 for design considerations).
Equipment for Handling and Applying Molten Pitch-Mastic (IS 15193):
Key Points:
Loading diagram...
This ensures proper handling, transport, and application per IS 15193.
Recommended Thickness and Layering for Pitch-Mastic Flooring (IS 15193):
| Parameter | Specification |
|---|---|
| Total Thickness | 20 - 25 mm (or as agreed) |
| Layering | Single or multiple layers |
| Base Requirement | Stable and load-sustaining |
| Tools for Thickness | Formwork, gauges, levels |
Loading diagram...
This ensures durable, moisture-proof flooring suitable for hydrocarbon environments.
According to IS 15193, Clause 7.3.2.4:
Maintenance tips:
| Condition | Action |
|---|---|
| Mastic cooled to ambient temp | Flooring can be opened to traffic |
| Damaged area | Cut and replace full depth |
| Spills | Clean immediately |
This ensures durability and safety of pitch-mastic flooring.
Ask AI about any clause, requirement, or provision in IS 15193. Get instant, clause-cited responses powered by our indexed library.
Free tier includes 150 queries (50 AI + 100 Reference) · No credit card required