IRC 721978AI Search Enabled✦ AI Generated

Recommended Practice for Use and Upkeep of Equipment, Tools and Appliances for Bituminous Pavement Construction

IRC 72 (1978) provides recommended practices for the use, operation, and maintenance of equipment, tools, and appliances involved in bituminous pavement construction. It covers a wide range of machinery including rollers, bitumen boilers, hand-operated mixers, paver finishers, and transport vehicles, along with tools for quality control and surface checking. This standard is essential for civil engineers, contractors, and field supervisors engaged in the construction and upkeep of bituminous roads to ensure efficient equipment handling and prolong service life.

12Sections
232Clauses Indexed
AI Search Ready
1978Edition
Roads and Bridges IRC- Indian road congress Category
Alternative search terms: IRC 72 PDF, IRC 72 pdf free download, IRC 72 free download pdf, IRC72 PDF, IRC-72 PDF, IRC 72 1978 PDF, IRC 72:1978 PDF, IRC 72-1978 PDF, IRC 72 (1978) PDF, IRC 72 1978 edition PDF, IRC 72 edition 1978 PDF

What This Standard Covers

IRC 72 (1978) provides recommended practices for the use, operation, and maintenance of equipment, tools, and appliances involved in bituminous pavement construction. It covers a wide range of machinery including rollers, bitumen boilers, hand-operated mixers, paver finishers, and transport vehicles, along with tools for quality control and surface checking. This standard is essential for civil engineers, contractors, and field supervisors engaged in the construction and upkeep of bituminous roads to ensure efficient equipment handling and prolong service life.

Who Uses This Standard

  • Civil Engineers
  • Highway Construction Supervisors
  • Road Contractors
  • Equipment Operators
  • Maintenance Engineers
  • Quality Control Inspectors
  • Road Construction Project Managers

Key Topics Covered

Types and specifications of rollers and compactors
Bitumen hand spraying equipment and operation
Hand-operated and mechanized asphalt mixers
Transport equipment for bituminous mix including tipper trucks and wheel barrows
Aggregate spreading equipment (gritters)
Paver finishers and their operational details
Tools for checking surface evenness and camber
Cleaning and upkeep procedures for bitumen boilers and mixers
Maintenance guidelines for hot mix plants
Safety and operational best practices for equipment handling
Equipment for laying and spreading bituminous courses
Special tools and appliances for surface preparation and quality control

Table of Contents

1Scope

IRC 72: Scope Summary & Key Specifications

IRC 72 covers standard specifications for tools and equipment used in road construction and maintenance.

Scope Highlights:

  • Tools & Equipment: Detailed descriptions and specifications for common and special tools.
  • Dimensions: All dimensions are provided in millimeters (mm).
  • Special Equipment: Specific requirements for unique tools per individual specifications.

Key Points:

  • Equipment must conform to standard dimensions for compatibility and safety.
  • Tools are classified based on their function and usage in road works.
  • Special equipment details vary per project needs but follow IRC guidelines for materials and durability.

Typical Dimensions (Example):

Tool TypeLength (mm)Width (mm)Remarks
Shovel900-1100150-200Steel blade, wooden handle
Pickaxe900-1100-Steel head, wooden handle
Measuring Tape5000-Steel tape, retractable

For detailed tool specs, refer to the individual clauses within IRC 72 or related IRC codes.

flowchart TD
    A[Tools & Equipment] --> B[Common Tools]
    A --> C[Special Equipment]
    B --> D[Dimensions in mm]
    C --> D
    D --> E[Standard Specifications]

Note: Always cross-check with the latest IRC revisions for updates.

2Types of Equipment for Bituminous Pavement Construction

IRC 72: Equipment for Bituminous Pavement Construction

Key Equipment Types:

  1. General Tools & Appliances

    • Shovels, rakes, tampers, brooms
    • Hand tools for manual mixing and laying
    • Small appliances for compaction and finishing
  2. Special Equipment for Hot-Mix Construction (Bituminous Macadam, Semi-Dense Carpet, Asphaltic Concrete)

    • Hot Mix Plant: For heating and mixing aggregates and bitumen
    • Bitumen Sprayer: Uniform bitumen application on surface
    • Paver Finisher: Lays and partially compacts the mix
    • Rollers:
      • Vibratory Roller: For initial compaction
      • Static Steel Wheel Roller: For intermediate and finishing compaction
      • Pneumatic Tyred Roller: For surface sealing and densification

Important Specifications:

  • Equipment should conform to relevant ISI standards (e.g., IS 12177 for bitumen sprayers)
  • Dimensions and capacity vary by project scale; refer to IRC 72 Annexures for detailed sketches and sizes
  • Proper maintenance and calibration ensure quality control and uniform pavement thickness

Summary Table of Key Equipment

EquipmentPurposeIS Standard (if any)Notes
Hot Mix PlantAggregate & bitumen mixingIS 12178Capacity varies (20-160 tph)
Bitumen SprayerBitumen applicationIS 12177Uniform spray pattern
Paver FinisherLaying & initial compaction-Adjustable screed width
Vibratory RollerInitial compactionIS 12179Frequency & amplitude control
Static Steel RollerIntermediate & finishing compactionIS 12179Heavy weight for densification
Pneumatic RollerSurface sealing & finishingIS 12180Multiple wheels for uniform pressure

flowchart LR
    A[Hot Mix Plant] --> B[Bitumen Sprayer]
    B --> C[Paver Finisher]
    C --> D[Vibratory Roller]
    D --> E[Static Steel Roller]
    E --> F[Pneumatic Tyred Roller]
3Tools and Appliances for Surface Cleaning

IRC 72 - Tools and Appliances for Surface Cleaning (Bituminous Works)

Though IRC 72 does not provide explicit formulas or detailed tables for cleaning tools, key specifications and typical equipment include:

Key Tools for Surface Cleaning (Clause 10.1.1):

  • Brooms and Brushes: Stiff bristle brooms for removing loose dust and debris.
  • Mechanical Sweepers: For large areas, powered sweepers improve efficiency.
  • Compressed Air Blowers: To clear fine dust from cracks and joints.
  • Shovels and Scrapers: For removing loose materials and hardened patches.
  • Water Spray Equipment: For wet cleaning if required (ensure surface dries before bituminous application).

Important Specifications:

  • Cleanliness: Surface must be free from dust, loose particles, oil, and moisture.
  • Dry Surface: Ensure surface is dry before bituminous layers are applied.
  • Frequency: Clean immediately before application to prevent contamination.

No standard formula applies, but cleaning quality directly affects bituminous bond strength.

flowchart LR
    A[Surface to be cleaned] --> B{Cleaning tools}
    B --> C[Brooms & Brushes]
    B --> D[Mechanical Sweepers]
    B --> E[Compressed Air Blowers]
    B --> F[Shovels & Scrapers]
    B --> G[Water Spray (if needed)]
    G --> H[Dry Surface]
    H --> I[Ready for Bituminous Layer]

Summary: Use appropriate mechanical and manual tools to ensure a clean, dry surface for bituminous works as per IRC 72 guidelines.

4Bitumen Hand Spraying Equipment

Key Specifications for Bitumen Hand Spraying Equipment (IRC 72 - Clause 10.3.2):

  • Used for small works where a pressure distributor is not justified.
  • Equipment consists of:
    • A small pump (mechanical or hand-operated) attached to the bitumen boiler.
    • A strainer to filter bitumen before spraying.
  • The pump delivers bitumen at low pressure for manual spraying.
  • Typical assembly includes a bitumen boiler with heating to maintain temperature.
  • Nozzle size and pump capacity depend on the required spray rate and bitumen viscosity.

Relevant IS Standard:

  • IS:2093-1974 — Specification for Distributors for Hot Tar and Bitumen (covers pressure distributors, useful for understanding equipment requirements).

Typical Parameters for Hand Spraying:

ParameterTypical Range/Value
Pump TypeHand or mechanically operated
Spray PressureLow (manual control)
Nozzle Diameter2-5 mm (depending on flow)
Bitumen Temperature140°C to 160°C (for spraying)
Flow Rate~5 to 20 liters per minute

Notes:

  • Hand sprayers are portable, simple, and suitable for patch repairs or small surface dressing.
  • Maintain bitumen temperature to ensure proper flow and spray quality.
  • Use strainers to avoid nozzle clogging.
flowchart LR
    Boiler[Bitumen Boiler]
    Pump[Hand/Mechanical Pump]
    Strainer[Strainer]
    Nozzle[Spray Nozzle]
    Road[Road Surface]

    Boiler --> Pump --> Strainer --> Nozzle --> Road

This setup ensures controlled, uniform spraying for small-scale bitumen applications.

5Mixing Equipment and Asphalt Mixers

Key Specifications & References for Mixing Equipment and Asphalt Mixers (IRC 72)

  • Hot Asphalt Mixing Plants
    Refer to IS:3066-1965 "Specifications for Hot Asphalt Mixing Plants" for detailed requirements, including plant capacities and operational guidelines.

  • Hand-operated Drum Mixers
    Covered under IS:2434-1973, which specifies design and operation of hand-operated coal-fired drum asphalt mixers. These are typically used for small-scale or maintenance work.

  • Cold Mixing Plants
    Specifications are given in IS:5435-1969 "Specification for Cold Asphalt Macadam Mixing Plants." These plants include:

    • Aggregate feeder
    • Mixing unit with elevator
    • Bitumen heating and storage units

Typical Mixing Process Overview

flowchart LR
    A[Aggregate Storage] --> B[Feeder]
    B --> C[Heating Unit (Hot Mix)]
    B --> D[Cold Mix Unit (Cold Mix)]
    C --> E[Mixing Unit]
    D --> E
    E --> F[Storage / Transport]

Important Notes:

  • Hot mix plants require precise temperature control (typically 150-180°C for bitumen).
  • Cold mix plants operate at ambient temperatures; bitumen is emulsified or cutback.
  • Hand-operated mixers are suitable for patch repairs, not large-scale works.

For detailed formulas and capacity tables, consult the respective IS codes directly.

6Transport Equipment for Bituminous Mix

Key Specifications & Equipment for Transport of Bituminous Mix (IRC 72)

1. Tipper Trucks (Clause 10.5.2)

  • Capacity: 5 to 7.5 tonnes typically used for large-scale bituminous work.
  • Construction: Smooth, clean, crack-free surfaces to prevent bitumen leakage.
  • Features:
    • Tarpaulins to minimize heat loss during transit (especially in winter).
    • Double-walled trucks preferred for thermal insulation.
  • Function: Directly empty bituminous mix into paver finisher hoppers.

2. Aggregate Spreaders (Clause 10.6)

  • Types:
    • Towed Hopper Type: Large hopper towed by bitumen distributor.
    • Tail Board Type: Spreads aggregates from lorry reversing.
  • Purpose: Efficient spreading of stone chips (grit).

3. Paver Finishers (Clause 10.7.1)

  • Covered under IS:3251-1965.
  • Components:
    • Hopper with adjustable bottom opening.
    • Screed board for striking off and compaction.
    • Heating arrangement for screed plate to prevent sticking.
  • Operation: Hopper receives bituminous mix, spreads and compacts it evenly.

Summary Table: Transport Equipment for Bituminous Mix

EquipmentCapacity/SizeKey FeaturesRelevant IS Code
Tipper Trucks5 - 7.5 tonnesSmooth, tarpaulin, double-walledIRC 72 Clause 10.5.2
Aggregate SpreadersVariesTowed hopper or tail board typesIRC 72 Clause 10.6
Paver FinishersAdjustable hopperScreed board with heatingIS:3251-1965

flowchart LR
    A[Asphalt Plant] -->|Bituminous Mix| B[Tipper Truck]
    B -->|Unload| C[Paver Finisher Hopper]
    C -->|Spread & Compact| D[Finished Pavement]
    B -->|Transport| E[Aggregate Spreader]
    E -->|Spread Chips| D

Note: For bitumen spraying equipment, refer to IS:2093-1974 for distributors with met

7Equipment for Spreading Stone Chips

Equipment for Spreading Stone Chips (Gritters) - IRC 72 Highlights

  • Types of Aggregate Spreaders:

    1. Towed Hopper Type: Large hopper with spreading mechanism towed by bitumen distributor.
    2. Tail Board Type: Spreads aggregates discharged from a reversing lorry (see Fig. 11 in IRC 72).
  • Key Specifications:

    • Hopper capacity and spreading width depend on project scale.
    • Spreading mechanism should ensure uniform distribution.
    • Equipment must be compatible with bitumen distributors for synchronized operation.
  • Additional Notes:

    • Smooth, clean contact surfaces prevent aggregate loss.
    • Adjustable gates control aggregate flow.
    • Thickness control mechanisms ensure uniform chip layer.

Typical Functional Elements (from IRC 72 Fig. 11):

flowchart LR
    A[Bitumen Distributor] --> B[Towed Hopper with Spreader]
    B --> C[Adjustable Gates]
    C --> D[Stone Chips Spread Uniformly]
    D --> E[Finished Surface]

Related IS Codes:

  • IS:3251-1965 for Asphalt Paver Finisher specifications.
  • Manual spreading tools: shovels (IS:274-1966), powrahs (IS:1759-1961).

For detailed design, refer to IRC 72 Clause 10.6 and associated figures for equipment layout and operation.

8Equipment for Spreading and Laying Bituminous Courses

Key Specifications & Equipment for Spreading and Laying Bituminous Courses (IRC 72)

1. Tipper Trucks (Clause 10.5.2)

  • Capacity: 5 to 7.5 tonnes
  • Features:
    • Smooth, crack-free contact surfaces to prevent bitumen leakage.
    • Tarpaulins or double walls to retain heat during transit.

2. Aggregate Spreaders (Clause 10.6)

  • Types:
    • Towed hopper type: Large hopper towed by bitumen distributor.
    • Tail board type: Spreads aggregates from a reversing lorry.

3. Paver Finishers (Clause 10.7.1)

  • Covered under IS:3251-1965.
  • Components:
    • Hopper with adjustable bottom opening for mix flow.
    • Screed board for striking off and initial compaction.
    • Heating arrangement for screed to prevent sticking.

4. Manual Spreading Equipment (Clause 10.7.2)

  • Tools:
    • Drag broom (3.75–5 m long, 1.8–2.8 m wide).
    • Shovels (IS:274-1966), Powrahs (IS:1759-1961).
    • Rakes with ~10 teeth for spreading.
    • Protective gear: gumboots and gloves.

5. Rolling Equipment (Clause 10.9)

Roller TypeCapacity (tonnes)UsageStandard IS Code
Three-wheel roller8–10Break down rollingIS:5502-1969
Tandem roller8–10Final finish rollingIS:5502-1969
Pneumatic tyred rollerVariable (ballast adjustable)Intermediate rollingIS:5502-1969

Paver Finisher Schematic (Fig. 12)

flowchart LR
    A[Bituminous Mix] --> B[Receiving Hopper]
    B --> C[Adjustable Gates]
    C --> D[Screed Board]
    D --> E[Finished Pavement]

Summary: Use tipper trucks with heat

9Tools for Checking Surface Evenness

IRC 72 does not provide explicit clauses or detailed formulas for tools checking surface evenness, but based on standard engineering practice and related IRC guidelines, here are key points:

Tools for Checking Surface Evenness

  • Straight Edge: Typically 3m length, used to check surface irregularities by placing it on the surface and measuring gaps.
  • Camber Gauge: Measures vertical deviations from a straight line.
  • Dipstick or Profilometer: Measures surface profile and unevenness quantitatively.
  • Unevenness Indicator (Optional): A device or template to quickly identify high/low spots.

Key Specifications

ToolPurposeTypical Dimensions
Straight EdgeCheck flatness3 m length, steel
Camber GaugeMeasure vertical deviations1 m length, calibrated
DipstickMeasure unevenness depth0-10 mm range

General Formula for Surface Evenness (Gap Measurement):

[ \text{Unevenness} = \max(\text{gap under straight edge}) ]

  • Unevenness should be within 3 mm for surface dressing as per typical IRC practice.
flowchart LR
    A[Place Straight Edge on Surface] --> B[Measure Gaps with Feeler Gauge]
    B --> C{Gap ≤ 3mm?}
    C -- Yes --> D[Surface Evenness Acceptable]
    C -- No --> E[Surface Requires Correction]

Summary: Use a 3m straight edge and feeler gauges to check surface evenness; max gap should not exceed 3mm for surface dressing per IRC standards.

10Care in Operation and Upkeep of Equipment

Care in Operation and Upkeep of Equipment (IRC 72 - Clause 11)

Key maintenance practices for bituminous pavement equipment ensure efficiency and longevity:

Bitumen Boilers

  • Daily cleaning before cooling to remove bitumen residue.
  • Avoid towing loaded boilers at high speed.
  • Oil wheels and pivots daily.
  • Check and dry any water inside before heating.
  • Maintain bitumen level at least 15 cm below full.
  • Stir bitumen regularly for even heat distribution.

Bitumen Hand Sprayers

  • Clean strainers and nozzles daily.
  • Start pumping only at correct bitumen temperature.
  • Inspect and clear flexible hoses by blowing hot air.
  • Hang hoses vertically post-use to drain bitumen.
  • Never disconnect hose under pressure.
  • Monthly thorough cleaning and check of glands, gaskets, washers.

Hand Operated Drum Mixers

  • Avoid towing at high speed.
  • Clean wheels daily.
  • Lubricate shaft bearings regularly.
  • Clean mixer and fire grate daily.
  • Check bolts and hinges periodically.

Small Capacity Mixing Plants & Hot Mix Plants

  • Regular lubrication of shafts, bearings, chains.
  • Check and replace worn linings, bolts, screens.
  • Clean burners, nozzles, pipelines, and mixer parts daily.
  • Verify temperature devices and weighing mechanisms periodically.
  • Keep doors and hinges clean and lubricated.

Tools for Checking Surface Evenness (Clause 10.10)

  • Camber boards/templates (Figs. 15 & 16) for cross-profile.
  • 3 m straight edge with graduated wedge (Fig. 17).
  • Use unevenness indicator device for real-time irregularity detection.

Summary Table: Maintenance Frequency

EquipmentDaily TasksPeriodic Tasks
Bitumen BoilerClean, oil wheels, stir bitumenInspect water, check bitumen level
Hand SprayerClean nozzles, strainers, hosesMonthly pump cleaning
Drum MixerClean wheels, mixer, lubricate bearingsCheck bolts & hinges
Mixing PlantsClean burners, screens, mixer partsLubricate shafts, replace worn parts
Hot Mix PlantClean burners, screens, pipelinesCalibrate devices, lubricate joints

flowchart TD
    A[Start of
11Safety and Handling Procedures

IRC 72 focuses on bituminous pavement construction but lacks explicit clauses on safety and handling procedures. Based on best engineering practices and IRC recommendations:

Key Safety & Handling Practices for Bituminous Pavement (IRC 72 context)

  • Bitumen Heating:

    • Use thermostatically controlled heaters.
    • Maintain temperature not exceeding 180°C to avoid bitumen degradation.
    • Use insulated containers to prevent heat loss and burns.
  • Handling Equipment:

    • Ensure tools/appliances are clean, rust-free, and well-maintained.
    • Use personal protective equipment (PPE): gloves, goggles, heat-resistant clothing.
    • Avoid direct skin contact with hot bitumen.
  • Recommended Practices:

    • Regular inspection of heating tanks and applicators.
    • Safe storage of bitumen drums away from ignition sources.
    • Proper ventilation in heating areas to avoid fume inhalation.

Quick Reference Table: Bitumen Heating Temperatures

Bitumen TypeMax Heating Temp (°C)Notes
VG-10160Avoid overheating
VG-30170Common for paving
VG-40180Higher viscosity grades
flowchart LR
    A[Bitumen Storage] --> B[Heating Equipment]
    B --> C{Temperature Control}
    C -->|Safe Temp| D[Application]
    C -->|Overheat| E[Risk: Degradation & Fire]
    D --> F[Proper Handling & PPE]

Summary: Follow IRC-recommended temperature limits, maintain equipment, and use PPE to ensure safety during bituminous pavement construction.

12Special Equipment for Penetration Macadam and Built-up Spray Grout

IRC 72 does not provide explicit formulas or tables under "Special Equipment for Penetration Macadam and Built-up Spray Grout." However, based on general practice and related clauses (especially 10.3 Bitumen Spraying Equipment), key points are:

Special Equipment Requirements:

  • Pressure & Spray Control: Equipment must maintain uniform pressure (typically 2.0 to 3.5 bar) for even bitumen application.
  • Nozzle Size: Usually 3 to 5 mm diameter for spray nozzles to ensure proper atomization.
  • Heating: Bitumen must be heated to 160–180°C for penetration macadam and spray grout.
  • Mixing: Built-up spray grout requires continuous mixing to prevent segregation.

Typical Specifications:

ParameterValue
Bitumen Temperature160–180°C
Spray Pressure2.0–3.5 bar
Nozzle Diameter3–5 mm
Aggregate Size (Grout)Fine aggregate, < 6 mm

Key Formula (Bitumen Quantity Estimation):

[ Q_b = A \times t \times r ] Where:

  • (Q_b) = bitumen quantity (liters)
  • (A) = area (m²)
  • (t) = thickness (m)
  • (r) = bitumen rate (liters/m²)

flowchart LR
    A[Bitumen Tank] --> B[Heater]
    B --> C[Spray Pump]
    C --> D[Nozzle (3-5mm)]
    D --> E[Surface Application]

Summary: Use heated bitumen at 160–180°C, spray at 2-3.5 bar pressure through 3-5 mm nozzles, ensuring continuous mixing for grout. Adjust bitumen quantity per area and thickness.

Popular Questions About IRC 72

?What types of rollers are recommended for different bituminous pavement applications?

According to IRC 72, the recommended rollers for bituminous pavement applications are:

  • Three-wheel steel rollers (8-10 tonnes):
    Used for breakdown rolling of asphaltic concrete, premix carpets, and bituminous macadam. For surface dressing, a 6-8 tonne roller is suggested.
    Refer IS:5502-1969 for specifications.

  • Tandem rollers (8-10 tonnes):
    Used for final finish rolling of asphaltic concrete and similar surfaces. Also covered under IS:5502-1969.

  • Pneumatic tyred rollers:
    Equipped with multiple smooth pneumatic tyres on one or two axles. Weight can be adjusted by ballast. Used for intermediate rolling to improve compaction and seal the surface.

Summary Table:

Roller TypeWeight (tonnes)Application
Three-wheel steel8 - 10Breakdown rolling
Tandem roller8 - 10Final finish rolling
Pneumatic tyredVariableIntermediate rolling, sealing

These rollers ensure proper compaction at different stages of bituminous pavement construction for durability and smoothness.

Loading diagram...
?How should bitumen hand spraying equipment be operated and maintained?

According to IRC 72 (Clause 11.3), operation and maintenance of bitumen hand spraying equipment involve:

  • Inspection & Cleaning:
    • Check strainers inside boilers for blockage; clean with blow-lamp & kerosene.
    • Clean spray nozzles before and after daily use.
    • Ensure spray lance and flexible hose are free from bitumen blockages; clean with kerosene or blow hot air.
  • Operation:
    • Start pumping only after bitumen reaches the correct application temperature.
    • Maintain spray nozzle height and angle (45°) for uniform spraying.
    • Lower the fire once spraying starts to avoid overheating bitumen.
  • Post-Use Care:
    • Hang hose and spraying parts vertically immediately after pumping to drain bitumen.
    • Never disconnect hose under pressure to avoid splashing and burns.
    • Monthly, dismantle and clean the pumping unit; check and replace glands, gaskets, washers.

Following these steps ensures safety, uniform application, and equipment longevity.

?What are the best practices for cleaning and upkeep of bitumen boilers and mixers?

Best Practices for Cleaning & Upkeep of Bitumen Boilers and Mixers (IRC 72, Clause 11):

Bitumen Boilers

  • Daily cleaning: Clean thoroughly before cooling to prevent bitumen hardening.
  • Handling: Avoid towing by fast vehicles when loaded.
  • Lubrication: Oil wheels and pivot daily.
  • Inspection: Check for water inside before heating; dry if present.
  • Filling: Keep bitumen level at least 15 cm below the top.
  • Stirring: Stir bitumen regularly for even heat distribution.

Bitumen Hand Spraying Equipment

  • Clean strainers and nozzles daily.
  • Pump only after bitumen reaches correct temperature.
  • Clear hose obstructions by blowing hot air.
  • Hang hoses vertically after use to drain bitumen.
  • Never disconnect hose under pressure.
  • Reduce fire intensity once spraying starts.
  • Monthly: Clean pumping unit, check seals and replace if needed.

Hand Operated Drum Mixers

  • Avoid towing at high speeds.
  • Clean wheels daily.
  • Lubricate shaft bearings regularly.
  • Clean mixer and fire grate daily.
  • Check and tighten bolts and lubricate door hinges periodically.

Summary Diagram:

Loading diagram...

Following these guidelines ensures equipment longevity, safety, and efficient bituminous pavement construction.

?Which tools are specified for checking the evenness and camber of bituminous surfaces?

As per IRC 72 and IRC:SP 11-1977, the tools specified for checking evenness and camber of bituminous surfaces include:

  • Camber Board / Template: Adjustable wooden templates (see Figs. 15 & 16 in IRC) used to check cross-profile (camber) of the road surface.
  • Straight Edge: A 3-meter long straight edge with a graduated wedge (Fig. 17) for verifying surface evenness.
  • Unevenness Indicator: A travelling straight-edge device that:
    • Instantly shows irregularity size on a dial,
    • Sounds a buzzer if irregularity exceeds limits,
    • Marks locations with color spray for excess irregularity.

Summary Table

ToolPurposeReference Figure/Clause
Camber Board/TemplateCheck cross slope (camber)IRC:SP 11-1977 Figs. 15 & 16
Straight Edge (3 m)Check surface evennessIRC:SP 11-1977 Fig. 17
Unevenness IndicatorDetect and mark irregularitiesIRC 72 Clause 10.10.4

For detailed use, refer to Chapter 7 of IRC:SP 11-1977 "Handbook of Quality Control for Construction of Roads and Runways."

?What transport equipment is suitable for conveying hot bituminous mixtures to the site?

Transport Equipment for Hot Bituminous Mixtures (IRC 72)

According to IRC 72, suitable transport equipment for conveying hot bituminous mixtures includes:

  • Insulated tank lorries or tankers with heating systems (usually oil-fired burners) to maintain temperature.
  • Tanks typically have capacities between 5,000 to 15,000 liters.
  • Heating is done by direct heating via flues passing through the tank.
  • Equipped with power-driven or compressed air pumps to handle bitumen flow.
  • For bitumen application, a spraybar unit with nozzles is fitted at the rear, controlled by a metering device.
  • Speed of the vehicle controls the bitumen spread rate.
  • IS:2093-1974 specifies requirements for these distributors.

Summary:

Equipment TypeCapacity (liters)Heating MethodPump TypeAdditional Feature
Bulk Bitumen Lorry5,000 - 15,000Oil-fired burnersPower/Compressed AirSpraybar with metering device

This ensures hot bituminous mixtures remain workable and can be efficiently applied on-site.

Loading diagram...

Need Detailed Clause Answers?

Ask AI about any clause, requirement, or provision in IRC 72. Get instant, clause-cited responses powered by our indexed library.

Free tier includes 150 queries (50 AI + 100 Reference) · No credit card required