Code of practice for manufacture and use of lime-pozzolana concrete blocks for paving

IS 10359:1982 is the Indian Standard code of practice for the manufacture and use of lime-pozzolana concrete blocks specifically designed for paving applications. It provides detailed guidelines on materials, mix proportions, manufacturing processes, curing methods, and quality control to ensure durable and standardized paving blocks. This standard is essential for engineers, manufacturers, and construction professionals involved in producing and utilizing lime-pozzolana concrete blocks for footpaths, pavements, and other paved surfaces.

11Sections
48Clauses Indexed
AI Search Ready
1982Edition
Building Limes and Gypsum ProductsCategory
Alternative search terms: IS 10359 PDF, IS 10359 pdf free download, IS 10359 free download pdf, IS10359 PDF, IS-10359 PDF, IS 10359 1982 PDF, IS 10359:1982 PDF, IS 10359-1982 PDF, IS 10359 (1982) PDF, IS 10359 1982 edition PDF, IS 10359 edition 1982 PDF

What This Standard Covers

IS 10359:1982 is the Indian Standard code of practice for the manufacture and use of lime-pozzolana concrete blocks specifically designed for paving applications. It provides detailed guidelines on materials, mix proportions, manufacturing processes, curing methods, and quality control to ensure durable and standardized paving blocks. This standard is essential for engineers, manufacturers, and construction professionals involved in producing and utilizing lime-pozzolana concrete blocks for footpaths, pavements, and other paved surfaces.

Who Uses This Standard

  • Civil Engineers
  • Construction Project Managers
  • Concrete Block Manufacturers
  • Pavement Designers
  • Quality Control Inspectors
  • Urban Infrastructure Planners
  • Material Testing Laboratories

Key Topics Covered

Material specifications for lime, pozzolana, and aggregates
Mix proportions for lime-pozzolana concrete blocks
Manufacturing methods including mixing and compaction
Standard block dimensions and layering
Curing procedures: initial and final curing
Storage and handling of raw materials
Quality control and testing requirements
Use of fly ash and burnt clay pozzolana
Bonding between concrete layers
Water quality and usage in block production
Mechanical and manual compaction techniques
Environmental protection during curing

Table of Contents

1Scope

Scope of IS 10359: Lime Pozzolana Concrete Blocks

  • Applicable Standards: Definitions per

    • IS 3115:1992 (Specification for lime-based blocks)
    • IS 6508:1988 (Specification for building limes)
  • Materials:

    • Lime conforming to IS 269:1989 or IS 1489 (Part 1 & 2):1991
    • Pozzolana as per IS specifications (calcined clay, fly ash, etc.)
  • Mix Proportions (by mass) for Lime Pozzolana Concrete Blocks (Clause 4.1, Table 1):

Mix TypeLime-Pozzolana MixLimePozzolanaFine AggregateCoarse Aggregate (20 mm)Water (%)
Using Lime-Pozzolana Mixture LP201--1211
Using Lime-Pozzolana Mixture LP401--2410
Using Lime & Pozzolana Separately (Lime reactivity 40 kgf/cm²)-123611
Using Lime & Pozzolana Separately (Lime reactivity 80 kgf/cm²)-1261210
  • Note: Mix proportions are indicative and may be adjusted for desired performance.

Summary

  • Lime-pozzolana blocks use lime and pozzolana in specified ratios for strength and durability.
  • Water content varies between 10-11% by mass of total material.
  • Aggregates graded with max 20 mm size are used.
flowchart LR
    A[Lime] --> B[Mixing]
    C[Pozzolana] --> B
    D[Fine Aggregate] --> B
    E[Coarse Aggregate (20mm)] --> B
    B --> F[Lime Pozzolana Concrete Blocks]

This ensures blocks meet strength and durability requirements per IS 10359.

2Definitions

IS 10359: Definitions & Key Specifications Summary

Clause 2.1: Definitions

  • Definitions follow IS 3115-1978 (Lime-based blocks) and IS 6508-1972 (Building lime).
  • Refer these for precise terminology on lime, pozzolana, aggregates, and blocks.

Key Tables: Mix Proportions for Lime Pozzolana Concrete Blocks (Clause 4.1)

Mix TypeLime Pozzolana MixLimePozzolanaFine AggregateCoarse Aggregate (20 mm)Water % (by mass)
Using Lime-Pozzolana MixtureLP 201--12
LP 401--24
Using Lime and Pozzolana SeparateLime Reactivity 40 kgf/cm²-1236
Lime Reactivity 80 kgf/cm²-12612

Note: Mix proportions are indicative; adjust based on performance requirements.


Cement Specification (Clause 3.5)

  • Cement shall conform to:
    • IS 269:1989 (Ordinary Portland Cement)
    • IS 1489 (Part 1 & 2):1991 (Portland Pozzolana Cement)

Mixing Procedure (Clause 5.1.1)

  • Add part of total water first.
  • Add coarse aggregate, lime, and pozzolana or lime-pozzolana mixture.
  • Mix thoroughly.
  • Add remaining water and mix for at least 2 minutes.

Summary Diagram: Lime-Pozzolana Concrete Block Mix Process

flowchart TD
    A[Start: Add part water] --> B[Add coarse agg + lime + pozzolana]
    B --> C[Mix thoroughly]
    C --> D[Add remaining water]
    D --> E[Final mixing (≥2 min)]
    E --> F[
3Materials

IS 10359: Key Material Specifications & Mix Proportions

1. Recommended Mix Proportions for Lime Pozzolana Concrete Blocks (Clause 4.1)

Mix TypeLime Pozzolana MixtureLimePozzolanaFine AggregateCoarse Aggregate (20 mm)Water (%)
Using lime-pozzolana mixture LP 201--1211
Using lime-pozzolana mixture LP 401--2410
Using lime & pozzolana separately:
Lime reactivity 40 kgf/cm²-123611
Lime reactivity 80 kgf/cm²-1261210

Note: Water requirement is by mass of total material.


2. Storage of Materials (Clause 3.7)

  • Materials must be stored as per IS 4082-1977 to maintain quality.

3. Curing (Clause 8.1)

  • Initial curing: 72 hours.
  • Final curing: Minimum 28 days with regular moistening.

Summary

  • Mix design varies with lime grade and aggregate proportions.
  • Water content is critical (10-11% by mass).
  • Proper storage and curing ensure block quality.

flowchart TD
    A[Materials Storage] --> B[Mixing as per Table 1]
    B --> C[Initial Curing (72 hrs)]
    C --> D[Final Curing (28 days)]
    D --> E[Quality Lime Pozzolana Blocks]

For detailed manufacturing and testing, refer to IS 10359 and related IS codes (IS 3115, IS 6508).

4Mix Proportions

IS 10359 - Mix Proportions for Lime-Pozzolana Concrete Blocks

Key Mix Proportions (by Mass) — Table 1 (Clause 4.1)

Mix TypeLime-Pozzolana MixtureLimePozzolanaFine AggregateCoarse Aggregate (20 mm graded)Water (%)
Using Lime-Pozzolana Mixture
LP 201--1211
LP 401--2410
Using Lime and Pozzolana Separately
Lime Reactivity 40 kgf/cm²-123611
Lime Reactivity 80 kgf/cm²-1261210

Notes:

  • Water content is percentage by mass of total materials.
  • Adjust water and mix based on workability and absorption (see IS 2185 Part 1).
  • Proportions are guidelines; modify as needed for desired block performance.
  • Storage of materials per IS 4082-1977.

Summary:

  • Use LP 20 or LP 40 lime-pozzolana mix or separate lime and pozzolana.
  • Fine aggregate varies from 1 to 6 parts; coarse aggregate from 2 to 12 parts.
  • Water content ranges from 10% to 11% by mass.
flowchart LR
    A[Lime-Pozzolana Mix] --> B[Fine Aggregate]
    A --> C[Coarse Aggregate (20 mm)]
    B --> D[Water Addition (10-11%)]
    C --> D
    D --> E[Mixing & Compaction]
    E --> F[Concrete Blocks Manufacture]

This ensures uniform mixing and proper hydration for durable lime-pozzolana concrete blocks.

5Mixing

IS 10359: Mixing - Key Formulas, Tables & Specifications


1. Mixing Requirements (Clauses 6.1.2 & 5.1)

  • Uniform mixing is essential to ensure consistent quality.
  • Allow for water absorption by aggregates; adjust water content based on compaction method.
  • Preferably use mechanical concrete mixers for thorough mixing.

2. Storage of Materials (Clause 3.7)

  • Follow IS 4082-1977 for proper storage to maintain material quality.

3. Recommended Mix Proportions (Clause 4.1, Table 1)

SL No.DescriptionLime Pozzolana MixtureLimePozzolanaFine AggregateCoarse Aggregate (20 mm)Water (%)
1Using lime-pozzolana mixture
LP 201--1211
LP 401--2410
2Using lime and pozzolana separately
Lime reactivity 40 kgf/cm²-123611
Lime reactivity 80 kgf/cm²-1261210

Note: Mix proportions are indicative and may be adjusted for desired performance.


4. Water Adjustment Formula

[ W_{adjusted} = W_{required} + W_{absorption} ]

  • Where:
    • ( W_{required} ) = water % from table
    • ( W_{absorption} ) = water absorbed by aggregates (determined experimentally)

Summary:

  • Use mechanical mixers for uniformity.
  • Adjust water for aggregate absorption and compaction method.
  • Follow
6Manufacture

IS 10359 - Manufacture of Lime Pozzolana Concrete Blocks

Key Mix Proportions (Clause 4.1, Table 1)

Mix TypeLime Pozzolana MixLimePozzolanaFine AggregateCoarse Aggregate (20 mm)Water (%) by Mass of Total Material
Using Lime-Pozzolana mixture LP201--1211
Using Lime-Pozzolana mixture LP401--2410
Using Lime & Pozzolana separately-123 (40 kgf/cm²)611
Using Lime & Pozzolana separately-126 (80 kgf/cm²)1210

Note: Mix proportions can be adjusted for desired block performance.

Manufacturing Procedure (Clause 5.1.1)

  • Add part of total water first.
  • Add coarse aggregate, lime, and pozzolana or lime-pozzolana mixture into the mixer.
  • Mix thoroughly.
  • Add remaining water and mix for minimum 2 minutes.

Curing (Clause 8.1)

  • Initial curing: 72 hours.
  • Final curing: Keep blocks moist by spraying water regularly for at least 28 days.

Storage (Clause 3.7)

  • Follow IS 4082-1977 for proper storage of materials.

flowchart TD
    A[Add part water] --> B[Add coarse agg., lime, pozzolana]
    B --> C[Mix thoroughly]
    C --> D[Add remaining water]
    D --> E[Mix for >= 2 minutes]
    E --> F[Initial curing 72 hrs]
    F --> G[Final curing 28 days with moist spraying]

This ensures quality lime-pozzolana concrete blocks per IS 10359.

7Initial Curing

IS 10359: Initial Curing of Lime Pozzolana Concrete Blocks

Key Specifications (Clause 7.1)

  • Immediately after molding, blocks must be released from the mold with the base plate.
  • Blocks should be moved to a covered shed protecting from sun, strong wind, and rain.
  • Cover blocks with polythene sheets to retain moisture.
  • Minimum initial curing period: 72 hours to achieve sufficient hardness for handling without damage.

Purpose

  • Ensures proper hydration and strength gain before handling.
  • Prevents surface drying and cracking.

Curing Environment Requirements

  • Shed must provide:
    • Shade from sunlight
    • Protection against wind and rain
  • Maintain moisture retention by covering.

Summary Table for Curing Periods

Curing StageDurationConditions
Initial CuringMinimum 72 hrsCovered shed, covered with polythene
Final CuringMinimum 28 daysStacked, kept moist by spraying water regularly

Additional Notes

  • Initial curing is critical before final curing (Clause 8.1).
  • Final curing involves moist curing for at least 28 days to achieve full strength.
flowchart TD
    A[Molding of Block] --> B[Release from Mold + Base Plate]
    B --> C[Move to Covered Shed]
    C --> D[Cover with Polythene Sheets]
    D --> E[Initial Curing: 72 hrs minimum]
    E --> F[Stack Blocks for Final Curing]
    F --> G[Final Curing: 28 days moist curing]

Reference: IS 10359 Clauses 7.1 & 8.1

8Final Curing

IS 10359 - Final Curing of Lime Pozzolana Concrete Blocks

Key Specifications (Clause 8.1)

  • Initial curing: Minimum 72 hours after demoulding.
  • Final curing: Minimum 28 days.
  • Blocks must be stacked, covered, and kept moist by regular water spraying.
  • Protect blocks from sun, wind, and rain during curing (Clause 7.1).

Curing Process Summary

StageDurationConditions
Initial Curing≥ 72 hoursCovered shed, protected from sun/wind/rain
Final Curing≥ 28 daysStacked, covered, kept moist by water spray

Important Notes

  • Immediate removal from mould after preparation.
  • Maintain moisture to ensure proper hydration and strength gain.
  • Proper curing ensures good bond between layers (Clause 6.3.2).

Quick Reference Table: Final Curing Requirements

ParameterRequirement
Minimum initial curing72 hours
Minimum final curing28 days
Moisture maintenanceRegular water spraying
ProtectionCovered shed, no direct sun/wind/rain

flowchart TD
    A[Block Preparation] --> B[Demoulding]
    B --> C[Initial Curing (≥72 hrs)]
    C --> D[Stack & Cover Blocks]
    D --> E[Final Curing (≥28 days)]
    E --> F[Moisture Maintenance (Water Spray)]
    F --> G[Ready for Handling/Use]

For detailed mix proportions and curing practices, refer to Clause 4.1 and Table 1 of IS 10359.

Contact BIS offices for further clarifications or standards updates.

9Storage of Materials

IS 10359: Storage of Materials - Key Points

  • Storage Standard: As per Clause 3.7, storage of materials shall follow IS 4082:1996, which covers recommendations on stacking and storage of construction materials at site.

  • Storage Conditions (Clause 7.1):

    • Blocks must be removed from molds and placed on base plates in a covered shed.
    • Shed must protect against sun, strong wind, and rain.
    • Blocks should be covered with polyethylene sheets to retain moisture.
    • Minimum storage/curing period before handling: 72 hours.

Recommended Mix Proportions for Lime-Pozzolana Concrete Blocks (by mass) - Table Extract (Clause 4.1)

Mix TypeLime/Pozzolana MixtureFine AggregateCoarse Aggregate (20 mm)Water (%)
Using Lime-Pozzolana Mixture LP2011211
Using Lime-Pozzolana Mixture LP4012410
Using Lime & Pozzolana separately (Lime reactivity 40 kgf/cm²)Lime: 1, Pozzolana: 23611
Using Lime & Pozzolana separately (Lime reactivity 80 kgf/cm²)Lime: 1, Pozzolana: 261210

Note: Mix proportions may be adjusted for desired block performance.


flowchart TD
    A[Materials Stored as per IS 4082:1996] --> B[Blocks removed from mould]
    B --> C[Placed on base plate in covered shed]
    C --> D[Covered with polyethylene sheets]
    D --> E[Minimum 72 hours curing before handling]

Summary: Proper storage involves protection from weather, moisture retention, and minimum curing time to ensure block strength and durability.

10Quality Control

IS 10359: Quality Control Key Points

1. Mix Proportions (Clause 4.1, Table 1)

Mix TypeLime Pozzolana MixtureLimePozzolanaFine AggregateCoarse Aggregate (20 mm)Water (%)
LP 201--1211
LP 401--2410
Lime & Pozzolana separately (Lime reactivity 40 kgf/cm²)-123611
Lime & Pozzolana separately (Lime reactivity 80 kgf/cm²)-1261210

Note: Mix proportions can be adjusted to achieve desired block performance.


2. Curing Requirements (Clause 8.1)

  • Initial curing: 72 hours.
  • Final curing: Minimum 28 days.
  • Blocks must be kept moist by regular water spraying during curing.

3. Storage (Clause 3.7)

  • Follow IS 4082-1977 for storage of raw materials.

Summary Diagram of Quality Control Process

flowchart TD
    A[Raw Material Storage] --> B[Mixing as per Table 1]
    B --> C[Initial Curing (72 hrs)]
    C --> D[Stacking & Moisture Maintenance]
    D --> E[Final Curing (≥ 28 days)]
    E --> F[Quality Testing & Inspection]

References:

  • IS 10359 for mix and curing.
  • IS 4082 for storage.
  • Adjust water content and aggregates as per site conditions for quality control.
11Use of Blocks for Paving

IS 10359: Use of Lime-Pozzolana Concrete Blocks for Paving

Key Specifications (Clause 6.1)

  • Block Size: 300 mm × 300 mm × 100 mm (thickness)
  • Layer Composition:
    • Lower layer: 90 mm thick lime-pozzolana concrete
    • Wearing course: 10 mm thick cement-sand layer

Mix Proportions (Clause 4.1, Table 1)

Mix TypeLime-Pozzolana MixLimePozzolanaFine AggregateCoarse Aggregate (20 mm)Water (%)
Using Lime-Pozzolana mixture LP201--1211
Using Lime-Pozzolana mixture LP401--2410
Using Lime & Pozzolana separately (Lime reactivity 40 kgf/cm²)-123611
Using Lime & Pozzolana separately (Lime reactivity 80 kgf/cm²)-1261210

Note: Mix proportions may be adjusted to achieve desired performance.


Summary:

  • Use 300×300×100 mm blocks with a 90 mm base + 10 mm wearing layer.
  • Follow mix proportions as per Table 1 for durability and strength.
  • Water content ranges 10-11% by mass of total materials.
flowchart TD
    A[Raw Materials] --> B[Lime-Pozzolana Mix]
    B --> C[Mix with Aggregates]
    C --> D[Block Moulding (300x300x100 mm)]
    D --> E[Lower Layer (90 mm)]
    D --> F[Wearing Layer (10 mm)]
    E --> G[Drying & Curing]
    F --> G

This ensures durable, standardized paving blocks as per IS 10359.

Popular Questions About IS 10359

?What are the recommended mix proportions for lime-pozzolana concrete blocks?

According to IS 10359 Clause 4.1 Table 1, the recommended mix proportions (by mass) for lime-pozzolana concrete blocks are:

Mix TypeLime-Pozzolana MixtureLimePozzolanaFine AggregateCoarse Aggregate (20 mm)Water (%)
Using Lime-Pozzolana mixture LP201--1211
Using Lime-Pozzolana mixture LP401--2410
Using Lime and Pozzolana separately (Lime reactivity 40 kgf/cm²)-123611
Using Lime and Pozzolana separately (Lime reactivity 80 kgf/cm²)-1261210

Notes:

  • Water content is percentage by mass of total material.
  • Adjustments can be made to achieve desired block performance.
  • Blocks for paving are sized 300 x 300 x 100 mm, with a 90 mm lime-pozzolana base and 10 mm cement-sand wearing layer (Clause 6.1).

This ensures good strength and durability of lime-pozzolana concrete blocks.

?What materials and standards must lime and pozzolana conform to?

According to IS 10359, the materials must conform to the following standards:

  • Lime-Pozzolana Mixture: Shall conform to IS 4098:1982 (Specification for lime-pozzolana mixture).
  • Lime: Should comply with IS 712:1984 (Specification for building limes, second revision).
  • Pozzolana:
    • Fly ash as pozzolana must meet IS 3812 (Specification for fly ash for use as pozzolana and admixture).
    • Burnt clay pozzolana must conform to IS 1489 or relevant pozzolana specifications.
  • Aggregates: Coarse and fine aggregates must comply with IS 383 (Specification for coarse and fine aggregates from natural sources for concrete).

Mixing Procedure (Clause 5.1.1)

  • Add part of total water first.
  • Feed coarse aggregate, lime, and pozzolana (or mixture) into the mixer.
  • Add remaining water and mix thoroughly for minimum 2 minutes.

This ensures proper hydration and uniform mixing for quality lime-pozzolana concrete blocks.

?How should the curing process be conducted to ensure block durability?

Curing Process for Block Durability (IS 10359)

  • Immediate Protection: After molding, remove blocks with base plates to a covered shed protecting from sun, strong wind, and rain (Clause 7.1).
  • Covering: Blocks should be covered with polyethylene sheets to retain moisture.
  • Minimum Duration: Maintain curing for at least 72 hours before handling to prevent damage.
  • Water Quality: Use clean, potable water free from harmful materials (Clause 3.6).
  • Handling: Only handle blocks after sufficient hardening to avoid surface or structural damage.

Summary:

StepRequirement
ProtectionCovered shed, shield from elements
Moisture RetentionPolyethylene sheet covering
DurationMinimum 72 hours
Water QualityClean, potable water

Proper curing ensures hydration, strength gain, and durability of blocks.

?What are the standard dimensions and layering requirements for these blocks?

According to IS 10359:

Standard Dimensions:

  • Block size: 300 mm × 300 mm × 100 mm (Length × Width × Thickness)

Layering Requirements:

  • Total thickness: 100 mm
    • Lower layer: 90 mm thick lime-pozzolana concrete
    • Wearing coarse layer: 10 mm thick cement-sand topping

Mix Proportions (by mass) for Lime-Pozzolana Concrete (Clause 4.1, Table 1):

Lime-Pozzolana GradeLime-Pozzolana MixtureFine AggregateCoarse Aggregate (20 mm graded)Water (%)
LP 201-1 (fine), 2 (coarse)11
LP 401-2 (fine), 4 (coarse)10
Using Lime & Pozzolana separately (Lime reactivity 40 kgf/cm²)Lime 1, Pozzolana 23611
Using Lime & Pozzolana separately (Lime reactivity 80 kgf/cm²)Lime 1, Pozzolana 261210

Note: Mix proportions can be adjusted for desired performance.


Loading diagram...

This layering ensures durability and wear resistance for paving blocks.

?What methods of compaction are specified for manufacturing?

IS 10359 - Methods of Compaction for Manufacturing Lime-Pozzolana Concrete Blocks

  • Compaction of Lime-Pozzolana Concrete Layer (90 mm height of 100 mm mould):

    • Use pan type surface vibrator, table vibrator, or hand tamping.
    • If hand tamping, compact in two layers for uniform density.
  • Compaction of Wearing Coarse Layer (remaining 10 mm height):

    • Use cement-sand mortar (1:3) with water-cement ratio ~0.5 to 0.55.
    • Compact by pan vibrator, table vibrator, or hand tamping.
  • Workability Adjustment:

    • Adjust mix workability based on chosen compaction method (see IS 2185 Part I Clauses 6.1.2 & 6.1.3).

Summary Table of Compaction Methods

LayerHeight (mm)Compaction MethodsNotes
Lime-Pozzolana Concrete90Pan vibrator, Table vibrator, Hand tamping (2 layers if hand)Main concrete layer
Wearing Coarse Layer10Pan vibrator, Table vibrator, Hand tampingCement-sand mortar layer

This ensures uniform density and strength in blocks as per IS 10359.