IRC 40 (Second Revision, 2002) provides comprehensive specifications and code of practice for the use of brick, stone, and cement concrete block masonry in road bridge construction. It covers detailed guidelines on materials, masonry types, laying techniques, curing, expansion gaps, and structural elements such as retaining walls, piers, abutments, and arches. This standard is essential for engineers and construction professionals involved in designing and building durable masonry components of road bridges in India.
Overview
IRC 40 (Second Revision, 2002) provides comprehensive specifications and code of practice for the use of brick, stone, and cement concrete block masonry in road bridge construction. It covers detailed guidelines on materials, masonry types, laying techniques, curing, expansion gaps, and structural elements such as retaining walls, piers, abutments, and arches. This standard is essential for engineers and construction professionals involved in designing and building durable masonry components of road bridges in India.
Audience
Contents
Structure
The key definitions and general requirements for IRC 40 are outlined in Clause 401 (Definitions) and Clause 400 (Scope). The code covers brick, stone, and cement concrete block masonry for road bridges. Cement types used must conform to specific IS standards as per Table 402.1, including 33 and 43 Grade OPC, Portland slag cement, and pozzolana cements. General requirements include adherence to materials, design considerations, construction workmanship, expansion gaps, and floor protection works as detailed in Clauses 402 to 406. The relevant cement specifications are:
| Type | In accordance with |
|---|---|
| (a) 33 Grade ordinary portland cement | IS:269-1989 |
| (b) 43 Grade ordinary portland cement | IS:8112-1989 |
| (c) Portland slag cement | IS:455-1989 |
| (d) Portland pozzolana cement (fly ash based) | IS:1489(Part-I)-1991 |
| (e) Portland pozzolana cement (calcined clay based) | IS:1489(Part-II)-1991 |
| (f) Sulphate resisting portland cement | IS:12330-1988 |
These form the basis for materials and workmanship standards in bridge masonry works.
Sources: Clause 400, Clause 401, Table 402.1
Key specifications for abutments per IRC 40 include:
Thickness: Must ensure stresses under worst load combinations are within permissible limits (Clause 403.11.1).
Top Width: As per Table 4 (Clause 403.11.2.1), for slab and girder bridges just below caps:
| Span (m) | ≤ 3 | >3 ≤ 6 | >6 ≤ 12 | >12 ≤ 15 |
|---|---|---|---|---|
| Top width of piers with simply supported span and all abutments (mm) | 500 | 1000 | 1200 | 1600 |
| Top width of pier with continuous span (mm) | 500 | 750 | 1000 | 1300 |
For arch bridges, top width must accommodate skewbacks and resist stresses under worst loading (Clause 403.11.2.2).
Wing walls and returns must have a minimum top width of 450 mm (Clause 403.11.2.3).
For multiple span arch bridges, abutment piers are provided after every 3rd to 5th span (Clause 403.11.3).
The slenderness ratio limit: height to base width ratio shall not exceed 6 (Clause 403.11.4).
Stability checks must consider sliding with friction coefficient 0.6 and overturning (Clauses 403.10, 403.9).
These form the core design parameters for abutments in IRC 40.
Sources: Clause 403.11.1, Clause 403.11.2.1, Clause 403.11.2.2, Clause 403.11.2.3, Clause 403.11.3, Clause 403.11.4, Clause 403.10, Clause 403.9
Ashlar masonry in IRC 40 is governed by detailed bonding, joint thickness, and curing specifications as per Clause 404.3.5 and related sub-clauses. Key points include:
Table of Maximum Joint Thickness:
| Masonry Type | Max Joint Thickness |
|---|---|
| Coursed rubble | 20 mm |
| Block work | 12 mm |
| Ashlar masonry | 6 mm |
These requirements ensure structural integrity and proper bonding in Ashlar masonry for bridge works and similar structures.
Sources: Clause 404.3.5, Clause 404.3.7, Clause 404.2.7
The effective height for calculating the slenderness ratio of piers or abutments in IRC 40 is defined as the dimension of the height of the pier or abutment assumed for slenderness calculations, as per Clause 401.8. Reference is made to the Note below Table 13 in IRC:21 Clause 306.1.2 for detailed guidance. Additionally, the effective height relates to the space between the extrados and the horizontal tangent line to the crown (Fig. 4). This effective height is critical for stability and slenderness checks in bridge components.
Sources: Clause 401.8, IRC:21 Clause 306.1.2 Note, Clause 401.9
For Random Rubble Masonry as per IRC 40, the key specifications are:
Permissible Compressive Stress: According to Clause 403.4.4, permissible compressive stresses for random rubble masonry (IS:1597 Part-I) are 67% of the values given in Table 2 (not fully provided here). Random rubble masonry is limited to return and toe walls up to 5 m height.
Permissible Tensile Stress: From Table 3 (Clause 403.5), allowable flexural tensile stresses (MPa) for stone masonry with various mortar mixes are:
| Type of Masonry | 1:3 Cement:Sand | 1:4 Cement:Sand | 1:5 Cement:Sand | 1.0:0.5:4.5 Cement:Lime:Sand |
|---|---|---|---|---|
| Stone | 0.10 | 0.07 | 0.05 | 0.10 |
Permissible Shear Stress: Clause 403.6 states shear stress shall be the greater of (i) allowable tensile stress from Table 3 or (ii) one-third of compressive stress due to dead load, but not exceeding 0.2 MPa. Note a 20% reduction applies for substructure of arch bridges.
Permissible Overstress: Clause 403.8 allows up to 25% overstress for eccentric/lateral loads excluding seismic, and up to 50% overstress including seismic forces.
These form the core design limits for random rubble masonry under IRC 40.
Sources: Clause 403.4.4, Clause 403.5, Clause 403.6, Clause 403.8
Key specifications and formulas for Retaining Walls as per IRC 40 include:
Stability Checks: Stability must be verified for all construction phases and service conditions with factors of safety per Clause 7.6.3.4 of IRC:78 (Clause 403.9).
Sliding Resistance: Use a coefficient of friction of 0.6 between masonry interfaces unless otherwise specified (Clause 403.10).
Wall Thickness: Must ensure stresses from worst load combinations remain within permissible limits (Clause 403.11.1).
Top Width of Piers and Abutments: As per Table 4 (Clause 403.11.2.1):
| Span in m | ≤ 3 | >3 ≤ 6 | >6 ≤ 12 | >12 ≤ 15 |
|---|---|---|---|---|
| Top width of piers with simply supported span and all abutments (mm) | 500 | 1000 | 1200 | 1600 |
| Top width of pier with continuous span (mm) | 500 | 750 | 1000 | 1300 |
Wing Walls and Returns: Minimum top width 450 mm (Clause 403.11.2.3).
Height to Base Width Ratio: Shall not exceed 6 (Clause 403.11.4).
Arch Bridges: Top widths must accommodate skewbacks and resist stresses under worst loading (Clause 403.11.2.2).
These guidelines ensure structural adequacy and stability of retaining walls and associated components.
Sources: Clause 403.9, Clause 403.10, Clause 403.11.1, Clause 403.11.2.1, Clause 403.11.2.3, Clause 403.11.4
Design considerations per IRC 40 Clause 403 include:
General features must follow IRC:5 for dimensions and IRC:6 for loads and stresses, with masonry bridges limited to spans ≤15 m and height ≤10 m (Clause 403.1).
Load dispersion through masonry footings and arches is at 45° to vertical. For arches, the cushion above the crown must be ≥500 mm with minimum 12% CBR filling; for submersible bridges, a PCC cushion ≥300 mm thick is required (Clause 403.3).
Permissible compressive stress depends on crushing strength of masonry units and mortar grade, detailed in the following table (Clause 403.4.1):
| Cement:Lime | Sand | Days | Crushing Strength of Unit (MPa) |
|---|---|---|---|
| 7 | |||
| 1:3 - | - | 7 | 0.7 |
| 1 - | 4 | 14 | 0.6 |
| 1 - | 5 | 14 | 0.6 |
| *1:0.5 | 4.5 | 14 | 0.7 |
*Gauged/composite mortar.
Linear interpolation is allowed for intermediate crushing strengths.
For well foundations, mortar shall not be leaner than 1:3.
These form the key design bases for masonry bridges under IRC 40.
Sources: Clause 403.1, Clause 403.3, Clause 403.4.1
For piers and abutments in rivers with velocity exceeding 4.5 m/sec carrying abrasive particles, IRC 40 Clause 403.11.5 mandates special precautions:
Weep holes (Clause 403.11.6) must be provided at max 2 m horizontal and 1 m vertical spacing, staggered, with lowest row 150 mm above low water or ground level. Use 100 mm diameter AC pipes for masonry structures, with slope 1 vertical:20 horizontal towards draining face and a filter layer behind.
Wing walls (Clause 403.11.7) must have minimum 600 mm height at the end away from abutment, extending 600 mm parallel to traffic.
Top widths of piers and abutments (Clause 403.11.2.1) for slab and girder bridges are given in the table below:
| Span (m) | <=3 | >3 to <=6 | >6 to <=12 | >12 to <=15 |
|---|---|---|---|---|
| Top width of piers (simply supported) and all abutments (mm) | 500 | 1000 | 1200 | 1600 |
| Top width of piers (continuous span) (mm) | 500 | 750 | 1000 | 1300 |
The height to base width ratio of piers/abutments shall not exceed 6 (Clause 403.11.4). Stability checks must consider sliding with friction coefficient 0.6 (Clause 403.10).
Sources: Clause 403.11.5, Clause 403.11.6, Clause 403.11.7, Clause 403.11.2.1, Clause 403.11.4, Clause 403.10
Key specifications and formulas for Masonry Arch Bridges per IRC 40 include:
Span and Height Limits: Masonry bridges are generally limited to spans not exceeding 15 m and masonry height above foundations not exceeding 10 m (Clause 403.1).
Load Dispersion: Loads on footings and over arches are dispersed at 45° to the vertical. For arch bridges, the load includes road surface and filling up to the extrados, with cushion thickness minimum 500 mm (300 mm PCC for submersible bridges) (Clause 403.3).
Permissible Compressive Stress: Depends on crushing strength of masonry units and mortar grade, given in Table 2. For arch rings, max permissible stress is 1.6 MPa, except Ashlar stone masonry up to 2.5 MPa (Clauses 403.4.1, 403.4.2).
Special Precautions: For piers/abutments in rivers with velocity >4.5 m/s, extra 100 mm sacrificial thickness, minimum 250 mm course height for stone masonry, and bricks with crushing strength ≥10 MPa are required (Clause 403.11.5).
Weep Holes: Spaced max 2 m horizontally and 1 m vertically, 150 mm above low water level, with 100 mm diameter AC pipes (Clause 403.11.6).
Seismic Restrictions: Masonry arch bridges with spans >6 m are not permitted in Seismic Zones IV and V (Clause 403.13).
Arch Construction: Full-scale arch templates, radial joints, symmetrical laying, and proper centering and stripping procedures are specified (Clauses 404.5.1 to 404.5.5).
Expansion Gaps: 40 mm gap every 30 m length, filled with flexible material (Clause 405).
Table 2 (Permissible Compressive Stress in MPa):
| Mortar Mix (Cement:Lime:Sand) | Crushing Strength of Unit (MPa) | 7 Days | 10.5 Days | 14 Days | 21 Days | 28 Days | 35+ Days |
|---|---|---|---|---|---|---|---|
| 1:3:- | 7 | 0.7 | 1.1 | 1.3 | 1.7 | 2.1 | 2.5 |
| 1:-:4 | 10.5 | 0.6 | 0.9 | 1.1 | 1.5 | 1.9 | 2.2 |
| 1:-:5 | 14 | 0.6 | 0.9 | 1.0 | 1.4 | 1.7 | 2.0 |
| 1:0.5:4.5* | 21 | 0.7 | 1.1 | 1.3 | 1.7 | 2.1 | - |
*Gauged/composite mortar
This summary is based on IRC 40 Clauses 403, 404, and 405 only.
Sources: Clause 403.1, Clause 403.3, Clause 403.4.1, Clause 403.4.2, Clause 403.11.5, Clause 403.11.6, Clause 403.13, Clause 404.5.1, Clause 404.5.4, Clause 404.5.5, Clause 405
Key specifications for Brick Masonry per IRC 40 include:
Wetting of bricks: Bricks must be soaked for at least 1 hour and surface dried before laying to ensure proper bond (Clause 404.2.2).
Laying: Brickwork shall be laid in English Bond, true to line, plumb, and level with whole bricks at faces and junctions (Clause 404.2.3).
Plastering:
Curing:
Foundation laying:
These ensure durable, well-bonded brick masonry with proper finishing and protection.
Sources: Clause 404.2.2, Clause 404.2.3, Clause 404.2.6.2, Clauses 404.2.7.1 to 404.2.7.4, Clause 404.2.8
Stone masonry for bridges as per IRC 40 follows IS:1597 (Part-I) for rubble stone and IS:1597 (Part-II) for ashlar masonry (Clause 404.3.1). Generally, coursed rubble stone masonry (first sort) is used, with ashlar masonry for facing if required (Clause 404.3.2). Random rubble masonry is generally not allowed except as per specific clause. Stones must be laid to lines, levels, and shapes shown in plans, with courses of uniform height not less than 160 mm (Clause 404.3.4.1, 404.3.4.5). Stones are wetted before laying to prevent water absorption (Clause 404.3.4.2). Stratified stones must be laid on natural beds with bed joints normal to pressure (Clause 404.3.4.3). Hearting stones are laid on broadest face, minimum 150 mm size, hammered and solidly bedded in mortar; plum stones provided at 900 mm centers for bonding (Clause 404.3.4.4). Mortar used is cement-sand 1:3 (Clause 404.3). For coping, minimum thickness is 150 mm with vertical joints spaced max 1.5 m (Clause 1.5). Mortar mixing, laying, curing, and finishing follow detailed procedures in Clauses 404.1 and 404.2.6. Key points include proper wetting, tooling, curing for 7 days, and no dry or hollow spaces in masonry (Clauses 404.2.6, 404.2.7, 404.3.4).
Sources: Clause 404.3.1, Clause 404.3.2, Clause 404.3.4.1, Clause 404.3.4.2, Clause 404.3.4.3, Clause 404.3.4.4, Clause 404.3.4.5, Clause 1.5, Clause 404.1.2, Clause 404.2.6, Clause 404.2.7
Key specifications and procedures for Concrete Block Masonry per IRC 40 include:
These ensure durability, strength, and proper workmanship in concrete block masonry.
Sources: Clause 402.5.1, Clause 402.5.2, Clause 402.6, Clause 404.4.2, Clause 404.4.3, Clause 404.5, Clause 405
Key specifications for arch construction and centering per IRC 40 include:
Arch Construction:
Centering:
Load Dispersion: Load through arch and filling considered at 45° to vertical; cushion above crown minimum 500 mm (Clause 403.3.2).
Permissible Compressive Stress Table (Excerpt):
| Mortar Mix (Cement:Lime:Sand) | Crushing Strength of Unit (MPa) | Permissible Compressive Stress (MPa) at 28 days |
|---|---|---|
| 1:3:0 | 7 | 1.7 |
| 1:3:0 | 10.5 | 2.1 |
| 1:3:0 | 14 | 2.5 |
(Refer to full Table 2 in Clause 403.4.1 for detailed values.)
This summary covers arch construction, centering design, permissible stresses, and load dispersion as per IRC 40 clauses 403, 404, and 405.
Sources: Clause 403.3.2, Clause 403.4.1, Clause 404.5.1, Clause 404.5.2, Clause 404.5.4.1, Clause 404.5.4.2, Clause 404.5.5
As per IRC 40, Clause 405 Expansion Gap, the expansion gap is a critical provision in masonry and bridge construction to accommodate thermal and structural movements. Although the exact formula or table for expansion gap sizing is not provided in the retrieved context, Clause 405 specifically addresses this requirement. Typically, expansion gaps are designed based on expected temperature variations, material properties, and structural dimensions to prevent cracking or damage. For precise values and detailed specifications, refer directly to Clause 405 in IRC 40, which covers expansion gap requirements comprehensively.
Sources: Clause 405 Expansion Gap
For Floor Protection Works as per IRC 40, Clause 406, the code refers to IRC:89 for detailed guidelines. Although IRC 40 does not provide explicit formulas or tables for floor protection, it emphasizes referring to IRC:89 for specifications. Additionally, general good practice includes ensuring proper bedding, curing, and use of suitable materials like concrete blocks with minimum thickness and density as per Clause 404.4.2 (minimum 200 mm thickness and density not less than 2.2 M ton/cum). Proper laying and curing methods are also critical, as described in Clause 404.4.3 and 404.4.5. For expansion gaps related to floor and masonry works, Clause 405 specifies a 40 mm gap for every 30 m length, filled with flexible material. For comprehensive design and construction details, consult IRC:89 as recommended.
Sources: Clause 406, Clause 404.4.2, Clause 404.4.3, Clause 405
Frequently Asked
For bridge masonry, only solid concrete blocks of normal weight conforming to IS:2185 Part-I shall be used, with a minimum compressive strength of 10.5 MPa as per Clauses 10.5 (404.4.1) and 10.5 (402.5.1). Hollow or lightweight concrete blocks are not permitted (Clause 402.5.2). The blocks must meet the dimensional, mix, manufacturing, curing, drying, and physical requirements specified in IS:2185 Part-I. Thus, the minimum size and density requirements are governed by IS:2185 Part-I standards for solid normal weight concrete blocks with at least 10.5 MPa compressive strength.
Sources: Clause 10.5: 404.4.1, Clause 10.5: 402.5.1, Clause 10.5: 402.5.2
Masonry arches should be constructed by first laying a full-scale shape of the arch on a leveled platform near the site, marking sizes and mortar thickness for each stone/block (Clause 404.5.1). Stones (voussoirs) must be cut to fit radial planes with radial joints parallel to the arch's transverse axis. The intrados face should be dressed to rest properly on the centering. Construction proceeds symmetrically about the crown with units laid in full mortar beds and joints grouted as needed (Clause 404.5.2). Pinning with spalls is not permitted. Each stone must be dry-fitted before final setting in mortar. Scaffolding must be strong and sound, capable of withstanding all loads, and holes left for scaffolding supports must be filled after removal (Clause 404.5.3). Centering design and erection are critical; it must support the arch ring during construction and be stripped only after masonry has hardened sufficiently (Clause 404.5.4 and 404.5.5). Stripping wedges should be removed gradually from crown outward without shock, typically after 2 to 4 weeks depending on span and rise-to-span ratio. For multiple spans, centering must not be removed before adjoining arches are built (Clause 404.5.5).
Sources: Clause 404.5.1, Clause 404.5.2, Clause 404.5.3, Clause 404.5.4, Clause 404.5.5
For brick masonry in bridge construction, curing shall be done by keeping the masonry work constantly moist on all faces for a period of seven days, with the top of masonry flooded with water at the end of each day's work, ensuring the green mortar is not disturbed or washed out. For composite mortar, curing starts two days after laying and continues for seven days. In hot weather, curing involves covering and wetting to prevent rapid drying (Clause 404.2.7.1 and 404.2.7.2). For stone masonry, stones must be sufficiently wetted before laying to prevent absorption of water from mortar (Clause 404.3.4.2). Additionally, curing of finishes like pointing or plastering should start as soon as the mortar hardens enough to avoid damage and be kept wet for at least seven days (Clause 404.2.7.3). Throughout curing, masonry must be protected from damage and drying out (Clause 404.2.7.4).
Sources: Clause 404.2.7.1, Clause 404.2.7.2, Clause 404.2.7.3, Clause 404.2.7.4, Clause 404.3.4.2
As per IRC 40, Clause 405.1, expansion gaps in long masonry walls are designed by providing a 40 mm wide gap for every 30 m length of the wall. This gap is intended to accommodate thermal expansion and contraction. The gap should be filled with premoulded bituminous sheet or any suitable flexible material to maintain continuity while allowing movement. Additionally, Clause 405.2 specifies that where foundations of abutments and return walls are at different levels, a minimum 40 mm gap must be left to separate them. This ensures structural integrity and prevents cracking due to differential movement.
Sources: Clause 405.1, Clause 405.2
For masonry piers and abutments in rivers with velocity exceeding 4.5 m/sec and carrying highly abrasive particles, IRC 40 Clause 4.5 (403.11.5) mandates the following special precautions:
Additionally, Clause 403.11.6 requires adequate weep holes spaced not more than 2 m horizontally and 1 m vertically, staggered, with the lowest row 150 mm above the low water or ground level. Weep holes should be 100 mm diameter AC pipes with a slope of 1 vertical to 20 horizontal towards the draining face, and a properly designed filter layer behind the wall to prevent hydrostatic pressure buildup.
These measures protect the masonry from abrasion, water pressure, and ensure drainage to maintain structural integrity under high-velocity river conditions.
Sources: Clause 4.5 (403.11.5), Clause 403.11.6
Ask AI about any clause, requirement, or provision in IRC 40. Get instant, clause-cited responses powered by our indexed library.
Free tier includes 150 queries (50 AI + 100 Reference) · No credit card required