IS 13826 Part 5 (1994) specifies the method for testing the heat resistance of bitumen-based felts used in waterproofing and damp-proofing applications. This standard outlines the procedure to evaluate the felt's ability to withstand high temperatures without melting, ensuring durability and performance in construction projects. It is essential for manufacturers, quality control engineers, and construction professionals involved with bitumen felts to assess thermal stability according to this Indian Standard.
Overview
IS 13826 Part 5 (1994) specifies the method for testing the heat resistance of bitumen-based felts used in waterproofing and damp-proofing applications. This standard outlines the procedure to evaluate the felt's ability to withstand high temperatures without melting, ensuring durability and performance in construction projects. It is essential for manufacturers, quality control engineers, and construction professionals involved with bitumen felts to assess thermal stability according to this Indian Standard.
Audience
Contents
Structure
Scope:
Key Specifications:
Reference:
| Step | Description |
|---|---|
| Sample conditioning | Place sample in heated chamber for specified time |
| Examination | Visual check for melting or deformation |
| Reporting | Date, sample details, and observations recorded |
flowchart TD
A[Start Test] --> B[Place sample in heated chamber]
B --> C[Maintain temperature for specified duration]
C --> D[Remove sample]
D --> E[Visual examination for melting]
E --> F{Melting observed?}
F -->|Yes| G[Fail heat resistance]
F -->|No| H[Pass heat resistance]
G --> I[Report with observations]
H --> I
For detailed test conditions (temperature, duration), refer to IS 13826 Part 5 full text.
IS 13826 Part 5 (1994) — Heat Resistance Test for Bitumen Felt
| Parameter | Details to Report |
|---|---|
| Date of Testing | Actual test date |
| Sample Details | Type, source, batch, etc. |
| Observation | Visual signs of melting (Yes/No) |
flowchart TD
A[Start: Sample Preparation] --> B[Heat in Chamber for Specified Duration]
B --> C[Remove Sample]
C --> D{Visual Inspection}
D -->|Melting Observed| E[Fail: Report Melting]
D -->|No Melting| F[Pass: Report No Melting]
E --> G[Record Date, Sample Details, Observation]
F --> G
G --> H[End]
This test ensures bitumen felts maintain integrity under heat, critical for waterproofing durability.
Definitions:
Refer to IS 4911:1986 for comprehensive definitions related to bituminous waterproofing and damp-proofing.
Scope:
Part 5 covers the Heat Resistance Test for bitumen felts, assessing their capacity to withstand heat without melting.
Heat Resistance Test Procedure (Clause 5.3):
Related Parts in IS 13826:
| Part | Test Covered |
|---|---|
| 1 | Breaking Strength Test |
| 2 | Pliability Test |
| 3 | Storage Sticking Test |
| 4 | Pressure Head Test |
| 5 | Heat Resistance Test (this part) |
| 6 | Water Absorption Test |
| 7 | Determination of Binder Content |
Rounding Off:
Use IS 2:1960 rules for rounding numerical results to match the precision of specified values.
flowchart TD
A[Prepare Sample] --> B[Heat in Chamber for Specified Time]
B --> C[Remove Sample]
C --> D[Visual Inspection for Melting]
D --> E{Melting Observed?}
E -->|Yes| F[Report Sample Details & Melting]
E -->|No| G[Report Sample Details & No Melting]
Note: For detailed definitions and terms, always consult IS 4911:1986 alongside IS 13826 Part 5.
Apparatus & Procedure (Clause 5.2 & 5.3):
Reporting Requirements:
| Step | Description |
|---|---|
| 1 | Suspend samples vertically by clips |
| 2 | Place in heated chamber at test temp |
| 3 | Maintain temperature for 3 hours |
| 4 | Remove and visually inspect samples |
| 5 | Record date, sample details, observations |
flowchart TD
A[Prepare Samples] --> B[Suspend Vertically by Clips]
B --> C[Place in Heated Chamber]
C --> D[Maintain Temp for 3 Hours]
D --> E[Remove Samples]
E --> F[Visual Inspection for Melting]
F --> G[Record Observations & Report]
For detailed temperature and sample size, refer to IS 13826 Part 5 full text or related product standards IS 1322 and IS 7193.
IS 13826 Part 5 — Test Specimen Key Details
Specimen Size:
Test Procedure (Clause 5.3):
Rounding Off:
| Parameter | Specification |
|---|---|
| Specimen Size | 100 mm × 100 mm |
| Number of Specimens | At least 5 per sample |
| Test Method | Heat resistance test |
| Observation | Visual check for melting |
flowchart TD
A[Cut 5 specimens of 100x100 mm] --> B[Place in heating chamber]
B --> C[Heat for specified duration]
C --> D[Remove specimens]
D --> E[Visual inspection for melting]
E --> F{Melting observed?}
F -- Yes --> G[Record failure]
F -- No --> H[Record pass]
G --> I[Report results]
H --> I
This ensures consistent evaluation of heat resistance of bitumen felts per IS 13826 Part 5.
IS 13826 Part 5 (1994) — Heat Resistance Test Procedure Summary
Clause 5.3 Procedure:
Reporting Requirements:
| Step | Description |
|---|---|
| Sample Prep | Prepare bitumen felt samples as per IS 13826 |
| Heating | Place samples in chamber at specified temperature and duration |
| Examination | Visual check for melting or distortion |
| Documentation | Record date, sample details, and results |
flowchart TD
A[Prepare Sample] --> B[Place in Heated Chamber]
B --> C[Heat for Specified Duration]
C --> D[Remove Sample]
D --> E[Visual Examination for Melting]
E --> F[Record Date, Sample Details, Observations]
This simple procedure ensures bitumen felts meet heat resistance standards for waterproofing applications.
IS 13826 Part 5 - Observation and Reporting (Clause 5.3)
Reports must include:
| Parameter | Details |
|---|---|
| Date of Testing | DD/MM/YYYY |
| Sample Detail | Type, Batch No., Identification |
| Observation | No melting / Partial melting / Complete melting |
flowchart TD
A[Start Heating Period] --> B[Remove Sample from Heated Chamber]
B --> C[Visual Examination]
C --> D{Melting Observed?}
D -->|No| E[Report: No Melting]
D -->|Yes| F[Report: Melting Observed]
E --> G[End]
F --> G[End]
This simple visual check is critical for verifying the heat resistance of bitumen felts as per IS 13826 Part 5.
For reporting test results in IS 13826 (Part 5) — Heat Resistance Test of Bitumen Felt:
| Condition | Rule |
|---|---|
| Digit to be dropped < 5 | Retain preceding digit unchanged |
| Digit to be dropped = 5 followed by zeros or no digits | Retain preceding digit if even; round up if odd |
| Digit to be dropped > 5 | Round up preceding digit |
If specified value = 12.3 (3 significant digits), result 12.345 → round to 12.3
| Parameter | Details |
|---|---|
| Date of Testing | DD/MM/YYYY |
| Sample Details | Description/ID |
| Observation | Melting signs: Yes/No |
flowchart TD
A[Start Test] --> B[Heat Resistance Test]
B --> C[Remove Sample]
C --> D[Visual Examination]
D --> E{Signs of Melting?}
E -->|Yes| F[Record Observation]
E -->|No| F
F --> G[Round off results as per IS 2:1960]
G --> H[Report Date, Sample Details, Observation]
H --> I[End]
Summary: Use IS 2:1960 for rounding, maintain significant digits as per standard, and report test date, sample, and melting observations clearly.
IS 13826 Part 5: Committee Composition & Key Specifications
| Role | Representative Organization/Capacity |
|---|---|
| Chairman | Prof. M. S. Shetty (Personal) |
| Members | Various industry, research, govt., and BIS reps |
This committee ensures standardization and quality control in waterproofing materials per IS 13826 Part 5.
Frequently Asked
According to IS 13826 Part 5 (1994) for the heat resistance test of bitumen-based felt:
| Parameter | Requirement |
|---|---|
| Temperature | As specified for felt type* |
| Duration | 3 hours |
| Sample Position | Vertically suspended by clips |
* Refer IS 1322 or IS 7193 for exact temperature values depending on felt base material.
Loading diagram...
This test ensures the bitumen felt's suitability for high-temperature applications without melting.
Preparation and Handling of Bitumen Felt Test Specimens (IS 13826 Part 5)
This ensures reliable determination of heat resistance as per IS 13826 Part 5.
| Parameter | Requirement |
|---|---|
| Specimen Size | 100 mm × 100 mm |
| Number of Specimens | Minimum 5 |
| Handling | Avoid damage, contamination |
| Conditioning | As per relevant IS standards |
Loading diagram...
Criteria for Bitumen Felt to Pass the Heat Resistance Test (IS 13826 Part 5):
| Parameter | Requirement |
|---|---|
| Test Temperature | As specified by the standard (e.g., 70-90°C) |
| Duration | Fixed period (e.g., 2 hours) |
| Acceptance Criteria | No melting, flowing, or deformation |
This verifies the felt's suitability for hot climates or roofing applications where heat resistance is critical.
Loading diagram...
For exact temperature/time values, refer to IS 13826 Part 5 test procedure details.
IS 13826 Part 5 defines the Heat Resistance Test for bitumen felts, measuring their ability to withstand high temperatures without melting.
The Heat Resistance Test complements these by ensuring the felt maintains integrity under thermal stress, critical for durability in hot climates or applications involving elevated temperatures.
Loading diagram...
Summary: Heat resistance test ensures thermal stability, complementing mechanical, waterproofing, and compositional tests for comprehensive quality assessment.
According to IS 13826 Part 5 (1994) for the Heat Resistance Test of bitumen felts, the necessary equipment includes:
Heat Chamber with Thermostat Control:
Specimen Holder or Tray:
Temperature Monitoring Device:
| Equipment | Purpose |
|---|---|
| Heat Chamber with Thermostat | Maintains constant test temperature |
| Specimen Holder/Tray | Holds samples during heating |
| Temperature Monitor | Ensures accurate temperature control |
This setup checks the felt's resistance to melting at elevated temperatures as per the standard.
Loading diagram...
Ask AI about any clause, requirement, or provision in IS 13826 Part 5. Get instant, clause-cited responses powered by our indexed library.
Free tier includes 150 queries (50 AI + 100 Reference) · No credit card required