The 1971 edition of IS 6061 Part 1 establishes detailed guidelines for building floors and roofs using precast reinforced or prestressed concrete joists combined with hollow cement concrete filler blocks. This standard details design principles, material requirements, manufacturing, handling, and installation methods to create robust, fire-resistant, and thermally insulated floor and roof assemblies suitable for spans up to 6 meters with composite topping concrete action.
Overview
The 1971 edition of IS 6061 Part 1 establishes detailed guidelines for building floors and roofs using precast reinforced or prestressed concrete joists combined with hollow cement concrete filler blocks. This standard details design principles, material requirements, manufacturing, handling, and installation methods to create robust, fire-resistant, and thermally insulated floor and roof assemblies suitable for spans up to 6 meters with composite topping concrete action.
Audience
Contents
Structure
IS 6061 Part 1 (1971) – Overview and Fundamental Specifications
| Finish Type | Relevant IS Standard |
|---|---|
| Cement concrete tiles | IS 1443-1959 |
| Terrazzo | IS 2114-1962 |
| Rubber | IS 1197-1970 |
| Linoleum | IS 1198-1958 |
| PVC | IS 5318-1969 |
| Epoxy resin | IS 4631-1968 |
| Bitumen mastic | IS 1196-1968 |
Note: Final test results should be rounded in accordance with IS 2-1960.
flowchart LR
PrecastJoists[Precast Reinforced Concrete Joists] --> HollowBlocks[Hollow Cement Concrete Filler Blocks]
HollowBlocks --> FloorRoofConstruction[Floor and Roof Assembly]
FloorRoofConstruction --> Advantages[Advantages: Durability, Fire Resistance, Thermal Insulation]
FloorRoofConstruction --> Limitations[Limitations: No Impact or Vibration Loads]
FloorRoofConstruction --> Testing[Test Requirements: Dimensions & Strength]
Refer Table B-2 of Clause 2.1.2 in IS 6061 Part 1 for detailed block sizes and strength values.
Scope Overview:
Sample Frequency (Clause 2.1.2):
Dimensional Limits (Clause 1.2):
| Parameter | Criteria |
|---|---|
| Sample Size | Minimum 2 blocks per lot/day |
| Test Type | Compressive strength test |
| Units | Millimeters for dimensions |
| Floor Finish Type | Corresponding IS Code |
|---|---|
| Cement concrete tiles | IS 1443-1959 |
| Terrazzo | IS 2114-1962 |
| Rubber | IS 1197-1970 |
| Linoleum | IS 1198-1958 |
| PVC | IS 5318-1969 |
| Epoxy resin | IS 4631-1968 |
| Bitumen mastic | IS 1196-1968 |
flowchart TD
HollowBlocks[Hollow Cement Concrete Blocks] --> SampleTesting[Sampling for Tests]
SampleTesting --> SampleQuantity{2 blocks/day or 2 per 1000}
HollowBlocks --> DimensionalTolerance[Dimensional Tolerances]
DimensionalTolerance --> HeightBreadth[±1.5 mm Height & Breadth]
DimensionalTolerance --> Length[+3.0 mm Length]
HollowBlocks --> StrengthTest[Compressive Strength Test]
StrengthTest --> TestSamples[Minimum 2 blocks tested]
Consult IS 6061 Part 1 for full dimensional and testing procedures.
Design Principles for Precast RCC/Prestressed Concrete Joists with Hollow Filler Blocks (IS 6061 Part 1)
| Block Dimensions (mm) | Minimum Compressive Strength (kN) |
|---|---|
| 400 x 200 x 100 | 3.5 |
| 400 x 200 x 150 | 4.5 |
(Refer actual IS 6061 Table B-2 for precise values)
flowchart LR
PrecastJoists[Precast RCC/PSC Joists] --> Spacing[Placed at Designed Spacing]
Spacing --> Span[Span Between Supports]
Span --> HollowBlocks[Hollow Concrete Filler Blocks]
HollowBlocks --> RCCDecking[In-situ RCC Decking]
Summary: Design joists as per Appendix A, install at specified spacing, utilize tested hollow blocks, and cast RCC topping following IS 456 and aggregate quality standards.
| Finish Type | Corresponding IS Standard |
|---|---|
| Cement concrete tiles | IS 1443:1959 |
| Terrazzo | IS 2114:1962 |
| Rubber | IS 1197:1970 |
| Linoleum | IS 1198:1958 |
| PVC | IS 5318:1969 |
| Epoxy resin | IS 4631:1968 |
| Bitumen mastic | IS 1196:1968 |
Referenced codes provide laying and finishing guidelines.
| Parameter | Requirement |
|---|---|
| Sampling Frequency | Two blocks daily or two per 1000 blocks |
| Tests Conducted | Dimension check and compressive strength |
| Measurement Units | Millimeters |
Refer IS 6061 Part II or IS 456 for reinforcement specifics and concrete standards.
flowchart TD
ConcreteBlocks[Concrete Blocks] --> Sampling[Sampling: 2 blocks/day or 2 per 1000]
Sampling --> Testing[Tests: Dimensions & Compressive Strength]
Joists[Precast Joists] --> ConcreteGrade[M-200 Grade Concrete (IS 456)]
FlooringFinishes --> CementTiles[IS 1443 Cement Tiles]
FlooringFinishes --> Terrazzo[IS 2114 Terrazzo]
FlooringFinishes --> Rubber[IS 1197 Rubber]
FlooringFinishes --> Linoleum[IS 1198 Linoleum]
FlooringFinishes --> PVC[IS 5318 PVC]
FlooringFinishes --> Epoxy[IS 4631 Epoxy Resin]
FlooringFinishes --> Bitumen[IS 1196 Bitumen Mastic]
Guidelines for Scheduling Construction Activities (IS 6061 Part 1)
Preparation of Supporting Structures (Clause 4.1):
Concrete Specification for Joists (Clause 2.1):
Precast Hollow Concrete Filler Blocks (Clause 3.6 & Appendix B):
| Parameter | Specification |
|---|---|
| Thickness | 75 mm |
| Mix Ratio | Cement:Sand:Coarse Aggregate = 1:2:4 |
| Purpose | Leveling and support over walls |
flowchart TD
StructuralElements[Complete Structural Elements] --> Curing[Cure Elements Thoroughly]
Curing --> ConcreteBed[Provide Concrete Bed if Necessary]
ConcreteBed --> Leveling[Finish Surface Level]
Leveling --> ServiceFixings[Arrange Service Fixings]
ServiceFixings --> FlooringWork[Commence Flooring/Roofing]
Summary: Ensure early finishing and curing of support structures, proper leveling with concrete bed, and service coordination before flooring/roofing. Use M-200 concrete for joists and verify filler blocks meet IS 6061 requirements.
Procedures for Storage, Transport, and Handling of Materials (IS 6061 Part 1)
Preparation of Supporting Elements: Complete curing of walls, pillars, beams before flooring/roofing. Provide 75 mm thick plain concrete bed (1:2:4) over load-bearing walls if required; ensure level top surfaces (Clause 4.1).
Handling Precast Joists (Clause 6.1):
Material Storage (Clause 5.1):
| Test Sample | Frequency |
|---|---|
| Hollow Blocks | Minimum 2 blocks per day or 2 per 1000 blocks |
flowchart TD
MaterialArrival[Material Arrival] --> Storage[Store on Firm Ground]
Storage --> Supports[Place Temporary Supports at Designated Points]
Supports --> Lifting[Lift with Care]
Lifting --> Transport[Transport with Supports]
Transport --> Placement[Place Without Damage]
References:
Following these steps helps maintain material integrity and structural performance.
Guidelines for Installing Floors or Roofs with Joists and Hollow Blocks (IS 6061 Part 1)
| Finish Type | IS Standard |
|---|---|
| Cement concrete tiles | IS 1443-1959 |
| Terrazzo | IS 2114-1962 |
| Rubber | IS 1197-1970 |
| Linoleum | IS 1198-1958 |
| PVC | IS 5318-1969 |
| Epoxy resin | IS 4631-1968 |
| Bitumen mastic | IS 1196-1968 |
graph TD
CeilingFinish[Optional Ceiling Finish] --> HollowBlocks[Precast Hollow Blocks]
HollowBlocks --> Joists[Precast Concrete Joists]
Joists --> RCCDecking[Structural RCC Topping]
RCCDecking --> FloorFinish[Floor Finishing Material]
Summary of Floor Finishing Standards (IS 6061 Part 1, 1971 Edition)
| Finish Type | IS Standard | Remarks |
|---|---|---|
| Cement concrete tiles | IS 1443-1959 | Applicable for plain & reinforced concrete |
| Terrazzo | IS 2114-1962 | Standard for terrazzo finishes |
| Rubber | IS 1197-1970 | Rubber flooring code |
| Linoleum | IS 1198-1958 | Linoleum floor standards |
| PVC | IS 5318-1969 | PVC sheet and tile finishes |
| Epoxy resin | IS 4631-1968 | Epoxy resin floor toppings |
| Bitumen mastic | IS 1196-1968 | Bitumen mastic floors |
| Mix Ratio | Cement | Sand | Aggregate | Thickness |
|---|---|---|---|---|
| 1 : 2 : 4 | 1 part | 2 parts | 4 parts | 75 mm minimum |
graph TD
SupportStructure[Supporting Structure] --> ConcreteBed[Concrete Leveling Bed (75 mm, 1:2:4)]
ConcreteBed --> StructuralTopping[Concrete Topping (M-200 Grade)]
StructuralTopping --> FloorFinish[Floor Finish per IS Codes]
FloorFinish --> FinalSurface[Final Floor Surface]
Specifications and Design Guidance for Precast Reinforced/Prestressed Concrete Joists (IS 6061 Part 1)
Maximum Span:
Joist Depth:
Joist Width: Uniform width along length (Clause A-1.1).
Design Standards:
Reinforcement Details:
| Span Range (m) | Joist Depth (mm) |
|---|---|
| ≤ 4.2 | 150 |
| 4.2 – 6 | 200 |
flowchart LR
SpanUnder4_2[Span ≤ 4.2 m] --> Depth150[Depth = 150 mm]
Span4_2to6[Span 4.2 - 6 m] --> Depth200[Depth = 200 mm]
DesignProcess[Design] --> JoistType{Joist Type}
JoistType --> Reinforced[Reinforced - IS 456:1964]
JoistType --> Prestressed[Prestressed - IS 1343:1960]
Reinforcement --> Reinforced & Prestressed
For comprehensive reinforcement and prestressing layouts, consult Appendix A of IS 6061 Part 1.
Specifications for Precast Hollow Cement Concrete Filler Blocks (IS 6061 Part 1)
| Parameter | Specification |
|---|---|
| Typical Block Size | ~230 × 100 × 450 mm |
| Joist Spacing | 600 mm (reinforce if ≥ 750 mm) |
| Strength Testing | 2 blocks per batch or 2/1000 tested |
| Minimum Strength | ≥ 3.5 MPa (check Table B-2) |
| Reinforcement Requirement | Mandatory for spans ≥ 750 mm |
flowchart LR
HollowBlock[Precast Hollow Block] --> JoistSpacing{Joist Spacing}
JoistSpacing -->|< 750 mm| NoReinforcement[No Reinforcement Needed]
JoistSpacing -->|≥ 750 mm| ReinforcementNeeded[Provide Reinforcement]
HollowBlock --> StrengthTesting[Breaking Strength Test]
StrengthTesting --> TestSamples{Test 2 blocks per batch or per 1000}
TestSamples --> PassCriteria[Pass if ≥ 3.5 MPa]
Refer to Appendix B and Fig. 2 of IS 6061 Part 1 for exact dimensions and reinforcement specifications.
Frequently Asked
Recommended Dimensions and Spacing for Precast Concrete Joists (IS 6061 Part 1):
Joist Depth:
Joist Width: Uniform width throughout, depending on design requirements.
Maximum Span: Should not exceed 6 meters.
Spacing: Joists should be positioned at design-specified intervals spanning between supports, typically based on structural loads and filler block dimensions.
Design Codes: Structural design must comply with IS 456 for reinforced concrete and IS 1343 for prestressed concrete.
| Span (m) | Joist Depth (mm) | Maximum Span (m) | Spacing |
|---|---|---|---|
| ≤ 4.2 | 150 | ≤ 6 | As per structural design |
| 4.2 – 6 | 200 | ≤ 6 | As per structural design |
Loading diagram...
This arrangement ensures uniform load distribution and structural integrity.
Material Specifications for Hollow Cement Concrete Filler Blocks (IS 6061 Part 1):
| Property | Specification |
|---|---|
| Compressive Strength | ≥ 7.5 MPa (75 kg/cm²) |
| Cement Type | OPC (IS 269 or IS 8112) |
| Aggregate Quality | Clean, IS 383 compliant |
| Water-Cement Ratio | 0.4 – 0.5 |
| Reinforcement Requirement | For spans ≥ 750 mm |
| Testing | Breaking strength per Appendix B |
Loading diagram...
For precise dimensions and reinforcement details, refer to Appendix B and Fig. 2.
Based on IS 6061 Part 1, precast joists require careful curing and handling to maintain integrity:
This procedure promotes strength gain and minimizes cracking or physical damage.
Per IS 6061 Part 1, the topping concrete for composite action with joists should have the following characteristics:
Concrete Grade: Structural topping concrete of grade M-150 as per IS 456-1964.
Minimum Thickness: 50 mm over the hollow filler blocks.
Reinforcement:
Surface Finish:
This ensures effective composite (T-beam) action between the precast joists and the topping slab.
Loading diagram...
According to IS 6061 Part 1, load transfer and support criteria are:
| Parameter | Specification |
|---|---|
| Bearing Length on Joist | Minimum 25 mm |
| Joist Spacing | 600 mm centers |
| End Gaps Between Joists | Filled flush with masonry/concrete |
This ensures stable load transmission from filler blocks to joists and supports.
Loading diagram...