IS 1200 PART 21974AI Search Enabled✦ AI Generated

Method of measurement of building and civil engineering works, Part 2: concrete works
1974 Edition

The IS 1200 Part 2 (1974) outlines a uniform procedure for measuring concrete works in construction and civil engineering projects throughout India. It details the methods for quantifying various concrete elements such as slabs, beams, columns, precast units, and specialized components, facilitating consistent measurement for precise cost estimation and contract administration. This code is indispensable for engineers, contractors, and quantity surveyors involved in concrete construction measurement.

14Sections
143Clauses Indexed
AI Search Ready
1974Edition
Methods of Measurement of Works of Civil EngineeringCategory
Alternative search terms: concrete-works-measurement-methods-for-building-and-civil-engineering-1974 PDF, concrete-works-measurement-methods-for-building-and-civil-engineering-1974 pdf free download, concrete-works-measurement-methods-for-building-and-civil-engineering-1974 free download pdf, concrete-works-measurement-methods-for-building-and-civil-engineering-1974 PDF, concrete-works-measurement-methods-for-building-and-civil-engineering-1974 PDF, concrete-works-measurement-methods-for-building-and-civil-engineering-1974 1974 PDF, concrete-works-measurement-methods-for-building-and-civil-engineering-1974:1974 PDF, concrete-works-measurement-methods-for-building-and-civil-engineering-1974-1974 PDF, concrete-works-measurement-methods-for-building-and-civil-engineering-1974 (1974) PDF, concrete-works-measurement-methods-for-building-and-civil-engineering-1974 1974 edition PDF, concrete-works-measurement-methods-for-building-and-civil-engineering-1974 edition 1974 PDF

What This Standard Covers

The IS 1200 Part 2 (1974) outlines a uniform procedure for measuring concrete works in construction and civil engineering projects throughout India. It details the methods for quantifying various concrete elements such as slabs, beams, columns, precast units, and specialized components, facilitating consistent measurement for precise cost estimation and contract administration. This code is indispensable for engineers, contractors, and quantity surveyors involved in concrete construction measurement.

Who Uses This Standard

  • Structural Engineers
  • Quantity Surveyors
  • Construction Contractors
  • Project Cost Estimators
  • Civil Engineering Professionals
  • Site Supervisors
  • Contract Administrators

Key Topics Covered

Units for measuring concrete works
Classification of concrete structural elements
Measurement procedures for plain and reinforced concrete
Quantifying precast concrete components
Measurement of beams, columns, slabs, and walls
Measuring concrete in special elements like chajjas and channels
Assessment of concrete fencing posts
Measurement of grout holes and waterproofing areas
Handling cutting, toothing, and bonding in concrete
Treatment of cavities and openings in concrete works
Measurement of in situ prestressed concrete
Item description and documentation standards
Criteria for volume deductions and inclusions
Measurement of concrete casings for steel members

Table of Contents

1Scope of Concrete Works Measurement
2Fundamental Rules for Measuring Concrete
3Standard Units for Concrete Measurement
4Classification and Quantification of Concrete Components
4.1Measuring Plain and Reinforced Concrete
4.2Measurement of Concrete in Structural Elements
4.3Measuring Precast Concrete Elements
4.4Measurement Guidelines for Prestressed Concrete Cast In Situ
4.5Measurement and Installation of Precast Concrete Units
4.6Special Considerations: Cutting, Toothing, Bonding, Grout Holes, and Waterproofing
5Item Description and Documentation Requirements
6Additions and Deductions in Measurement
7Measurement of Concrete Fencing Posts
8Rounding and Finalizing Measurement Values

Popular Questions About IS 1200 PART 2

?What units of measurement are prescribed by IS 1200 Part 2 for different concrete elements?

IS 1200 Part 2 specifies the following units for measuring concrete works in buildings and civil engineering: concrete volume is quantified in cubic meters (m³). Structural elements like slabs, beams, columns, foundations, and walls are measured based on their net volume after accounting for openings or voids. Formwork areas are measured separately in square meters (m²). Reinforcement quantities are typically measured separately according to relevant standards. The volume of concrete is calculated using Length × Breadth × Depth, with openings larger than 0.1 m² deducted from the volume. The standard excludes concrete measurement for roads, piling, wells, and tunneling as these are covered in other parts of IS 1200.

?How are precast concrete components measured in accordance with this standard?

As per IS 1200 Part 2 (1974), precast concrete components are measured using specific units based on their type: wall panels and floor or roof slabs are measured in square meters (m²); beams, columns, and trusses are measured either by running meters or by count; channel units and purlins use running meters or numbers; string courses, copings, bed plates, anchor blocks, window sills, shelves, louvers, steps, and staircases are measured similarly by running meters or numbers. Solid and hollow blockwork are measured in cubic meters (m³) or square meters (m²). Lightweight partitions are measured in square meters with thickness specified. Door and window frames are measured in running meters with size details. Waffle units are quantified by area or count. Water tanks are counted individually. Jallies (filled openings) are measured in square meters with thickness stated, and fencing posts are measured either by number or cubic meters. Additionally, finishing work on precast elements is measured separately, and hoisting, transport, assembly, and setting are included in measurements unless otherwise noted.

?Does the standard provide guidance on measuring concrete in combined elements such as chajjas with beams or slabs?

Yes, IS 1200 Part 2 provides specific instructions for measuring concrete in combined elements like chajjas with beams or slabs. When a chajja is integrated with a beam or lintel, the shared section is measured as chajja, considering the clear projection inclusive of bearing. If the chajja extends as a roof or suspended slab, measurement is taken up to the central line of the bearing. For chajjas combined with vertical fins or facias, the measurement of the chajja is taken clear between these vertical elements, while the fins or facias themselves are measured in full. A chajja with thickness up to 100 mm is classified and measured as a chajja; if its thickness exceeds 100 mm, it is measured as a slab. This approach avoids double measurement and clearly defines boundaries for such composite concrete elements.

?How should cutting, toothing, and bonding in concrete walls be measured according to the standard?

IS 1200 Part 2 outlines the measurement of cutting, toothing, and bonding in concrete works as follows: grooves and chases are measured in running meters multiplied by the girth of the cut; holes, mortices, and openings are measured per centimeter depth based on their area categories—up to 250 cm² and between 250 cm² to 0.1 m²—using the net required area rather than the actual cut area. Cutting of reinforced concrete surfaces exposing reinforcement is measured in square meters with the depth specified. Toothing and bonding, which involve labour and materials for connecting new concrete walls to existing structures, are also measured in square meters. These precise measurement protocols ensure accurate costing and control during execution.

?Are reinforcement materials included in the concrete measurements or are they measured separately?

According to IS 1200 Part 2, reinforcement is generally quantified separately from concrete. Clause 4.1.5 specifies that reinforcement measurement is to be done independently, with additional details provided in IS 1200 Part 8. However, if concrete and reinforcement are combined as a single item, this must be explicitly stated in the description, and different reinforcement configurations require separate measurement. For precast concrete, reinforcement might be included or measured separately depending on the item description. Structural concrete in members such as columns, beams, and slabs is always measured separately from reinforcement. This distinction maintains clarity and prevents double counting in quantities and billing.