bitumen mastic for tanking and damp-proofing
1987 Edition

The standard IS 5871:1987 outlines the specifications and composition requirements for bitumen mastic utilized in waterproofing and damp-proofing, particularly in structures like underground tanks, basements, water storage units, and swimming pools. It provides guidance on material selection, preparation methods, and quality benchmarks to ensure effective moisture resistance and long-lasting performance.

12Sections
81Clauses Indexed
AI Search Ready
1987Edition
Waterproofing and Damp-ProofingCategory
Alternative search terms: bitumen-mastic-for-waterproofing-and-dampproofing-1987 PDF, bitumen-mastic-for-waterproofing-and-dampproofing-1987 pdf free download, bitumen-mastic-for-waterproofing-and-dampproofing-1987 free download pdf, bitumen-mastic-for-waterproofing-and-dampproofing-1987 PDF, bitumen-mastic-for-waterproofing-and-dampproofing-1987 PDF, bitumen-mastic-for-waterproofing-and-dampproofing-1987 1987 PDF, bitumen-mastic-for-waterproofing-and-dampproofing-1987:1987 PDF, bitumen-mastic-for-waterproofing-and-dampproofing-1987-1987 PDF, bitumen-mastic-for-waterproofing-and-dampproofing-1987 (1987) PDF, bitumen-mastic-for-waterproofing-and-dampproofing-1987 1987 edition PDF, bitumen-mastic-for-waterproofing-and-dampproofing-1987 edition 1987 PDF

What This Standard Covers

The standard IS 5871:1987 outlines the specifications and composition requirements for bitumen mastic utilized in waterproofing and damp-proofing, particularly in structures like underground tanks, basements, water storage units, and swimming pools. It provides guidance on material selection, preparation methods, and quality benchmarks to ensure effective moisture resistance and long-lasting performance.

Who Uses This Standard

  • Structural Engineers
  • Waterproofing Experts
  • Construction Site Supervisors
  • Material Testing Agencies
  • Building Contractors
  • Quality Assurance Inspectors
  • Architectural Designers

Key Topics Covered

Applicability and scope of bitumen mastic
Constituent materials including bitumen, aggregates, and fillers
Critical physical characteristics and quality standards for bitumen
Procedures for mixing and manufacturing bitumen mastic
Recommended temperature ranges for heating and blending
Sampling methods and compliance evaluation
Applications of bitumen mastic in waterproofing and tanking
Testing approaches for hardness and other physical attributes
Instructions on preparing pre-fabricated bitumen blocks
Standards for filler and aggregate particle size distribution
Handling and application best practices
Compatibility considerations with other waterproofing substances

Table of Contents

1Introduction and Scope of Bitumen Mastic
2Referenced Standards and Key Material Properties
3Terminology and Definitions
4Material Specifications and Requirements
5Manufacturing Process and Composition Details
6Physical Characteristics and Performance Criteria
7Sampling Procedures and Conformity Assessment
8Testing Methods and Protocols
9Packaging, Labeling, and Storage Guidelines
10Instructions for Application and Use
11Safety Measures and Handling Recommendations
12Annexures and Supplementary Information

Popular Questions About IS 5871

?What are the required physical properties of bitumen used in the mastic composition?

According to IS 5871, the bitumen used in mastic should contain 15% to 17% soluble bitumen by weight. The bitumen must be heated to temperatures between 170°C and 180°C before mixing. Aggregates are heated separately to 190–205°C, and mixing occurs without exceeding 205°C. The final mastic should exhibit a semi-fluid consistency at approximately 180°C, allowing it to be easily compressed into a uniform, compact layer. The aggregate gradation must include particles passing 75 microns (42–52%), between 75 and 212 microns (3–10%), between 212 and 600 microns (15–25%), and between 600 microns and 2.36 mm (7–20%), with no particles retained above 2.36 mm. This gradation ensures a dense, flexible, and impermeable mastic suitable for damp-proofing applications.

?How should bitumen mastic be heated and mixed to achieve optimal quality?

For effective preparation per IS 5871, aggregates and fillers are blended and heated to temperatures ranging from 190°C to 205°C. Separately, bitumen is heated to between 170°C and 180°C. The heated bitumen is then combined with the hot aggregates in a mechanically agitated mastic cooker, ensuring the temperature does not surpass 205°C during mixing. The cooker should discharge the entire batch within 30 minutes. At around 180°C, the mastic attains a semi-fluid state that can be easily compressed by trowels into a consistent, compact layer. This method maintains uniformity, prevents overheating, and preserves the quality and workability of the mastic.

?Which types of aggregates and fillers are recommended for use in bitumen mastic?

IS 5871 recommends using fine aggregates such as natural sand, crushed limestone, or crushed hard rock, blended with mineral fillers. These materials should be properly graded and heated to 190–205°C before the addition of bitumen. The bitumen itself is heated separately between 170°C and 180°C. The combined materials are mixed mechanically, not exceeding 205°C, to produce a semi-fluid mastic suitable for forming compressible, compact, and uniform layers for waterproofing.

?Is it permissible to pre-manufacture bitumen mastic in blocks and transport them to the construction site?

Yes, IS 5871 allows for bitumen mastic to be pre-produced in factory conditions, cast into blocks, and transported to project locations. These blocks should be broken down into manageable portions on-site, then reheated and remixed before application. The mastic, when heated to about 180°C, should maintain a semi-fluid consistency that is easily compressible with trowels. Sampling procedures require collecting pieces from a minimum of six randomly selected blocks to ensure quality. This approach facilitates quality control, ease of handling, and maintains the mastic’s performance during application.

?What are the criteria for confirming conformity to IS 5871 standards?

Conformity to IS 5871 is determined by verifying that the bitumen mastic meets specified composition and physical property requirements, including bitumen content and gradation of fillers. The bitumen must satisfy parameters such as softening point, penetration, and ductility within defined ranges. Performance tests for water impermeability, adhesion, and durability under standardized conditions are also essential. Sampling and testing procedures, as referenced in IS 334 and IS 4911, must be followed. Products consistently passing these evaluations are deemed compliant with IS 5871 standards.