Method of measurement of building and civil engineering works, Part 22: Materials

IS 1200 Part 22 (1982) specifies standardized methods for measuring materials used in building and civil engineering works across India. It provides detailed guidelines on quantifying various construction materials such as aggregates, bricks, metals, and asbestos cement products, ensuring uniformity and accuracy in measurement for project estimation, execution, and payment. This standard is essential for engineers, contractors, and quantity surveyors involved in civil infrastructure projects seeking consistent measurement practices.

8Sections
93Clauses Indexed
AI Search Ready
1982Edition
Methods of Measurement of Works of Civil EngineeringCategory
Alternative search terms: IS 1200 Part 22 PDF, IS 1200 Part 22 pdf free download, IS 1200 Part 22 free download pdf, IS1200Part22 PDF, IS-1200-Part-22 PDF, IS 1200 Part 22 1982 PDF, IS 1200 Part 22:1982 PDF, IS 1200 Part 22-1982 PDF, IS 1200 Part 22 (1982) PDF, IS 1200 Part 22 1982 edition PDF, IS 1200 Part 22 edition 1982 PDF

What This Standard Covers

IS 1200 Part 22 (1982) specifies standardized methods for measuring materials used in building and civil engineering works across India. It provides detailed guidelines on quantifying various construction materials such as aggregates, bricks, metals, and asbestos cement products, ensuring uniformity and accuracy in measurement for project estimation, execution, and payment. This standard is essential for engineers, contractors, and quantity surveyors involved in civil infrastructure projects seeking consistent measurement practices.

Who Uses This Standard

  • Civil Engineers
  • Quantity Surveyors
  • Construction Contractors
  • Project Estimators
  • Site Engineers
  • Procurement Specialists
  • Government Infrastructure Departments

Key Topics Covered

Standardized measurement units for materials
Measurement of aggregates by volume with deductions
Measurement of bricks and stones by volume
Measurement of metal products by weight and length
Enumeration and description of asbestos cement products
Rounding off and reporting measurement results
Inclusion of handling, delivery, and storage in descriptions
Uniform decimal system for dimensions and weights
Bills of quantities and material descriptions
Technical unification of measurement practices
Measurement of miscellaneous building materials
Measurement accuracy and limits

Table of Contents

0.1Introduction and Adoption

IS 1200 Part 22 (1982) – Introduction and Adoption: Key Points

This part covers methods of measurement of materials used in civil engineering works.

Key Specifications from Clause 1.5 and Table 1:

Material TypeMeasurement Unit & Notes
BamboosEnumerated and described; diameter measured at 1.5 m from thick end
Scantlings/Planks/BattensVolume in m³, stating size and type
Tiles (non-sanitary)Area in m², stating size and type
Wall Tiles / False Ceiling / Roofing TilesEnumerated, stating type and size
Water Proofing CompoundWeight in kg
Water Proofing Paste/Emulsion/LiquidVolume in litres
WireWeight in kg and described
Wire RopeLength in running metres and described

Measurement Notes:

  • Diameter for bamboos is measured at 1.5 m from the thick end.
  • For bricks/stone aggregates ≥ 40 mm, volume is measured in m³ after 7.5% deduction from stack measurements.
  • For aggregates < 40 mm, measurement is gross stack volume without deduction.

Summary Diagram: Material Measurement Units

graph LR
A[Materials] --> B[Bamboos]
A --> C[Scantlings/Planks]
A --> D[Tiles]
A --> E[Water Proofing]
A --> F[Wire & Wire Rope]

B --> B1[Enumerated & described]
B --> B2[Diameter @1.5m]

C --> C1[Volume in m³]
C1 --> C2[Size & Type]

D --> D1[Area in m² or Enumerated]
D1 --> D2[Size & Type]

E --> E1[Kg or Litres]

F --> F1[Kg or Running Metres]

This part of IS 1200 standardizes material measurement units and methods to ensure uniformity in estimation and billing.

0.2Importance of Measurement in Civil Engineering

Importance of Measurement in Civil Engineering (IS 1200 Part 22)

Measurement is crucial throughout a civil engineering project—from initial estimates to final payments. Key points:

  • Uniformity: Different agencies and government departments use varied measurement methods, causing inconsistencies.
  • Unification: IS 1200 aims to standardize measurement methods technically to avoid ambiguities and enable smooth contractor operations.
  • Scope: Applies to building and civil engineering works, ensuring clarity in quantities and specifications.

Key Specifications:

  • Measurements must be clear, unambiguous, and consistent.
  • They form the basis for cost estimation, progress tracking, and payment settlement.
  • Standard units and methods as per IS 1200 should be adopted for all items.

Typical Measurement Units & Methods (as per IS 1200):

Item TypeUnit of MeasurementRemarks
EarthworkCubic meters (m³)Measured in situ or compacted
ConcreteCubic meters (m³)Measured after placing
BrickworkCubic meters (m³)Includes mortar volume
Steel ReinforcementKilograms (kg)Weight of bars placed
PlasterSquare meters (m²)Area covered

Formula example for Earthwork volume:

[ V = \frac{A_1 + A_2}{2} \times h ]

  • (A_1, A_2) = areas of two consecutive cross-sections (m²)
  • (h) = distance between sections (m)

flowchart LR
    A[Project Planning] --> B[Measurement of Quantities]
    B --> C[Cost Estimation]
    C --> D[Execution & Monitoring]
    D --> E[Final Measurement]
    E --> F[Payment Settlement]

Summary: IS 1200 Part 22 emphasizes standardized measurement to ensure transparency, uniformity, and efficient project management in civil engineering works.

2.1Description of Item

IS 1200 Part 22: Description of Item & Measurement Specifications

1. Description of Item (Clause 2.1)

  • Each item description shall include:
    • Conveyance and delivery
    • Handling and unloading
    • Storing, etc.
  • Unless otherwise stated, these aspects are integral to the item description.

2. Method of Measurement (Clause 3.1 & 7.5, Table 1)

Material TypeUnit & Remarks
Aggregates ≥ 40 mmm³ after 7.5% deduction from stack measurements
Aggregates < 40 mm (sand, stone dust)Gross m³ stack measurement
Aluminium Flatskg, stating size
Aluminium Strip & EdgingRunning metre, stating size
Asbestos Cement ProductsEnumerated, stating size and type
Bitumen Feltm², stating type, grade, width
Bricks/Brick TilesEnumerated, stating class and size
Blocks (Clay, Cement, Stone, etc.)Enumerated, stating size, type, and grade
Cement, Lime, Pozzolana Mixturekg, stating type
Doors/Windows/Ventilator FramesLinear metres (outside dimensions) or m² (excluding fittings)
Steel (bars, sheets, pipes, etc.)kg or tonnes, stating size and type
Tiles (Wall, Roofing, Floor)m² or enumerated, stating size and type
Paints, Emulsions, ThinnersLitres, stating type and class
Pipes & AccessoriesRunning metres or enumerated and described

3. Key Notes

  • For stacked materials, deductions (e.g., 7.5% for aggregates ≥ 40 mm, 15% for soling stones) are made to account for voids.
  • Sizes, types, grades, and classes must always be specified.
  • Measurements include gross or net quantities depending on material type.

Summary Diagram of Measurement Process

flowchart TD
2.2Limits of Measurement

IS 1200 Part 22: Limits of Measurement

Key Specifications (Clause 2.2)

  • Length/Dimensions: Measured net in decimal system, rounded to nearest 0.01 m.
  • Area: Rounded to nearest 0.01 m².
  • Volume: Rounded to nearest 0.01 m³.
  • Weight: Rounded to nearest 1 kg.

Rounding Off (Refer Clause 0.4)

  • Final measurement values must be rounded as per IS 2-1960 (Rules for rounding off numerical values).

Purpose & Importance (Clause 0.2)

  • Uniform measurement methods reduce ambiguity and facilitate smooth contract execution and payment settlements.
  • Standardization helps contractors work across different departments efficiently.

Summary Table

QuantityUnitRounding Precision
Lengthmeters (m)0.01 m
Areasquare meters (m²)0.01 m²
Volumecubic meters (m³)0.01 m³
Weightkilograms (kg)1 kg

Note on Rounding (IS 2-1960)

  • If the digit to be dropped is less than 5, the preceding digit remains unchanged.
  • If 5 or more, the preceding digit is increased by one.
flowchart LR
    A[Measurement] --> B[Take exact value]
    B --> C{Round off?}
    C -->|Yes| D[Apply IS 2-1960 rules]
    C -->|No| E[Use exact value]
    D --> F[Report final value]
    E --> F

This ensures consistent, precise, and standardized reporting of civil engineering measurements.

2.3Bills of Quantities

IS 1200 Part 22: Bills of Quantities - Key Specifications & Measurement Methods

Clause 2.3:

  • Bills of Quantities must fully describe materials including type, size, grade, and quantity.

Table 1: Method of Measurement of Materials (Summary)

Material CategoryMeasurement Unit & Notes
Aggregates (≥40 mm nominal size)In m³ after 7.5% deduction from stack measurements
Aggregates (<40 mm size)In m³ gross stack measurements
Aluminium FlatsIn kg, state size
Aluminium Strip/EdgingIn running metres, state size
Bricks/StoneEnumerated, state class and size
Bitumen FeltIn m², state type, grade, width
Cement/Lime/Pozzolana MixtureIn kg, state type
Doors/Windows FramesIn linear metres, outside dimensions
Steel (bars, sheets, sections)In kg or tonnes, state size and thickness
Paints/EmulsionsIn litres, state type and class
Tiles/Marble/Stone slabsIn m², state thickness and type
Soling stone, boulders, rubbleIn m³ after 15% deduction from gross stack

Important Notes:

  • Deductions:

    • 7.5% deduction for bricks/stone ≥40 mm from stack volume.
    • 15% deduction for soling stone, boulders, rubble from gross stack.
  • Enumerated items are counted individually and described by size/type.

  • Weight measurements (kg, tonnes) for metals, cement, bitumen, etc.


Practical Use:

  • Always specify size, type, grade, thickness, and length as applicable.
  • Use stack measurements for bulk materials but apply deductions for voids.
  • Enumerate fittings and accessories clearly for precise billing.

flowchart TD
    A[Bills of Quantities] --> B[Material Description]
    B --> C[Measurement Unit]
    C --> D
3Method of Measurement of Materials

IS 1200 Part 22 - Method of Measurement of Materials: Key Points

Measurement Methods (Table 1 Summary)

Material TypeMeasurement Unit & Notes
Aggregates (≥40 mm nominal size)Volume (m³) after 7.5% deduction from stack measurement
Aggregates (<40 mm), sand, fly ash, etc.Gross stack volume (m³) without deduction
Aluminium FlatsWeight (kg), specify size
Aluminium Strip & EdgingRunning metres, specify size
Asbestos Cement ProductsEnumerated, specify size
Bitumen FeltArea (m²), specify type, grade, width
Bricks, Tiles, BlocksEnumerated, specify class, size, type, and grade if any
Cement, Lime, Pozzolana MixtureWeight (kg), specify type
Doors, Windows, Ventilators (Frames)Linear metres (outside dimensions) or area (m²)
Steel (bars, sheets, structural sections)Weight (kg or tonnes), specify size and type
Glass SheetsArea (m²), specify type, thickness, size
Paints, Emulsions, ThinnersVolume (litres), specify type and class
Soling stone, boulders, rubbleVolume (m³) after 15% deduction from gross stack
Sanitary FittingsEnumerated and described

Important Notes:

  • Stack measurement deductions:
    • 7.5% for brick/stone aggregates ≥40 mm
    • 15% for soling stones, boulders, rubble
  • Enumerated means counting individual units and describing size/type.
  • For volumetric measurements, gross stack volume is measured, then deductions applied to account for voids.
  • Weight measurements require specifying size/type for clarity.

Example Formula for Deduction from Stack Volume:

[ \text{Net Volume} = \text{Gross Stack Volume} \times (1 - \text{Deduction %}) ]

  • For brick aggregates
3.1Measurement of Various Types of Materials

IS 1200 Part 22 (1982) — Measurement of Various Types of Materials

Key Measurement Methods (Table 1 Summary):

Material TypeMeasurement Unit & Notes
AggregatesBy volume (m³), with deductions as applicable
Brick/Stone ≥ 40 mmm³ after 7.5% deduction from stack volume
Brick/Stone < 40 mm, Sand, Fly Ash, etc.Gross stack volume in m³
Aluminium FlatsWeight in kg, specify size
Aluminium Strip/EdgingRunning meters, specify size
Asbestos Cement ProductsEnumerated, specify size/type
Bitumen FeltArea in m², specify type, grade, width
Bitumen Hot Sealing CompoundWeight in kg, specify grade/type
Bricks, Tiles, BlocksEnumerated, specify class, size, type, grade
Cement, Lime, Pozzolana MixtureWeight in kg, specify type
Doors, Windows, VentilatorsLinear meters (frames) or m² (excl. fittings), describe dimensions
Steel (bars, sheets, pipes)Weight (kg/tonnes) or area (m²), specify size/thickness
Stone (soling, slabs, kerb)Volume in m³ or area in m², with deductions (e.g., 15% for soling stone)
Paints, Emulsions, ThinnersVolume in litres or weight in kg, specify type/class
Timber (blocks, planks)Enumerated or volume in m³, specify size/type

Important Deduction Notes:

  • Brick/Stone ≥ 40 mm: Deduct 7.5% from stack volume.
  • Soling stone, boulders, rubble: Deduct 15% from gross stack volume.

Example: Measuring Brickwork ≥ 40 mm

[ \text{Net Volume} = \text{Gross Stack Volume} \times (1 - 0.075) ]


Summary Diagram (Material → Measurement Unit)

graph TD
  A[Materials] --> B[Aggregates]
  A -->
Table 1Measurement Methods for Specific Materials

IS 1200 Part 22 - Measurement Methods for Specific Materials

Key Measurement Methods (Table 1 Summary)

Material TypeMeasurement Unit & Notes
AggregatesIn m³ (stack measurement), with deductions as applicable
Brick/Stone ≥ 40mmm³ after 7.5% deduction from stack volume
Brick/Stone < 40mm, Sand, Fly Ash, etc.Gross m³ stack measurement
Aluminium Flatskg, stating size
Aluminium Strip & EdgingRunning meters, stating size
Asbestos Cement ProductsEnumerated, stating size
Bitumen Feltm², stating type, grade, width
Bitumen Hot Sealing Compoundkg, stating grade and type
Bricks/BlocksEnumerated, stating size, type, grade
Cement/Lime/Pozzolanakg, stating type
Doors/Windows FramesLinear meters (outside dimensions)
Steel (Bars, Sheets, Pipes)kg or tonnes, stating size and type
Glass Sheetsm², stating type, thickness, size
Tiles (Floor, Wall, Roofing)Enumerated or m², stating size and type
Timber (Scantlings, Planks)m³, stating size and type
Paints, Emulsions, ThinnersLitres or kg, stating type and class

Important Deductions:

  • Brick/Stone ≥ 40 mm: Deduct 7.5% from stack volume to get net volume.
  • Soling stone, boulders, rubble: Deduct 15% from gross stack volume.

Example Formula for Brick/Stone ≥ 40 mm:

[ \text{Net Volume} = \text{Gross Stack Volume} \times (1 - 0.075) = 0.925 \times \text{Gross Stack Volume} ]


Notes:

  • Enumerated means counting individual units.
  • Descriptions should include size, type, grade, and other relevant details.
  • Measurement units vary by material type for accuracy and standardization.

flowchart LR
    A[Material Type] -->

Popular Questions About IS 1200 Part 22

?How are aggregates measured according to IS 1200 Part 22?

According to IS 1200 Part 22 (1982), aggregates are measured as follows:

  • Brick/stone aggregates of 40 mm nominal size and above:
    Measured in cubic meters (m³) after making a 7.5% deduction from the gross stack measurements to account for voids and air spaces.

  • Brick/stone aggregates less than 40 mm size, including cinder, sand, moorum, fly ash, pozzolana, stone dust:
    Measured in cubic meters (m³) on the basis of gross stack measurements without any deduction, classified by nominal size and type.

Summary Table for Aggregates Measurement

Aggregate TypeMeasurement UnitNotes
≥ 40 mm nominal sizeDeduct 7.5% from stack volume
< 40 mm nominal size and similar typesGross stack measurement

This method standardizes measurement, reducing discrepancies in supply and billing.

Loading diagram...

This ensures uniformity in quantity estimation for civil engineering works.

?What is the prescribed method for measuring bricks and stones?

According to IS 1200 Part 22 (1982), the prescribed method for measuring bricks and stones is as follows:

Measurement of Bricks and Stones

Material TypeMeasurement Method
Bricks/Stones of 40 mm nominal size and aboveMeasured in cubic meters (m³) after making a 7.5% deduction from the gross stack volume.
Brick/stone aggregates less than 40 mm sizeMeasured in cubic meters (m³) of the gross stack volume without deduction.

Key Points:

  • Stack measurement: The volume is taken by stacking the bricks/stones.
  • Deduction for bricks/stones ≥ 40 mm: 7.5% is deducted to account for voids in the stack.
  • No deduction for aggregates < 40 mm: Measured as gross volume.

This ensures uniformity and accuracy in quantity estimation for bricks and stones in construction works.

Loading diagram...

This method aligns with the standard practice for material measurement in civil engineering works.

?How should metal materials like aluminium flats and strips be quantified?

According to IS 1200 Part 22 (Clause 3.1, Table 1), the quantification of metal materials like aluminium flats and strips is as follows:

  • Aluminium Flats: Measured by weight in kilograms (kg), clearly stating the size (thickness, width).
  • Aluminium Strips and Edging: Measured in running metres, stating the size (width and thickness).

Key Points:

  • Always specify the size/dimensions along with the quantity.
  • Aluminium flats are quantified by weight because thickness and width vary, affecting total mass.
  • Aluminium strips are easier to quantify by length due to their linear nature.

Summary Table Extract:

MaterialUnit of MeasurementRemarks
Aluminium FlatskgState size
Aluminium Strip & EdgingRunning metreState size

This ensures clarity and uniformity in billing and inventory management.

Loading diagram...
?Does the standard specify how to include handling and delivery in material measurement?

IS 1200 Part 22 does not explicitly specify how to include handling and delivery in the measurement of materials.

Key points from the standard:

  • The standard focuses on methods of measurement for supply of materials (Clause 0.3, 1.1).
  • Table 1 defines how materials are measured (e.g., aggregates by volume after deductions, bricks enumerated or by volume).
  • No clause or table mentions handling, delivery, or transportation losses as part of measurement.

Practical engineering approach:

  • Handling and delivery losses are usually accounted for separately as wastage or shrinkage.
  • Quantities for billing or planning are based on net measured quantities as per IS 1200 Part 22.
  • Additional provisions for handling/delivery losses should be agreed contractually or included in specifications.

Summary:

AspectIS 1200 Part 22 Guidance
Measurement basisNet quantities (e.g., volume, weight)
Handling & deliveryNot included in measurement; handled separately
Wastage allowanceTo be considered outside this standard

For detailed project control, include handling/delivery losses as a percentage allowance during procurement or specification stage.

?What rounding rules apply when reporting measurement results under this standard?

Rounding Rules per IS 1200 Part 22:

  • Final measurement results must be rounded following IS 2:1960 (Rules for rounding off numerical values).
  • Measurements are reported in decimal system with these precisions (Clause 2.2):
    • Dimensions: nearest 0.01 m
    • Area: nearest 0.01 m²
    • Volume: nearest 0.01 m³
    • Weight: nearest 1 kg
  • If no specific precision is stated, use the above limits.
  • IS 2:1960 rounding rules generally state:
    • If the digit to be dropped is less than 5, round down.
    • If greater than 5, round up.
    • If exactly 5, round to the nearest even digit (to avoid bias).

Summary Table

QuantityPrecisionRounding Standard
Dimension0.01 mIS 2:1960
Area0.01 m²IS 2:1960
Volume0.01 m³IS 2:1960
Weight1 kgIS 2:1960

This ensures uniformity and accuracy in measurement reporting for materials like sand, aggregates, etc.

Need Detailed Clause Answers?

Ask AI about any clause, requirement, or provision in IS 1200 Part 22. Get instant, clause-cited responses powered by our indexed library.

Free tier includes 150 queries (50 AI + 100 Reference) · No credit card required